Fellowship-LR 990413 (5) CONCRETE COMPRL ,SIVE STRENGTH TES l'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 02/10/1999 Report No.: 9904663 Report Date
04/13/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: N/A
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/10/1999 CATCH TIME: N/A
PLANT: N/A TIME SAMPLED: 6:23pm aY: Dean Martin
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy and windy
STRENGTm 3600 psi @ 28 Days TEMPERATURE (F)- AIR 75 F CONCRETE: 75 F
SLtrMP: 5" Max TRUCK NO: 461 TICKET NO: 164005
aiR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Inlet #33
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: N/A
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 1.75 02/17/1999 7 110780 3920
1 2 1.75 03/10/1999 28 172930 6120
1 3 1.75 03/10/1999 28 178940 6330
Average 6230
I 4 1.75 04/07/1999 56 192440 6810
Concrete batched and mixed by concrete truck. Scheduled for 3:00pm concrete
arrived at 6:00 pm.
Dean Martin Started: 2:30pm Finished: 7:30pm I'"gC
Technician:
Report Distribution: ~nc.
(1) Julian P. Barry General Contractors
(1) Urban Architecture Eugene Harbour
(I) City of Grapevine Vice President
(I) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OITM Page 1 of 1