Fellowship-LR 990316 REPORT OF SOIL-LIME MIX'I ~RE PULVERIZATION
8001 C~rpenter Frwy., Suite 100
D~ll~s. Texas 75247
Date of Service: 03/16/99 Report No.: 9907765
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
6616 Forest Park Rd. Phase III - Expansion
Dallas, Texas 75235 Coppell, Texas
Contractor: Specification Requirements:
Test Location: Paving area Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" Sieve #4 Sieve
Test No. Location %Pass % Pass
1 Grid line 410N/75W 100 67
2 Grid line 420N/125W 100 69
3 Grid line 425N/175W 100 66
4 Grid line 400N/210W 100 70
5 Grid line 410N/290W i00 68
6 Grid line 400N/350W 100 60
7 Grid line 380N/410W 100 66
Technician: R. Montgomery Started:11:00 am Stopped: 12:00 pm
3:00 pm 4:00 pm ~
Report Distribution: tngineerin~ Inc.
(1) Julian P. Barry General Contractors
( 1 ) Urban Architecture
(1) City o£ Grapevine
(I) City of Coppell Eugene Harbour
Vice President
309ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.