Loading...
Fellowship-LR 990225 (3)IN-PLACE DENSITY _ ESTING "" ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/18/1999 Report No.: 9905456 Report Date 02/25/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: PROJECT DATA CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximmn Project Requirements Md) No. Description Moisture % Density pcf Moisture Density I Dark gray clay 23.5 98.5 -1/+3% 95% FIELD DENSITY TESTS TEST bUD MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) 39 35' west of Storm Line A, 6th lift I 23.8 94.8 96 40 275' west of Storm Line A, 6th lift 1 24.0 96.7 98 Test results on this report meet project specification. Backfill at ExisEing Drainage Channel Technician: Roy Montgomery ~ Engine~f.~ Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (I) City of Coppcll This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1