DCT Fellowship- PN1308215
mn
Z
w_ an
1'-4"-
O.
1 V-4
20'-6" 20'-6" 20'-0" 20'-0"
CL CL CL
N N )
CD Cor` Co 0 Co 0 0
0 0 CD_
20)-0"
1
5'-6"
4p 01
9'-0" 5'-6"
10
VERIFY WIDTH
CL CL
201-
0"
12'-0"
U% Ol PARTIAL FOUNDATION PLAN
20'-0" 20'-0" 20'-0" 20'-0"
ALL NEW DOORS AND LEVELERS TO MATCH
02/S2.1 EXISTING
CENTER ALL NEW DOORS
AND LEVELERS
BETWEEN EXISTING COLS
20'-0"
n
NEW EXISTING
20'-0"
4
EACHv
COL ® EACH COL PANEL JOINT
ASSUMED)
02 ELEVATION
IV ww
ALL NEW DOORS AND LEVELERS TO MATCH
EXISTING
PAINT ALL BELOW GRADE STEEL
W/ (2) COATS OF ASPHALTIC
PAINT
TECHNI STRUCTURES,INC.
STRUCTURAL ENGINEERING CONSULTANTS
5220 McKinney Avenue
Sone 300
Dallas, Texas 7520S
214/528.1725 (FAX) 214/528-2163
H
Q Z
W
Y W
0'- O
a U)
co
x
H
O
Z 7Q
D Q-
J O
W D
C)
W Co
LL z
ti C/)
ti X
I` W
C
L0
nN
N
CL
Q QO
o OLL
0
of
in v in in in in cin i
w- r
ZQ_N_N.
U
0 0 0 0 4000
ALL NEW DOORS AND LEVELERS TO MATCH
02/S2.1 EXISTING
CENTER ALL NEW DOORS
AND LEVELERS
BETWEEN EXISTING COLS
20'-0"
n
NEW EXISTING
20'-0"
4
EACHv
COL ® EACH COL PANEL JOINT
ASSUMED)
02 ELEVATION
IV ww
ALL NEW DOORS AND LEVELERS TO MATCH
EXISTING
PAINT ALL BELOW GRADE STEEL
W/ (2) COATS OF ASPHALTIC
PAINT
TECHNI STRUCTURES,INC.
STRUCTURAL ENGINEERING CONSULTANTS
5220 McKinney Avenue
Sone 300
Dallas, Texas 7520S
214/528.1725 (FAX) 214/528-2163
H
Q Z
W
Y W
0'- O
a U)
co
x
H
O
Z 7Q
D Q-
J O
W D
C)
W Co
LL z
ti C/)
ti X
I` W
RECEIVED
AUG 21 2013
PLANNING [- pts
Project No.: 2013-171
Issued: AUGUST, 2013
Drawn By: MDR
Checked By: DEG
Scale: AS NOTED
Sheet Title
PANEL OPENING
PLAN & ELEVATION
S2.1
Sheet Number
C
L0
nN
N
Q QO
o OLL
0
of
WQQUXOu7
co~ 1?O
i1 Z w M
0 p dw- r
ZQ_N_N.
U
J x0LU
e
RECEIVED
AUG 21 2013
PLANNING [- pts
Project No.: 2013-171
Issued: AUGUST, 2013
Drawn By: MDR
Checked By: DEG
Scale: AS NOTED
Sheet Title
PANEL OPENING
PLAN & ELEVATION
S2.1
Sheet Number
C
0
a
UN
C
Q
D) j
O
z
RECEIVED
AUG 21 2013
PLANNING [- pts
Project No.: 2013-171
Issued: AUGUST, 2013
Drawn By: MDR
Checked By: DEG
Scale: AS NOTED
Sheet Title
PANEL OPENING
PLAN & ELEVATION
S2.1
Sheet Number