Loading...
Fairfield Inn- PN140723150'-8" T.O. PARAPET 145'-0" JOIST BRG. HIGHEST ACCESSIBLE FLOOR - 36-0" B2 136'-0" 4TH FLOOR T.O. SHTG. J4 125'-0" 3RD FLOOR T.O. SHTG. 114'-0" 2ND FLOOR T.O. SHTG. Id 100'-0" T.O. SLAB S2 FRONT ELEVATION (FACING SH 121 SCALE: 3/32" = V-0" T S2 160'-1" T.O. CANOPY\ - 3A A200 J4 157'-0" T.O. PARAPET _________________-- B1 160'-8" OIL T.O. PARAPET 1 --- --- --- 1-- --- - ------ - In''nl n n I I i . FF ml 219'-10112" FRONT ELEVATION MATERIALS TOTAL SURFACE AREA BRICK 8,652 SQ. FT. BRICK 2,072 SQ, FT. TOTAL MASONRY 41437 SQ. FT. STONE 91% KFZ 21738 SQ. FT. TOTAL MASONRY CHANNEL LETTERS RED IN COLOR 7)175 SQ. FT, PERCENTAGE 83% SIGN INFORMATION BUILDING FRONTAGE (2 SIDES) 311'-0" ALLOWED PROVIDED FRONT SIGN AREA 220 SQ. FT. W 47 SQ. FT, SIDE SIGN AREA 45 SQ. FT. 33 SQ. FT, SIDE SIGN AREA W 45 SQ. FT. 33 SQ. FT. TOTAL 311 SQ. FT. 115 SQ. FT. Q- SIDE ELEVATION SCALE: 3/32" LEFT SIDE ELEVATION MATERIALS TOTAL SURFACE AREA 41448 SQ. FT. BRICK 1,976 SQ. FT. STONE 2,072 SQ, FT. TOTAL MASONRY 41048 SQ. FT. PERCENTAGE 91% 121'-4" PARAPET T CANOPY) 2'-0" PARAPET VESTIBULE) B2 B1 EXTERIOR FINISH SCHEDULE EIFS COLOR 1 _ BRICK/STONE DRYVIT REFLECTIT ELDORADO STONES1COLORTOMATCH61 CLIFFSTONE BENJAMIN MOORE CAMBRIA WHI TE" EIFS COLOR 2 S2 DRYVIT COLOR TO ---- - ----- BRICK COLOR TOMATCHBENJAMINB2 MOORE "POWELL MATCH BENJAMIN MOORE "LOG CABINBUFFHC -35", NOTE: SANDPEBBLE FINISH 2163-10" 1. FINISH OF ALL PTAC/VTAC LOUVERS TO MATCH ALUMINUM WINDOW FINISH,O B2 BRICK COLOR TO UNLESS NOTED OTHERWISE. MATCH BENJAMIN 2. FINISH OF ALL OTHER LOUVERS TO MOORE "METALLIC MATCH WALL ON WHICH IT OCCURS. N0' GOLD 2163-40" 3. ALL EIFS TO BE 1 1/2" UNLESS NOTED 3% OF HEIGHT: 1'-6" OTHERWISE. PARAPET CAP VERTICAL HEIGHT: 1'-6" 4. STORE FRONTS TO BE CLEAR ANODIZED ALUMINUM. 5. PAINT METAL FASCIA, TRIM AND COPING TO MATCH ADJACENT WALL COLOR. FLAG NOTES D1" EIFS REVEAL, TYPICAL. ALIGN & COORDINATE REVEALS ALONG ENTIRE FACADE OF BUILDING. DEIFS V -GROOVE AT COLOR TRANSITION LOCATION. DENTRY CANOPY- BOTTOM OF CANOPY AT 8'-10". DLOUVERED SUNSHADE. - BOTTOM OF SUNSHADE AT 8'-10". DVERTICAL STRIP LIGHT FIXTURE. DLIGHT COVE. DOTAL SHADED AREA = 33 SQ. FT LETTERS FASTENED WITH 2" J -CLIPS 16-3 3/16' o REVISIONS PROJ. DATE: FILE NAME: 14155_A200 -A201 NN&SUITES 1:1 CHECKED BY: AArnott DRAWN BY: KFZ FAIRFIELD INN & SUITES" INDIVIDUAL MARRIOTT' INDIVIDUAL CHANNEL LETTERS CHANNEL LETTERS RED IN COLOR WHITE IN COLOR RED LED ILLUMINATION WHITE LED ILLUMINATION 3E; ENLARGED SIGN SCALE: 3116" = 1'-0" FAIRFIELD INN & SUITES" INDIVIDUAL "MARRIOTT" INDIVIDUAL CHANNEL LETTERS CHANNEL LETTERS - RED IN COLOR WHITE IN COLOR - RED LED ILLUMINATION WHITE LED ILLUMINATION 3A ENLARGED SIGN FRONT ELEVATION 4 TRASH ENCLOSURE SCALE: 3/32" PREFABRICATED METAL GATE PIVOTING GATE LATCHES FABRICATED FROM 112"0 GALV STEEL RODS PROVIDE 3/4"Ox4" DEEP SLEEVES IN CONC PAVEMENT FOR LATCHES TOTAL SHADED AREA = 47 SQ. FT - LETTERS FASTENED WITH 2'J -CLIPS a PLEASE BE ADVISED THAT THIS SET OF PLANS HAS BEEN PREPARED FOR BUILDING CODE AND PLAN REVIEW ONLY. THIS SET OF PLANS SHOULD BE CONSIDERED PRELIMINARY AND NOT FOR ANY BIDDING, FINAL ESTIMATE OR CONSTRUCTION. THIS SET OF PLANS SHALL NOT BE DEEMED FINAL UNTIL ALL APPROVALS HAVE BEEN OBTAINED FROM ALL CODE AUTHORITIES HAVING JURISDICTION, ANY BID SUBMITTED, BASED ON THIS SET OF PRELIMINARY PLANS, IS SUBJECT TO CHANGE AND IS INCOMPLETE. LJA JOB # REVISIONS PROJ. DATE: con FILE NAME: 14155_A200 -A201 W 1:1 CHECKED BY: E -o DRAWN BY: KFZ con UnW W d- W V PLEASE BE ADVISED THAT THIS SET OF PLANS HAS BEEN PREPARED FOR BUILDING CODE AND PLAN REVIEW ONLY. THIS SET OF PLANS SHOULD BE CONSIDERED PRELIMINARY AND NOT FOR ANY BIDDING, FINAL ESTIMATE OR CONSTRUCTION. THIS SET OF PLANS SHALL NOT BE DEEMED FINAL UNTIL ALL APPROVALS HAVE BEEN OBTAINED FROM ALL CODE AUTHORITIES HAVING JURISDICTION, ANY BID SUBMITTED, BASED ON THIS SET OF PRELIMINARY PLANS, IS SUBJECT TO CHANGE AND IS INCOMPLETE. LJA JOB # 08* PROJ. DATE: 12-30-2008 FILE NAME: 14155_A200 -A201 DWG. SCALE: 1:1 CHECKED BY: DRAWN BY: KFZ SHEET DESCRIPTION DESCRIPTION EXTERIOR ELEVATIONS A200 B2 157'-0" T.O. PARAPE1 t4, 0r, PARAPET 150'-8' - _- -------- T.O. S2 T.O. PARAPET T= i ; ^ } J-1 1_. ___ ._. _a-.. --T ----- - --- 145 - 0 _ - _ L , _r _ _r -_,_ T_ - _ _ l r , r r - _- -_.___ ,--. JOIST BRG. -.r ., '-, ? - - --' - •-- --- r _, ,- --1 - - -- r_ 1_ - Q_LmT_r____---- I ' _ _ _. 1_I , __1_ _ ------ 136 0_ I , 4TH FLOOR ' --L- -'- -.r _-.. ' -- L --- ' ---a- - AL1 _ = L -T_ ..