Loading...
Fellowship-LR 990312CONCRETE COMPREoSIVE STRENGTH TES__ ENGINEERJlXG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904518 Report Date 03/12/1999 Client No.: 47677000 Project No.: 94991026 Client:' Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: 6 Sack w/air CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/09/1999 BATC~I Tn~E: N/A PLANT: N/A TIME SAMPLED: 4:30pm BY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny and light wind STRENGTa: 3600 psi @ 28 Days TEMPERATURE(F)- AIR 75 l~ CONCRETE: 75 V SLUMP: 4.0" Max TRUCK NO: 317 TlCr~T NO: 163690 AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: lnlets 30 & 32 ASTM C-172 ASTM C-39 SAMPLE LOCATION: #30 REPORT OF TESTS ACCUMULATIVE YARDS: N/A CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 2.00 02/16/1999 7 1 ! 4700 4060 I 2 2.00 03/09/1999 28 153510 5430 1 3 2.00 03/09/1999 28 145480 5140 Average 5290 1 4 2.00 04/06/1999 56 Batched by truck. Technician: Dean Martin Started: 2:30pm Finished: 6:00pm ~lZ,,,~, ~~~l~o Engin g, Inc Report Distribution: (1) lulian P. Barry General Contractors (1) Urban Architecture ( 1 ) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1