Fairfield Inn- PN140723150'-8"
T.O. PARAPET
145'-0"
JOIST BRG.
HIGHEST ACCESSIBLE FLOOR - 36-0" B2
136'-0"
4TH FLOOR
T.O. SHTG.
J4 125'-0"
3RD FLOOR
T.O. SHTG.
114'-0"
2ND FLOOR
T.O. SHTG.
Id
100'-0"
T.O. SLAB
S2
FRONT ELEVATION (FACING SH 121
SCALE: 3/32" = V-0"
T
S2
160'-1"
T.O. CANOPY\ -
3A
A200
J4 157'-0"
T.O. PARAPET _________________--
B1
160'-8" OIL
T.O. PARAPET
1 --- --- --- 1-- --- - ------ -
In''nl n n
I I i .
FF ml
219'-10112"
FRONT ELEVATION MATERIALS
TOTAL SURFACE AREA
BRICK
8,652 SQ. FT.
BRICK
2,072 SQ, FT.
TOTAL MASONRY
41437 SQ. FT.
STONE
91%
KFZ
21738 SQ. FT.
TOTAL MASONRY
CHANNEL LETTERS RED IN COLOR
7)175 SQ. FT,
PERCENTAGE 83%
SIGN INFORMATION
BUILDING
FRONTAGE (2 SIDES)
311'-0"
ALLOWED PROVIDED
FRONT SIGN AREA 220 SQ. FT.
W
47 SQ. FT,
SIDE SIGN AREA 45 SQ. FT. 33 SQ. FT,
SIDE SIGN AREA
W
45 SQ. FT. 33 SQ. FT.
TOTAL 311 SQ. FT. 115 SQ. FT.
Q- SIDE ELEVATION
SCALE: 3/32"
LEFT SIDE ELEVATION MATERIALS
TOTAL SURFACE AREA 41448 SQ. FT.
BRICK 1,976 SQ. FT.
STONE 2,072 SQ, FT.
TOTAL MASONRY 41048 SQ. FT.
PERCENTAGE 91%
121'-4"
PARAPET
T CANOPY)
2'-0"
PARAPET
VESTIBULE)
B2
B1
EXTERIOR FINISH SCHEDULE
EIFS COLOR 1 _ BRICK/STONE
DRYVIT REFLECTIT ELDORADO STONES1COLORTOMATCH61
CLIFFSTONE
BENJAMIN MOORE CAMBRIA
WHI TE"
EIFS COLOR 2
S2 DRYVIT COLOR TO ---- - -----
BRICK COLOR TOMATCHBENJAMINB2
MOORE "POWELL MATCH BENJAMIN
MOORE "LOG CABINBUFFHC -35",
NOTE: SANDPEBBLE FINISH 2163-10"
1. FINISH OF ALL PTAC/VTAC LOUVERS
TO MATCH ALUMINUM WINDOW FINISH,O B2 BRICK COLOR TO
UNLESS NOTED OTHERWISE. MATCH BENJAMIN
2. FINISH OF ALL OTHER LOUVERS TO MOORE "METALLIC
MATCH WALL ON WHICH IT OCCURS. N0' GOLD 2163-40"
3. ALL EIFS TO BE 1 1/2" UNLESS NOTED 3% OF HEIGHT: 1'-6"
OTHERWISE. PARAPET CAP VERTICAL HEIGHT: 1'-6"
4. STORE FRONTS TO BE CLEAR ANODIZED
ALUMINUM.
5. PAINT METAL FASCIA, TRIM AND
COPING TO MATCH ADJACENT WALL
COLOR.
FLAG NOTES
D1" EIFS REVEAL, TYPICAL.
ALIGN & COORDINATE REVEALS ALONG ENTIRE FACADE OF BUILDING.
DEIFS V -GROOVE AT COLOR TRANSITION LOCATION.
DENTRY CANOPY- BOTTOM OF CANOPY AT 8'-10".
DLOUVERED SUNSHADE. - BOTTOM OF SUNSHADE AT 8'-10".
DVERTICAL STRIP LIGHT FIXTURE.
DLIGHT COVE.