-'- 1 L _L_ _1_ _ _,_7_._ r-- -r - T.O. SHTG. -_ 7 -- I_::, -_ C -r -- - EL 7T -- T_ i, I rTFD] r r -- I IILIr„ I , 125 -0 3RD FLOOR r -- -'- r _ i. T.O. SHTG. `-L _. - I L L f r T , 114 0 T_ -- — - -- ---- ---- - - 2ND FLOOR - - r , IT -+ T_s r rS_ I T 0 SHTG r ,- ._- _>---__ — -- - - ---, __r^ -- - _, • , PARAPET _ _ ____ _ -- _.,^ _ _ -- _ T.O. fir- I_: o _ -, - -- }- o00 . _ , o - - - -- , -- - KITCHEN -- - --C_, 1. _ __. 0 - -- - LIEEy 1 64100'-0 T.O. SLAB B1 B1 B1 0REAR ELEVATION 160'-8” T.O. PARAPET REAR ELEVATION MATERIALS TOTAL SURFACE AREA 87280 SQ. FT. BRICK 41466 SQ, FT. STONE 2,668 SQ. FT. TOTAL MASONRY 7,134 SQ. FT. PERCENTAGE 86% 3B 157'-0" T- B2 A200 1 T.O. PARAPET 62 150'-8° h T.O. PARAPET L - S2 - -r-a_ t k—in,R-F-- j 145'-0" h r _ _ r JOIST BRG. T r = r 136'-0" h 7 i i _ 4TH FLOOR T.O. SHTG. T 1T- L Tr3 r r 125'-0» OLL------------ Tt - 1A201_ -- i - : 3RD FLOOR T.O. SHTG. S1 - - CIS i --I -- a 1 - 1 - r 121'-4" r r T T T.O. PARAPET E—L r AT CANOPY) --= -- - - :: y1= s S _ F L r r. L .Z ± 14, 0,. r=, L - = I - "DF1112'-0"- - - L - _ _:; _ - - ' 3 i- A fT.O. PARAPET , _ -__ _ - — _ ___? - - _-(-- L= ( B1( VESTIBULE) KITCHEN) 1 - i Y LL 1 f47 61 B2 B1 2 RIGHT SIED ELEVATION SCALE: 3/32" = V-0" RIGHT SIDE ELEVATION MATERIALS TOTAL SURFACE AREA 41459 SQ. FT. BRICK 11632 SQ. FT. STONE 21289 SQ. FT. TOTAL MASONRY 31921 SQ. FT. PERCENTAGE 87% S1- WHITE METAL PANEL SOFFIT 62 81 14"X2" HOLLOW STEEL TUBE EXTERIOR FINISH SCHEDULE EIFS COLOR 1 _ BRICK/STONE DRYVIT REFLECTIT ELDORADO STONES1COLORTOMATCH (:ECLIFFSTONE BENJAMIN MOORE _ CAMBRIA WHITE" EIFS COLOR 2 S2 DRYVIT COLOR TO MATCH BENJAMIN B2 BRICK COLOR TO MOORE "POWELL MATCH BENJAMIN BUFF HC -35", MOORE "LOG CABIN 2163- NOTE: SANDPEBBLE FINISH 2163-10" 1. FINISH OF ALL PTAC/VTAC LOUVERS TO MATCH ALUMINUM WINDOW FINISH,O B2 BRICK COLOR TO UNLESS NOTED OTHERWISE. MATCH BENJAMIN 2. FINISH OF ALL OTHER LOUVERS TO MOORE "METALLIC MATCH WALL ON WHICH IT OCCURS. N0' GOLD 2163-40" 3. ALL EIFS TO BE 1 1/2" UNLESS NOTED 3% OF HEIGHT: 1'-6" OTHERWISE. PARAPET CAP VERTICAL HEIGHT: 1'-6" 4. STORE FRONTS TO BE CLEAR ANODIZED ALUMINUM. 5. PAINT METAL FASCIA, TRIM AND COPING TO MATCH ADJACENT WALL COLOR. FLAG NOTES D1" EIFS REVEAL, TYPICAL. 