Fellowship-LR 990216CONCRETE COMPRI"' SIVE STRENGTH TEL_
ENG--, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 02/08/1999 Report No.: 9904415 Report Date
02/16/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: 4
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/08/1999 BATCHTIME: 3:20pm
PLANT: Batch Truck TIME SAMPLED: 3:30pm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Cloudy
STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F)-AIR 68 F CONCRETE: 72 V
SLUMP: 5.0" Max TRUCK NO: 362 TICKET NO: 163778
AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Inlet #34
ASTM C-172
ASTM C-39
SAMPLE LOCATION: First lift of north side
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.00 02/15/1999 7 103330 3650
1 2 4.00 03/08/1999 28
1 3 4.00 03/08/1999 28
I 4 4.00 04/05/1999 56
Sampled from truck.
Technician: Greg Dimock Started: 3:00pm Finished: 5:00pm I'"I~ En .m~mp~c'
Report Distribution:
(1) Julian P. Barry General Contractors
(1) Urban Architecture Eugene Harbour
(I) City of Grapevine Vice President
( I ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1