Loading...
Kimbel Vil-PT160318A copy of the approved permit must be on the job site at all times. CC: Applicant T H R c_1 r_ r. o r Page 1 of 4 Public Works COFPELL Permit File Rev. 0612012 Orig. to Project Mile � ' RIGHT -OF -WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer @coppelltx.gov (see button below) Date of Submittal: Applicant's Job # / Work Order # 080.51201 PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise /ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001 -944. Certificated Telecom Provider? Yes C No C ® Plans provided and approved (Erosion Control /Safety fences must be installed prior to beginning work) Project Name /Location or address KIMBEL ICOURT TOWNHOMES General Contractor E -mail address to return permit Contact # Representative: BRANDON BALL Franchise Telephone #: 972.360.4428 Company: E -mail address: BRANDON. BALL @ATMOSENERGY . COM (for contact if needed /if e-mail of approved permit Is desired /permit cannot be e- mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C Atmos Energy C Verizon C SBC/ AT &T C° Time Warner Cable C CoSery Electric /Gas C Other General Description of Work (in accordance with Ord. No. 2001 -944): PLEASE ATTACH PLAN OF PROPOSED WORK MAIN EXTENTION A CROSS KIMBEL KOURT AND ADD 9 SERVICE TO THE NEW TOWNHOMES Estimated Start Date APRIL 4, 2016 Estimated Completion Date* JUNE 8, 2 016 * Completion requires submittal of Completion Verification Notice (see page 4) ➢Was contact made with City and /or utility companies to locate existing utilities? if NO, Reason: (e Yes C' No ➢Is removal of existing streets, alleys, or sidewalks necessary? (e' Yes C No if YES, project must have City inspection prior to concrete replacement Rieht -of -Way Use Permit ADDlicatiou Paee 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may he required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972 - 462 -5155. ➢Any excavation requiring closing of a street /alley must be reported prior to closing to the following: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3512 Street Department @ 972 - 462 -5150 Engineering Department @ 972- 304 -3679 ➢Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE. Street closures are allowed from 9:00 a.m. until3:30 p.m. ONLY unless otherwise approved by City Engineer. ➢Attach Work Order (franchise only) and /or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972 - 462 -5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer @coppelitx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) BRANDON BALL 3/16/2016 Signature of Utility Company Representative Date Signature of Contractor Representative Date "CONTRACTOR WILL BE SELECTED ONCE THE PERMIT IS APPROVED BY THE CITY OF COPPELL. BEFORE STARTING CONSTRUCTION, THE CONTRACTOR WILL FINISH THE PERMIT APPLICATION AND SIGN FOR THE APPROVED PERMIT 17 M arEh- 20-16 Signature of City Representative Date Comments );,NOTE: Notify City inspector at 972 -3U4 -3679 priof, to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T H i • C I T Y O F COPPELL � � A UTILITY RELOCATION CHECKLIST FOR WORIC WITHIN CITY OF COPPELL RIGHTS -OF -WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: Page 3 of 4 1.A copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. S.