Loading...
WA9301-SP 970929City of Dallas Date: September. 29, 1'997 To: Bar Constructors,' Inc2 P.O. Box 10 . Lancaster, Texas '75146-0010 Attention: Ms. Lucy Garcia Subject: Coppell 2 Metering Station' Contract No. 94-81 Gentlemen: We are returning the following submittal data: Submittal No. 15010-04 DISPOSITION IDENTIFICATION DESCRIPTION Drawing AK13933 Baker ;cries 200 Sleeve Type Coupling 9 3 X Distribution: Design Engineer - 1 Project Manager - 5 (Pile - 1), (Pield - 2), (Coppell - 1), (Pumping -!) Water Utilities Department Design Services · 320 E..Jefferson, ~m 213 · Dallas, Texas 75203 · 214 / 948-4576 · FAX 214 / 948-4599 A city utility providing regional water and wastewater services vital to public health and safety. Baugh & Associates, Inc. Products Marketing Specialists 11203 Jones Rd. West * Houston, Texas 77065 Phone (281) 807-9696 * Fax (281) 807-4607 SUBMITTAL DATA -- For COUPLINGS For 2 METERING STATION For CITY OF COPPELL, TX PREPARED BY: BAUGH & ASSOCIATES, INC. September 18, 1997 NO EXCEPTION TAKEN MAKE CORRECTIONS NOTED REVISE AND RESUBMIT REJECT E D FOR RECORD ONLY REVIEW BY THE ENGINEER DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR CONFORMANCE WITH CONTRACT REQUIREMENTS. PROJECT C' ~ 9,~ 'P . M V CONTRACT # ~(~r-'~ I DALLAS WATER UTILITIES DEPT. REVIEWED BAR CON811tUCTORS, INC. DATE c~/,~ ~-l,:} '~ BY :~ TRAN8. it /,S~lO-c~ BAR Constructo~ in¢ represents have determined itd veilfled all ~ll we dimensions altd mell~remenls field construc6on {:~Iterf~ mataria ' an Gasket Bolt Le th Middle Ring T \\ \\ \\ \\ '~ \\ \\ \\ ////////~/////I //////////////,~//// Pipe O.D I //// Follower Ring 1. MIDDLE RING ASTM A36/A53 Minim. Yield 36,000 PSI Cold Expanded 1% 3. GASKET Baker SBR per ASTM D2000 ANSI A21.11/AWWA C-111 5. LINING Baker Shop Coat BAKER SERIES 200 COUPLING 2. FOLLOWER RING AISI C1020/1021 Single Mill Section Cold Expanded 1% 4. BOLT High Strength Low Alloy per AWWA C-Ill with heavy hex nuts per ASTM A563 6. COATING Baker Shop Coat All dimensions are in inches. Flexible couplings do not provide uainst Dull out of Dine CouDlings meets the provisions of ANSI/AWWA C219-91 { Couplings standard for plain end pipe Pipe Item OD I 12.75 Catalog Number 200-12.75 Middle Ring Overall Bolt/Threaded Rod Weight Diameter ( LBS ) T L ( O. A. D ) Qty Diam Lgth 1/4 7 17-1/8 8 5/8 11 62 Working Pressure (PSi) 558 2 24.00 200- 24.00 1/4 7 28-3/8 14 5/8 11 110 303 3 25.80 200- 25.80 3/8 7 30-1/8 14 5/8 11 138 420 BAKER COUPLING COMPANY., INC. 2929 S. Santa Fe Los Angeles, CA 90058 213-583-3444 Outside Calif. 800-247-7164 irm: NON Ch: STD psi: STD Cnst: Baugh & Associates P. O#: B1365- COPPELL Proj: Coppell 2 M. Sta., Coppall, TX Baker Fax: 800-247-1174 c: CSHOP L: LSHOP Bolt: AB DATE: 09-12-1997 Drawn by: rns DWG#: AK-13933 Rev: 0 Mee. F_Conet:EXP fre-l: 8432 fre-2:1468 THESE INSTRUCTIONS MUST BE FORWARDED TO THE INSTALLER BAKER COUPLING COMPANY INC. Manufacturers- Couplings, Adaptors, & Specialties 2929 So. Santa Fe Avenue 213-583-3444 Los Angeles, CA 90058 800-247-7164 FAX 213-587-4258 INSTALLATION INSTRUCTIONS FOR BAKER SERIFS 200 COUPLINGS July 1992 !. Measure pipe diameter at 8 places 45 deg. apart. Difference between minimum and maximum should not exceed *(C) . ff the difference is greater than (C), make correc__i_ions by rounding up the pipe with trench jacks, or suitable wooden post and wedges. Maintain this roundness until the joint is made up, and all torqueing has been completed. *-Refer to TABLE ON PIPE END TOLERANCES on Page Two. 2. Pipe ends must be clean and free of all oil, dirt, loose scale & rust. A thorough dearsing with a wire brush is recommended. All welds on pipe ends must be ground smooth. ASSEMBLY: i. Place a end ring on each pipe end. If the end ring(s) does not easily slip on pipe, correct pipe out-of- roundness with jacks or posts as noted above in I. 2. The gaskets should be cleaned and inspected for any damage in shipment, and then stretched over pipe ends. It may be helpful to wet the gaskets with water to make installation easier. 