Fellowship-LR 990406CONCRETE COMPRE_ $IVE STRENGTH TES
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 02/08/1999 Report No.: 9904415 Report Date
04/06/1999
Client No.: 47677000 Project No.: 94991026
Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas
Attn: Harold Luedke Phase III - Expansion
6616 Forest Park Road
Dallas TX 75235 Coppeli, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Julian P. Barry CONCRETE CLASS: 4
CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/08/1999 BATCIt TIME: 3:20pm
PLANT: Batch Truck TIME SAMPLED: 3:30pm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy
STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: 72 F
SLUMP: 5.0" Max TRUCKNO: 362 TICKETNO: 163778
AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Inlet #34
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: First lift of north side
REPORT OF TESTS ACCUMULATIVE YARDS: 8
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 4.00 02/15/1999 7 103330 3650
I 2 4.00 03/08/1999 28 150080 5310
I 3 4.00 03/08/1999 28 148730 5260
Average 5290
1 4 4.00 04/05/1999 56 158470 5600
Sampled from truck.
Technician: Greg Dimock Started: 3:00pm Finished: 5:00pm ~ EnRac.
Report Distribution:
(1) Julian P. Barry General Contractors ,/'/
(I) Urban Architecture Eugene Harbour
(1) City of Grapevine Vice President
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.