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. 8.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and /or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gOV /utility- operations - division 972/ 462 -5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304 -3679 HOMEOWNER ASSOCIATIONS 972/ 304 -3678 (Planning Department) TIME WARNER CABLE 214/ 320 -5455 (Mike Rasmussen) AT &T LOCAL NETWORK 214/ 215 -3031 (Rich Millenman) COSERV Gas & Electric 940/ 321 -7800 x 7624 (Greg Ward) EXPLORER PIPELINE 918/ 493 -5100 (Patrick Nwakoby) ONCOR Electric Delivery 972/ 323 -8917 (Larry Redick) VERIZON COMMUNICATIONS 972/ 318 -5277 FEDERAL EMERGENCY MGMT. ADMIN. 940/ 898 -5138 TEXAS COMM. on ENVIRONMENTAL QUALITY 817/588 -5800 DENTON CO. LEVEE DISTRICT 214/ 352 -5118 (Richard Hightower) Atmos Energy 972/360 -4428 (Gary Dickinson) 1 800 DIG TESS for line locates (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16. "Clean -up" requires returning work area to pre- project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T H i C I T T - O r COPPELL UTILITY RELOCATION IN RIGHT -OF -WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4of4 Contact City of Coppell Public Works Division at 972- 462 -5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule vefification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Order # cif applicable) Sub - contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL 4-Inspected by of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow -up needed? (Yes C No Follow -up scheduled for •- Inspected by of Streets Maintenance Division on and found to be acceptable / not acceptable because Follow -up needed? C Yes C No Follow -up scheduled for A copy of this completed notice can be provided to the or e- mailed by using the button below: City of Coppell Engineering Dept. 2SS Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3S70 ress Submit by E -mail I Print Form 20' I HORIZ - 1 a f m o 10 m o <z 1 np, = 20 R. - INSTALL 2" POLY GAS MAIN TO SERVICE CONNECT TO EX SNETY m 9 NEW LOTS (SEE DEVELOPER PLANS CONNECT v - °°_ TO FOR SERVICE LOCATION DETAILS) Ex SDEw z APPROX. LOCATION OF Q EXIST GAS SERVICE. - cce+swTRUCT w x 8 57 a' caNETE sOEwux REMOVE AND REPLA CONNECT 10 EX S•DEWALX REMOTE PPROX REMOVE ANO REP44C_ Ex DRIVEWAY UP i0 PONT �` CONCTRETE L TE PA{!N�: \ 40 Cb EX OREVEWAY UP TO F"T G SDEWAIx N'ERScCi104 SiA 3 +00, I{00 Li 1 ~ C OF SIpEWALY. NTEHSECTION INSTALL a' CURBrLEI FL "416 ( �- -+ 'POLY su sry 70 ENO CONCFil2 PAM' EXSI%l 25 5+00 0 3 4+00 a { 3 S 2 +00 CROSSING CONFLICT: MAIN AIN A MIG MIIM X CL RENCE .�. ' REMOVE -'ROX 63 SALVAG fANC g�to — CONCRETE FLUME wNrAL STOPS °- FL- 445.75 —� -Cti. T EX,SnNG HEADWALL SHALL On Q COPP sTA 2+5488. 1125 RT S *A 5+00, 14 OU ai REVAN NTACT S1REEi5 DEPAR T WSTALL 4' SO SOMA INSTAt1. 