Loading...
DCT Fellowship- LR160302 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 26 REPORT DATE: 03-02-16 REG PROJECT NO. 20922 TECHNICIAN: A. Chavez PAGE: 1 of 2 CONTRACTOR: FCL Builders Texas Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 1 D-698 Dark brown clay 22.1 98.9 2 D-698 Yellowish brown clayey sand 12.4 117.4 3 D-698 Reddish brown sandy clay w/trace gray clay 13.7 112.3 4 D-698 Yellowish brown sandy clay 16.6 109.7 5 D-698 Dark brown & reddish brown clay 17.4 106.3 6 D-698 Brown sandy clay w/trace gray & red clay 14.0 113.6 7 D-698 Dark brown clay (lime-treated) 20.0 100.8 8 D-698 Reddish brown sandy clay (lime-treated) 18.5 102.0 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 220 02-15-16 Plumbing: F.2/1.5 1.0 108.4 16.5 3 96.5 221 Plumbing: F.2/1.5 0.0 97.6 22.0 7 96.8 222 02-16-16 Sanitary Line 2: STA 0+20 4.0 105.1 13.9 5 98.9() 223 Sanitary Line 2: STA 16+25 2.0 106.0 13.8 5 99.7() 224 Sanitary Line 2: STA 18+00 2.0 102.6 17.2 5 96.5() 225 Sanitary Line 3: STA 0+25 1.0 107.1 16.2 5 100.7() 226 Plumbing: A.8/1.1 0.5 107.3 18.6 4 97.8 227 Plumbing: B.3/1.7 0.5 112.2 13.6 2 95.6 228 Plumbing: H.7/1.7 1.0 105.3 18.2 4 96.0 229 Plumbing: H.7/1.6 0.0 110.3 20.0 6 97.1 Comments: Where tested, materials were in compliance with project specifications, unless noted otherwise. () Indicates failing test, not retested as of this report. REPORT NO. 26 REPORT DATE: 03-02-16 REG PROJECT NO. 20922 PAGE: 2 of 2 E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/jm