Loading...
Fellowship-LR 990219CONCRETE COMPRI,SSIVE STRENGTH TES ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904663 Report Date 02/19/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/10/1999 BATCH TIME: N/A PLANT: N/A TIME SAMPLED: 6:23pm BY: Dean Martin SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy and windy STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F)- AIR 75 F CONCRETE: 75 F SLUMP: 5" Max TRUCK NO: 461 TICKET NO: 164005 AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Inlet #33 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: N/A CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 1.75 02/17/1999 7 110780 3920 1 2 1.75 03/10/1999 28 1 3 1.75 03/10/1999 28 I 4 1.75 04/07/1999 56 Concrete batched and mixed by concrete truck. Scheduled for 3:00pm concrete arrived at 6:00 pm. Technician: Dean Martin Started: 2:30pm Finished: 7:30pm I'"BC ~n Report Distribution: ~ Co (I) Julian P. Barry General Contractors (1) Urban Architecture Eugefl~qarbour ( I ) City of Grapevine Vice President ( 1 ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1