10' NRB INLET Q FL "0.83 FL NA 07 Sc •x• STA 1+ i B T . O OF VAULT OF VAULT BEGN 7" CONCRETE PAVNO N 1D396960645 VAIEN EmSmG 26' 8 -8 PAVNG I O E 2441171 2380 EXISTING CROSSING: F EXISTING 16" WATER © TdY. I, cH1 APPROX. LOCATION OF EXISTING CROSSING: 0 9348 3143 �+ EXIST 2" POLY GAS MAIN. FL- 442.25 N 7os9s4e sus i '� _• EXISTING 30' WATER L E 2"1190.6805 447.19 - FL- 444.25 _�yr LOW POIN ELEV - 447.12 s -- - .. 1. —_ __ .__ __ _ __ —___. _. - -. __ � < 100.00' VC LOW PqN STA = 3+ +1.58 PN STA = 4+67.38 - - - — PIA ELEV = 447.81 _ ,� __._. <._ _ _ _ + v n i z K = 76.98 °n _ K ° 8�4'.�- _ _- - -- o -- -- n n -- APPROX. ELEVATION REQUIRED TO �� - w CLEAR THE EXISTING 6" WATERLINE. TOP OF am AND — > - -- 3 u' .+ -- I _ (GAS T.O.P. 443.00) - - -- U_ N —__- - _ -- _ W o ~ R _ + !7� � 01 M18 - ' cp ♦5'.i ~ S - m m O <� _ t ¢ 0) m Y C.DKKTE PA. —__ — O W -- - v __ - —. 448_ 446 F 1: � _ _ _ .sT " UT 'A-i'. 26 LF ___- E% __ -_. _ __ -_. Ex OROUO , R7(CXlYD yr1 Ex GROUND V GROUND AS - _ - -- «- __ ABfhRi - -_ __..- __ -R0►tT -._— _ - -_— 1 omoym X IMAM - -" — ° -s -- - -- -- — —. - -°P' q_ -- e• m w4rzwuNE_ — — I �— — �. - - -- - — 1 -- ` - - - - -- - -- — a --- _ -- - -- - - ._ YL APPROX LOLL TM _ _ N — — — — — _— F, I n138 POLP WARaM —14r ,•fl b,�. - - Yr APPROX LOCATON n 436 n < �PTEa TUY FLED cw — — 1 - _ 2400 _ S .D _ 495 GENERAL LEGEND -- I _ __ _4 _ 5+00 ,00 R.p.W /PROP6RIYtP2 --- - - - - -- TOTAL INSTALLATION RECORD DRAWING - ATMOS ENERGY CORPORATION ATE LP,f _ _ _ _ _ _ _ _ _ 250'- 2 "HDPE 17-.20' TNS RECD D URRAwNG REFLECTS. 70 TAE BEST PROJ MGR: BRANDON BALL WATER UAE HOR12 OF RFE DES GY ENGNEE.R'S .40MLfl>GE, sAN,rARY sEAER SERVaCELINES energy APPROXMATE LOCAUON CT mE CONSTRUCTFO TRITEX PM: MICHAEL WISNIEWSKI OK AU N�0AAr4 wDRX BASED ON INFONMATiON "OVOED BY OYEM4EAD EliC O _ PHONE: (972) 360.4428 m UA47ER(Y+DMAO ralDAU 9 SHORT THIS DRAWING HAS BEEN MODIFIED TO nR C TTLALTOR TMY DESCH LACNF,-R smA - w� 10 1g oPnc SHOW THE PROPOSED ATMOS ENERGY 1 -4' Nm BL MELD RL a+s1>LE FOR ANY ERRORS, PROJECT: KIMBEL KOURT r I.WDERdRGLYID ELL— VERT EMISSMI M ACNT�, S %4Q MAY BF Fro GAS IF GAS LINE IN AN EFFORT TO OBTAIN A - %CaFOVATLD : REIN AS A REwu. CONFIG #: 152894385 PROJECT #: 080.51201 PE r4aLCLw PRfL,K ° CITY PERMIT FOR CONSTRUCTION. MAPSCO # SHEET 1 Of 2 C EOfNiIA 6 SCALE: = 20• STREET PAVING IMPROVEMENTS PROECT _ - ,. L.ATNO MWRT RAi, up aLL GEMICIWF 44W YE �oWtp I,>. vON,T[N T M l C I T Y p ..- ;e- +.�� ""r. a w oA< m si aw. As .ws•m..s roc -Z:7;. n c.uT.am n�Ai ,XC p7-" aWS v, sssT v AmAi ,Nr wvarrun ru ,XC .wf.cT a as au EXTENDED 9DEWALK, MOOM DEBVEWAYS 70R SIDEWALK SWL 11/09 COPPELL DESICNEO: KRY PLAN AND PROFILE MA09 -01 X 7-+e ws1•.;,nl a 16 WJw. »e Lou+w ANI DEYAI,P a Ar. LR,K R1M1rs st r1 sN7i�''• ^O �0 m"°''c'°" CHANGE PN ELEV AT 2 +00 FROM 447.47 TO 447.77 SWL 7/09 DRAWN: SKL -1 Q w «� � „~ < �.R W XR" 1 6[DC „NM � � KIMBEL KOURT REPAVING y�T (•.=�PO1 miaf.m ,.R S"avca•rx,s E %TEND DRIVEN.' REPLACEMENT 10' SWL 7/09 DA 7E; ADD sECa+O TOM sWL 7/09 CITY OF COPPELL I NO.1 REVISION I BY I DATE P41H:•w. =.y-� DALLAS COUNTY, TEXAS 3 OE 4