Fellowship-LR 990303CONCRETE COMPR JSIVE STRENGTH
ENG--, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 02/15/1999 Report No.: 9905083 Report Date
03/03/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/15/1999 BATCH TIME: 3:30pm
PLANT: TIME SAMPLED: 3:30pm aY: Terry L. Smith
SPECIFICATION REQUIREMENTS WEATHER CONI)rrIONS: Clear and mild
STm~NGTH: 3600 psi @ 28 Days TEMPERATUm~ (F)-AIR 62 V CONCRETE: 76 V
SLUMP: 3" Max TRUCK NO: 460 TICKET NO: 164353
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Type B Manhole, Inlet//6
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Same as placement
REPORT OF TESTS ACCUMULATIVE YARDS: 7
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 2.50 02/22/1999 7 83370 2950
1 2 2.50 02/22/1999 7 76890 2720
Average 2840
1 3 2.50 03/15/1999 28
1 4 2.50 03/15/1999 28
Technician Time: 2 hours
Technician: Terry L. Smith Started: Finished: ~ i~n~}eering, Inc.
Report Distribution:
(1) Julian P. Barry General Contractors
(1) Urban Architecture t' Eugene Harbour
(1) City of Grapevine ~ Vice President
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.