Loading...
ST0502A-CS160205 Fort Worth1100 Macon StreetFort Worth, Texas 76102817.336.5773 Dallas17304 Preston Road, Suite 1340Dallas, Texas 75252214.461.9867 Denton1517 Centre Place Drive, Suite 320Denton, Texas 76205940.383.4177 Sherman200 North Travis Street, Suite 500Sherman, Texas 903.870.1089 Registered by the Texas Board of Professional Engineers, No. F-230 Registered by the Texas Board of Professional Surveyors, No. 100116-00 engineers surveyors landscape architects www.tnpinc.com Field Memorandum To: Michael Garza, Rick O’dell (City of Coppell) From: Jonathan Payne (TNP) cc: Chris Schmitt, P.E. (TNP) Punch Date: February 4, 2016 Memo Date: February 5, 2016 RE: Freeport Parkway South – Civil Punch List 1.  Pick up debris in channel and under bridge.  (Photo A)  2. Add railing at northwest corner of the bridge to fill in the gap.  (Photo B)  3. The seal is missing on 2‐3 feet of expansion joint at the southwest end of the bridge deck.   South bound inside lane.  This needs to be corrected. (Photo C)  4. Expansion joint cover plates need to be installed along all bridge sidewalk expansion joints.   See TxDOT detail BS‐EJCP included in the plans.  These plates were considered subsidiary to  the trail pavement. See spec page 5‐15.  (Photo D)  5. All rail installation needs to be completed throughout the job. (Photo E)  6. All sidewalk expansion joints need to be sealed with self‐leveling silicone sealer. (Photo F)  7. All sidewalk expansion material between back of curb and sidewalk need to be sealed with  self – leveling silicone sealer. (Photo G)  8. All expansion joints along the walls need to be sealed. (Photo H)  9. Complete installation of all Veneerstone. (Photo I)  10. The grading on the northeast side of the channel (along the aerial SS crossing) needs to be  completed and graded per plans.  Reference plan sheets 26 and 27 for channel grading.  (Photo J)  11. Grate Inlet located in front of the property at 196 Freeport Pkwy needs to be adjusted to  grade. (Photo K)  12. The fire lane needs to be re‐striped along the ramps installed at the church driveway.    (Photo L)  13. Sprinkler irrigation trench needs to be filled in behind retaining wall F.  (Photo M & N)  14. Clean up debris in concrete wall behind retaining wall F.  (Photo O)  15. Repair steel straps on the aerial SS crossing.  (Photo P)  16. Electrical box to be adjusted to grade.  (Photo Q)  17. A guy wire for a power pole near station 11+50 may need to be moved to avoid conflict with  pedestrian traffic.  (Photo R)  18. Sprinkler head near station 34+00 needs to be repaired. (Photo S)  19. Cracks in the bridge railing need to be reamed/routed out, cleaned, re‐grouted, and re‐ painted.  (Photo T & U)  NOTE: ONCE THIS CIVIL PUNCHLIST IS COMPLETE, CONTRACTOR SHALL NOTIFY THE CITY OF COPPELL AND TEAGUE, NALL, & PERKINS FOR A REWALK OF THE PUNCHLIST ITEMS. P H O T O A PHOTO B PHOTO C P H O T O D P H O T O E PHOTO F PHOTO G P H O T O H P H O T O I P H O T O J P H O T O K PHOTO L P H O T O M P H O T O N PHOTO O PHOTO P PHOTO Q P H O T O R P H O T O S P H O T O T P H O T O U