Loading...
Fellowship-LR 990316 (2)CONCRETE COMPRL.SIVE STRENGTH TES_ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/15/1999 Report No.: 9905083 Report Date 03/16/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas ' Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/15/1999 BATCH TIME: 3:30pm PLANT: TIME SAMPLED: 3:30pm BY: Terry L. Smith SPECIFICATION REQUIREMENTS WEATHER COm)ITIONS: Clear and mild STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F)- AIR 62 F CONCRETE: 76 V SLLrMP: 3" Max TRUCK NO: 460 TICKET NO: 164353 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Type B Manhole, Inlet #6 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Same as placement REPORT OF TESTS ACCUMULATIVE YARDS: 7 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD. STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 ! 2.50 02/22/1999 7 83370 2950 I 2 2.50 02/22/i999 7 76890 2720 Average 2840 1 3 2.50 03/15/1999 28 119500 4230 i 4 2.50 03/15/1999 28 127490 4510 Average 4370 Technician Time: 2 hours Technician: Terry L. Smith Started: Finished: ~ Faa~~o. Inc. Report Distribution: (I) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1