Loading...
Fellowship-LR 990222 (2)CONCRETE COMPRL.SIVE STRENGTH TES _ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/11/1999 Report No.: 9904768 Report Date 02/22/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry 6eneral Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: 4060 CONCRETE SUPPLIER: Custom Crete, Inc. PLACEMENT DATE: 02/1 1/1999 BATCH TIME: N/A PLANT: 1 TIME SAMPLED: 4:56pm BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 52 F CONCRETE: 61 F SLUMP: 3-5" TRUCK NO: 436 TICKET NO: 163925 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Inlets//28, 31, 35 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Inlet 35 REPORT OF TESTS ACCUMULATIVE YARDS: 9 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 4.25 02/18/1999 7 129490 4580 1 2 4.25 02/18/1999 7 134170 4740 Average 4660 I 3 4.25 03/11/1999 28 1 4 4.25 03/11/1999 28 Technician: Jack Farris Started: 2:00pm Finished: 6:30pm ~ ~noinoll~.Inc. Engin , Inc. Report Distribution: (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1