DOTAL SHADED AREA = 33 SQ. FT
LETTERS FASTENED WITH 2" J -CLIPS
16-3 3/16'
o
REVISIONS
PROJ. DATE:
FILE NAME: 14155_A200 -A201
NN&SUITES
1:1
CHECKED BY:
AArnott
DRAWN BY: KFZ
FAIRFIELD INN & SUITES" INDIVIDUAL MARRIOTT' INDIVIDUAL CHANNEL LETTERS
CHANNEL LETTERS RED IN COLOR
WHITE IN COLOR RED LED ILLUMINATION
WHITE LED ILLUMINATION
3E;
ENLARGED SIGN
SCALE: 3116" = 1'-0"
FAIRFIELD INN & SUITES" INDIVIDUAL "MARRIOTT" INDIVIDUAL CHANNEL LETTERS
CHANNEL LETTERS - RED IN COLOR
WHITE IN COLOR - RED LED ILLUMINATION
WHITE LED ILLUMINATION
3A
ENLARGED SIGN
FRONT ELEVATION
4
TRASH ENCLOSURE
SCALE: 3/32"
PREFABRICATED METAL GATE
PIVOTING GATE LATCHES
FABRICATED FROM 112"0 GALV
STEEL RODS
PROVIDE 3/4"Ox4" DEEP SLEEVES
IN CONC PAVEMENT FOR LATCHES
TOTAL SHADED AREA = 47 SQ. FT -
LETTERS FASTENED WITH 2'J -CLIPS
a
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION, ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB #
REVISIONS
PROJ. DATE:
con
FILE NAME: 14155_A200 -A201
W
1:1
CHECKED BY:
E -o
DRAWN BY: KFZ
con
UnW
W d-
W
V
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION, ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB # 08*
PROJ. DATE: 12-30-2008
FILE NAME: 14155_A200 -A201
DWG. SCALE: 1:1
CHECKED BY:
DRAWN BY: KFZ
SHEET DESCRIPTION
DESCRIPTION
EXTERIOR ELEVATIONS
A200
B2
157'-0"
T.O. PARAPE1 t4, 0r,
PARAPET
150'-8' - _- --------
T.O.
S2
T.O. PARAPET T= i ; ^ }
J-1
1_. ___ ._. _a-.. --T ----- - --- 145 - 0 _ - _ L , _r _ _r -_,_ T_ - _ _ l
r , r r - _- -_.___ ,--. JOIST BRG. -.r ., '-, ? - - --' - •-- ---
r _, ,- --1 - - -- r_ 1_ -
Q_LmT_r____----
I ' _ _ _. 1_I , __1_ _ ------ 136 0_
I , 4TH FLOOR ' --L- -'- -.r _-.. ' -- L --- ' ---a- -
AL1 _ = L -T_ ..-'- 1 L _L_ _1_ _ _,_7_._ r-- -r - T.O. SHTG. -_
7 --
I_::, -_ C -r -- -
EL
7T --
T_
i, I
rTFD]
r r --
I IILIr„ I ,
125 -0
3RD FLOOR r -- -'- r _
i.
T.O. SHTG. `-L _. -
I
L L
f r
T ,
114 0
T_ -- — - -- ---- ---- - - 2ND FLOOR - - r , IT -+
T_s r
rS_ I
T 0 SHTG r ,- ._- _>---__ — -- - - ---, __r^ -- - _, • ,
PARAPET _ _ ____ _ -- _.,^ _ _ -- _ T.O. fir- I_: o _ -, - -- }- o00 . _ , o - - - -- , -- - KITCHEN -- - --C_, 1. _ __. 0 - -- - LIEEy
1
64100'-0
T.O. SLAB
B1 B1 B1
0REAR ELEVATION
160'-8”
T.O. PARAPET
REAR ELEVATION MATERIALS
TOTAL SURFACE AREA 87280 SQ. FT.
BRICK 41466 SQ, FT.
STONE 2,668 SQ. FT.
TOTAL MASONRY 7,134 SQ. FT.
PERCENTAGE 86%
3B 157'-0"
T- B2 A200 1
T.O. PARAPET
62 150'-8° h
T.O. PARAPET
L - S2 - -r-a_
t
k—in,R-F-- j 145'-0" h
r _ _
r
JOIST BRG.
T
r = r 136'-0" h
7
i i _
4TH FLOOR
T.O. SHTG.
T 1T-
L
Tr3
r r
125'-0» OLL------------ Tt - 1A201_ -- i - :
3RD FLOOR
T.O. SHTG.
S1 - -
CIS i --I --
a 1 - 1 - r
121'-4" r
r
T T
T.O. PARAPET E—L
r
AT CANOPY) --= -- - - :: y1= s S _ F L r
r.
L .Z ± 14, 0,.
r=, L - = I - "DF1112'-0"- - -
L - _ _:; _ - - '
3 i-
A
fT.O. PARAPET , _ -__ _ - — _ ___? - - _-(-- L= ( B1(
VESTIBULE)
KITCHEN)
1 -
i
Y
LL
1
f47
61 B2
B1
2
RIGHT SIED ELEVATION
SCALE: 3/32" = V-0"
RIGHT SIDE ELEVATION MATERIALS
TOTAL SURFACE AREA 41459 SQ. FT.
