Fellowship-LR 990315CONCRETE COMPRL iSIVE STRENGTH TEL
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 02/12/1999 Report No.: 9904900 Report Date
03/15/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: CC 1055A
CONCRETE SUPPLIER: Custom-Create PLACEMENT DATE: 02/12/1999 BATCH TIME: 6:15pm
PLANT: N/A TIME SAMPLED: 6:20pm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTIt: 3600 psi @ 28 Days TEMPERATURE (F)- AIR 49 r CONCRETE: 60 F
SLUMP: 5" Max TRUCK NO: 437 TICKET NO: N/A
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Inlets - 2nd lift of 1st inlet #35 and 1st list of inlet #29
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 2nd lift of #35
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.00 02/!9/1999 7 64330 2270
1 2 5.00 02/19/1999 7 87130 3080
Average 2680
I 3 5.00 03/12/1999 28 126020 4460
1 4 5.00 03/12/1999 28 131730 4660
Average 4560
NOTE: Concrete was sampled from truck.
Technician: Greg Dimock Started: 2:30pm Finished: 7:00pm I'"BC En nc.
Report Distribution: ~
(1) Julian P. Barry General Contractors ~ w
(1) Urban Architecture Eugene Harbour
(1) City of Grapevine Vice President
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01TM Page 1 of 1