Loading...
Fellowship-LR 990316 REPORT OF SOIL-LIME MIX'I ~RE PULVERIZATION 8001 C~rpenter Frwy., Suite 100 D~ll~s. Texas 75247 Date of Service: 03/16/99 Report No.: 9907765 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas 6616 Forest Park Rd. Phase III - Expansion Dallas, Texas 75235 Coppell, Texas Contractor: Specification Requirements: Test Location: Paving area Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1-3/4" Sieve #4 Sieve Test No. Location %Pass % Pass 1 Grid line 410N/75W 100 67 2 Grid line 420N/125W 100 69 3 Grid line 425N/175W 100 66 4 Grid line 400N/210W 100 70 5 Grid line 410N/290W i00 68 6 Grid line 400N/350W 100 60 7 Grid line 380N/410W 100 66 Technician: R. Montgomery Started:11:00 am Stopped: 12:00 pm 3:00 pm 4:00 pm ~ Report Distribution: tngineerin~ Inc. (1) Julian P. Barry General Contractors ( 1 ) Urban Architecture (1) City o£ Grapevine (I) City of Coppell Eugene Harbour Vice President 309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.