BRICK 11632 SQ. FT.
STONE 21289 SQ. FT.
TOTAL MASONRY 31921 SQ. FT.
PERCENTAGE 87%
S1- WHITE METAL PANEL SOFFIT
62
81
14"X2" HOLLOW STEEL TUBE
EXTERIOR FINISH SCHEDULE
EIFS COLOR 1 _ BRICK/STONE
DRYVIT REFLECTIT ELDORADO STONES1COLORTOMATCH (:ECLIFFSTONE
BENJAMIN MOORE _ CAMBRIA
WHITE"
EIFS COLOR 2
S2 DRYVIT COLOR TO
MATCH BENJAMIN B2 BRICK COLOR TO
MOORE "POWELL MATCH BENJAMIN
BUFF HC -35", MOORE "LOG CABIN
2163-
NOTE: SANDPEBBLE FINISH 2163-10"
1. FINISH OF ALL PTAC/VTAC LOUVERS
TO MATCH ALUMINUM WINDOW FINISH,O B2 BRICK COLOR TO
UNLESS NOTED OTHERWISE. MATCH BENJAMIN
2. FINISH OF ALL OTHER LOUVERS TO MOORE "METALLIC
MATCH WALL ON WHICH IT OCCURS. N0' GOLD 2163-40"
3. ALL EIFS TO BE 1 1/2" UNLESS NOTED 3% OF HEIGHT: 1'-6"
OTHERWISE. PARAPET CAP VERTICAL HEIGHT: 1'-6"
4. STORE FRONTS TO BE CLEAR ANODIZED
ALUMINUM.
5. PAINT METAL FASCIA, TRIM AND
COPING TO MATCH ADJACENT WALL
COLOR.
FLAG NOTES
D1" EIFS REVEAL, TYPICAL.
1
E L, C L.
ALIGN &COORDINATE REVEALS ALONGLNG ENTIRE FACADE OF BUILDING.
D2 EIFS V -GROOVE AT COLOR TRANSITION LOCATION.
D3 ENTRY CANOPY- BOTTOM OF CANOPY AT 8'-10".
DLOUVERED - 4 ED SUNSHADE. BOTTOM OF SUNSHADE AT 8' 10 .
D5 VERTICAL STRIP LIGHT FIXTURE.
DLIGHT COVE.
EXTERIOR PLYWOOD
SHEATHING ON 2x6
oennrnlc n ,sn r ,
10"X2" HOLLOW STEEL TUBE NON- _
STRUCTURAL LOUVERS
NOTE: NOTE:
T7
EACH MOVEMENT CONTROL MONUMENT SIGN NOT TO
W
SIGN NOT TO EXCEED 3 SQ. FT. EXCEED 60 SQ FT.
SITE SIGNAGE
APPROXIMATE SIZE OF SIGN
1,-5 X 2._2.
APPROXIMATE SIZE OF SIGN .
5._8. X 9._0..
4 SIGN TO BE ILLUMINATED SIGN TO BE ILLUMINATED
HOLLOW STEEL TUBE BEAM
ROUND STEEL COLUMNS
STEEL COLUMN
S2
PRECAST STONE COPING AT TOP
I
ZfSTONE
VENEER BENCH W/
i CONCRETE CURB
INTERNALLY BY FLUORESCENT INTERNALLY BY FLUORESCENT
LAMPS
CVN
Message Options
MOVEMENT CONTROL SIGN MONUMENT SIGN
A
NOTE: NOTE:
12-30-2008
EACH MOVEMENT CONTROL MONUMENT SIGN NOT TO
W
SIGN NOT TO EXCEED 3 SQ. FT. EXCEED 60 SQ FT.
SITE SIGNAGE
APPROXIMATE SIZE OF SIGN
1,-5 X 2._2.
APPROXIMATE SIZE OF SIGN .
5._8. X 9._0..
4 SIGN TO BE ILLUMINATED SIGN TO BE ILLUMINATED
NOT TO SCALE INTERNALLY BY FLUORESCENT INTERNALLY BY FLUORESCENT
LAMPS LAMPS.
A
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB #
REVISIONS
PROJ, DATE: 12-30-2008
FILE NAME: 14155_A200 -A201
W
1:1
CHECKED BY:
E-
DRAWN BY: KFZ
conL
W
0
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB # 08###
PROJ, DATE: 12-30-2008
FILE NAME: 14155_A200 -A201
DWG. SCALE: 1:1
CHECKED BY:
DRAWN BY: KFZ
SHEET DESCRIPTION
DESCRIPTION
EXTERIOR ELEVATIONS
A201