Loading...
Fellowship-LR 990217REPORT OF LIME DE'I _RMINATION 8901 ~ter Frwy., Suite 100 Dalltm. Texas 75247 Date of Service: 02/17/99 Report No.: 9905334 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry Gen. Contractors Project: Fellowship of Las Colinas 6616 Forest Park Road Phase III - Expansion Dallas, Texas 75235 Coppell, Texas Services: Sample in situ soil from designated area and determine the reduction of Plasticity Index based on percentage of lime added. RESULTS OF LABORATORY TEST Soil Description: Dark brown and gray clay Sample Location: Paving subgrade Preparation: Wet Results: Lime Liquid Plastic Plasticity Lime Required Added Limit Limit Index pH (Ibs./s.y.) NONE 54 27 27 7.73 0.0 2% 54 37 17 11.70 8.8 4% 54 42 12 12.35 17.6 6% 53 50 3 12.48 26.5 8% 51 50 1 12.57 35.3 *Based on a 6-inch depth an assumed soil unit weight of 98 pounds per cubic foot. The quantity of lime shown is intented to treat only 6 inches of soil. Should additional depth be treated during the mixing operation, additional lime will be required to compensate for the extra depth. The Civil Engineer should be consulted for a determination of quantity of lime required. (HBC Engineering would recommend a ~ addition rate of 6 percent lime.) Technician: R. Montgomery Report Distribution: '~ (1) Julian P. Barry General Contractors (1) Urban Architecture (1) City of Grapevine ~.- . (1) City of Coppell Vice President This report is exclusively for the use of the client indicated above and shall not bi: reproduced in full without written approval of HBC Engineering, Inc.