3. Place the center sleeve on one pipe end. Place gasket and other end ring on the other pipe end. Slide the center sleeve into position and center over gap between the two pipe ends. 4. IMPORTANT: The clearance between the OD of the pipe ends and the ID of the center sleeve and end rings is to be distributed as evenly as possible. No more than I/8" ~ or opesainf is permi-.~ible. Wooden wedges or plastic shims may be used. These centering aids may be removed after the coupling is assembled. The wedges or shims must not project into the gasket pocket. 5. Be sure that the gasket pocket in the end ring(s) is free from wood, dirt, metal or other ~dd debris. 6. Apply *flax soap to the gasket and center sleeve bevel face, and push gaskets into place. (In winter, use ethylene glycol mixture). *Pipe joint Lubiicant, Secord Corp, Camden, NJ, or equal. 7. Push end rings against gasket, and rotate one end ring until bolt holes line up. !. Insert all bolts, tighten nuts finger tight. It is convenient to tighten bolts by downward wrenching. Insert bolts so nuts are on the !eft side of the installer, as he faces the pipe. STAINLESS STEEL NUTS SHOULD BE FIELD LUBRICATED WITH A SUITABLE ANTI GALLING COMPOUND PRIOR TO BOLT TIGHTENING. 2. Be certain that the end ring(s) is started over the center sleeve without any interferenee. If necessary, wedges may be used to free the end ring(s) from the edge of the center sleeve. BOLTED SLEEVE TYPE COUPLINGS DO NOT PROVIDE PROTECrIO N A GAINST PULLOUT OF PIPE. (2) 3. On couplings 60** and larger, 3 or 4 installers can best tighten. Space the installers equally around the coupling, and have all advance in the same direction as they tighten each nut. Be certain that the end ring does not "cock" as the nuts are tightened. A torqlleahwdlhla wrm4, eatsst be p.ml. Tighten to 30-35 foot pounds all around, two or three times. Increase the wrench setting to 40-50 foot pounds, and continue the procedure to 75 foot pounds for 5/8" belts and 90 foot pounds for 3/4" and larger belts. At the maximum tightness, go around the coupling several times to assure uniform gasket pressure. 4. Before final tightening, it is good technique to strike each belt head with a light Sledge hammer to seat all parts. 5. AFTER FINAL TIGHTENING HAS BEEN COMPLETED, remove all pipe roundup material. RETIGtFFENING OF BOLTS: After 24 hours, or just before filling with water, it may be necessary to check the tightness of the belts. Follow the last torque setting as shown abeve. TESTING: !f leaks devdope during the test procedm~, tightm as necessary to stop leaks. Cautionshould be exercised to assure lhat end ring, emter sleeve or the boiling hardware is not ovt, nd~c.ucd during this CAUTION: A pipe section should never be allowed to HANG in the coupling. either before or after making up the joint. Couplings are designed to FLOAT on the pipe ends. not support the pipe. PIPE END PREPARATION: The pipe shall he sufficiently free from indentations, projections, or roll marks for a distance 18" from the end of the pipe to make a tight joint with the rubher gasket type of coupling. For a distance of 18" from the end of the pipe, the pipe circumference shall not he more than (A) largeror (B) smaller than the outside circumference computed from the specified outside diameter. All of the out-of- roundness shall he in the form of a smooth oval that can he jacked round in such a manner that the difference between the maximam and minimum diameters shall not exceed (C) . TABLE ON PiPE END TOLERANCES (A) (B) (C) PIPE ( + ) (-) MIN OD TOL TOL MAX 12"-42" Follow AWWA C-219, Table 4, Page 12 for all applications 44"-72" !/8" !/16" 1/8" 73"-96" 3/16" !/16" I/8" 97"-120' !/4" 1/16" 3/16' 120" & up i/4" 1/16" !/4" NQTE; Series 216 Insulating Couplings and Series 602 Flanged Coupling Adapters may be installed using these instructions. INSULATING BOOT(s). Position boot(s) over pipe end(s), then follow these '.atomadjoin from the beginning. IMPORTANT. ASSEMBLY 4., above, is modified so tlmt l/4" opening at anyone place ~s pa'mi~_~ prior to me boot(s) ~ iraerred over the pipe ends. BOLTED ~,EEVE ~ COUPLINGS DO NOT PROVIDE PROTECTION AGAINST PULLOUT OF PIPE BAKER follows the provisions outlined in AWWA C-219 when manufacturing BOLTED SLEEVE TYPE COUPLINGS, FLANGED COUPLING ADAPTERS, or related products. l