1 E L, C L. ALIGN &COORDINATE REVEALS ALONGLNG ENTIRE FACADE OF BUILDING. D2 EIFS V -GROOVE AT COLOR TRANSITION LOCATION. D3 ENTRY CANOPY- BOTTOM OF CANOPY AT 8'-10". DLOUVERED - 4 ED SUNSHADE. BOTTOM OF SUNSHADE AT 8' 10 . D5 VERTICAL STRIP LIGHT FIXTURE. DLIGHT COVE. EXTERIOR PLYWOOD SHEATHING ON 2x6 oennrnlc n ,sn r , 10"X2" HOLLOW STEEL TUBE NON- _ STRUCTURAL LOUVERS NOTE: NOTE: T7 EACH MOVEMENT CONTROL MONUMENT SIGN NOT TO W SIGN NOT TO EXCEED 3 SQ. FT. EXCEED 60 SQ FT. SITE SIGNAGE APPROXIMATE SIZE OF SIGN 1,-5 X 2._2. APPROXIMATE SIZE OF SIGN . 5._8. X 9._0.. 4 SIGN TO BE ILLUMINATED SIGN TO BE ILLUMINATED HOLLOW STEEL TUBE BEAM ROUND STEEL COLUMNS STEEL COLUMN S2 PRECAST STONE COPING AT TOP I ZfSTONE VENEER BENCH W/ i CONCRETE CURB INTERNALLY BY FLUORESCENT INTERNALLY BY FLUORESCENT LAMPS CVN Message Options MOVEMENT CONTROL SIGN MONUMENT SIGN A NOTE: NOTE: 12-30-2008 EACH MOVEMENT CONTROL MONUMENT SIGN NOT TO W SIGN NOT TO EXCEED 3 SQ. FT. EXCEED 60 SQ FT. SITE SIGNAGE APPROXIMATE SIZE OF SIGN 1,-5 X 2._2. APPROXIMATE SIZE OF SIGN . 5._8. X 9._0.. 4 SIGN TO BE ILLUMINATED SIGN TO BE ILLUMINATED NOT TO SCALE INTERNALLY BY FLUORESCENT INTERNALLY BY FLUORESCENT LAMPS LAMPS. A PLEASE BE ADVISED THAT THIS SET OF PLANS HAS BEEN PREPARED FOR BUILDING CODE AND PLAN REVIEW ONLY. THIS SET OF PLANS SHOULD BE CONSIDERED PRELIMINARY AND NOT FOR ANY BIDDING, FINAL ESTIMATE OR CONSTRUCTION. THIS SET OF PLANS SHALL NOT BE DEEMED FINAL UNTIL ALL APPROVALS HAVE BEEN OBTAINED FROM ALL CODE AUTHORITIES HAVING JURISDICTION. ANY BID SUBMITTED, BASED ON THIS SET OF PRELIMINARY PLANS, IS SUBJECT TO CHANGE AND IS INCOMPLETE. LJA JOB # REVISIONS PROJ, DATE: 12-30-2008 FILE NAME: 14155_A200 -A201 W 1:1 CHECKED BY: E- DRAWN BY: KFZ conL W 0 PLEASE BE ADVISED THAT THIS SET OF PLANS HAS BEEN PREPARED FOR BUILDING CODE AND PLAN REVIEW ONLY. THIS SET OF PLANS SHOULD BE CONSIDERED PRELIMINARY AND NOT FOR ANY BIDDING, FINAL ESTIMATE OR CONSTRUCTION. THIS SET OF PLANS SHALL NOT BE DEEMED FINAL UNTIL ALL APPROVALS HAVE BEEN OBTAINED FROM ALL CODE AUTHORITIES HAVING JURISDICTION. ANY BID SUBMITTED, BASED ON THIS SET OF PRELIMINARY PLANS, IS SUBJECT TO CHANGE AND IS INCOMPLETE. LJA JOB # 08### PROJ, DATE: 12-30-2008 FILE NAME: 14155_A200 -A201 DWG. SCALE: 1:1 CHECKED BY: DRAWN BY: KFZ SHEET DESCRIPTION DESCRIPTION EXTERIOR ELEVATIONS A201