Loading...
Fellowship-LR 990413 (5) CONCRETE COMPRL ,SIVE STRENGTH TES l' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904663 Report Date 04/13/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/10/1999 CATCH TIME: N/A PLANT: N/A TIME SAMPLED: 6:23pm aY: Dean Martin SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and windy STRENGTm 3600 psi @ 28 Days TEMPERATURE (F)- AIR 75 F CONCRETE: 75 F SLtrMP: 5" Max TRUCK NO: 461 TICKET NO: 164005 aiR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Inlet #33 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: N/A CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 1.75 02/17/1999 7 110780 3920 1 2 1.75 03/10/1999 28 172930 6120 1 3 1.75 03/10/1999 28 178940 6330 Average 6230 I 4 1.75 04/07/1999 56 192440 6810 Concrete batched and mixed by concrete truck. Scheduled for 3:00pm concrete arrived at 6:00 pm. Dean Martin Started: 2:30pm Finished: 7:30pm I'"gC Technician: Report Distribution: ~nc. (1) Julian P. Barry General Contractors (1) Urban Architecture Eugene Harbour (I) City of Grapevine Vice President (I) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OITM Page 1 of 1