Loading...
Fellowship-LR 990406CONCRETE COMPRE_ $IVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/08/1999 Report No.: 9904415 Report Date 04/06/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Julian P. Barry CONCRETE CLASS: 4 CONCRETE SUPPLIER: Custom Crete PLACEMENT DATE: 02/08/1999 BATCIt TIME: 3:20pm PLANT: Batch Truck TIME SAMPLED: 3:30pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F)- AIR 68 F CONCRETE: 72 F SLUMP: 5.0" Max TRUCKNO: 362 TICKETNO: 163778 AIR: 4-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Inlet #34 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: First lift of north side REPORT OF TESTS ACCUMULATIVE YARDS: 8 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 4.00 02/15/1999 7 103330 3650 I 2 4.00 03/08/1999 28 150080 5310 I 3 4.00 03/08/1999 28 148730 5260 Average 5290 1 4 4.00 04/05/1999 56 158470 5600 Sampled from truck. Technician: Greg Dimock Started: 3:00pm Finished: 5:00pm ~ EnRac. Report Distribution: (1) Julian P. Barry General Contractors ,/'/ (I) Urban Architecture Eugene Harbour (1) City of Grapevine Vice President (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1