Loading...
ST0301C- LR160311• GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 66 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at E. Side MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 MACHIH Time Sample Batched: 8:39 AM Cement: 6 Sack Time Sampled: 9:45 AM Remarks Sample Location: E. Bound, 75' W. of Hearthstone Fly Ash: 3/8/16 Ln. Coarse Aggregate: Truck / Ticket No: */4187 Intermediate Aggregate: Temperature: 3/12/16 Ambient Range: 66 of Fine Aggregate: Concrete Range: 68 F Admixtures: Slump Range (inches): 2.25 l Weather Conditions: Clear 28 Time Started: 8:00 AM 2 Time Completed: 4:45 PM Added Water: 0 Gal Sample Air Content (%}: 3.6 Total Cubic Yards Placed: 32.0 Test Methods Utilized Require Strength(Lbs./ s .in.: 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 299 3 3/8/16 122,000 4,320 BCR 300 7 3/12/16 BCR 301 2.25 28 4/2/16 BCR 302 28 4/2/16 BCR 303 H I H Test Methods Utilized Fracture Regular Cylinders Made By: HP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Truck number is not available cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell a,coppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(i7coppelltx.aov Mr. George Marshall - City of Coppell via Email: gmarshall ,coppelltx.aov Mr. Robert Caudill - Tiseo Paving via Email: rcaudil4'&tiseopaving.com GEE F-3212 31 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. INICAL ENGINEERING IVIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 9 Fax (214) 352-6972 Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 67 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at E. Side MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 MACH\H Time Sample Batched: 10:17 AM Cement: 6 Sack Time Sampled: 11:25 AM Fly Ash: Sample Location: E. Bound of Bethel Rd., 200'-225' 3 3/8/16 W. of Hearthstone Ln. Coarse Aggregate: Truck / Ticket No: */4198 Intermediate Aggregate: Temperature.: 3/12/16 Fine Aggregate: Ambient Range: 72 OF Admixtures: Concrete Range: 77 OF 4/2/16 Slump Range (inches): 2.5 Weather Conditions: Clear 2 Time Started: 8:00 AM Added Water: 0 Gal Time Completed: 4:45 PM Sample Air Content 3.3 Total Cubic Yards Placed: 120.0 Test Methods Utilized Reouired Strenpth (Lbs./qo.in_)- 4.000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 304 3 3/8/16 113,640 4,020 BCR 305 7 3/12/16 BCR 306 2.5 28 4/2/16 BCR 307 28 4/2/16 BCR 308 H H Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: HP Remarks and/or Distribution: * Truck number is not available cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,coppelltx.Roy Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coi)velltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(0),copveIltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a-),tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 68 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at W. Side MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: ' 2596 MACH\H Time Sample Batched: Cement: 6 Sack Time Sampled: Total Load (Lbs.) Sample Location: Fly Ash: BCR 309 Coarse Aggregate: Truck / Ticket No: Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: BCR 310 Concrete Range: Admixtures: Slump Range (inches): I Weather Conditions: 2 Time Started: 3.0 Time Completed: Added Water: 0 Gal Sample Air Content (1/o): Total Cubic Yards Placed: BCR 312 Re uired Strength (Lbs./sq.in.): 12:30 PM 1:40 PM E. Bound of Bethel Rd., 170'E. of S. Coppell Rd. */4213 79 OF 86 OF 3.0 Clear 8:00 AM 4:45 PM 3.5 240.0 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 309 3 3/8/16 78,540** 2,780 BCR 310 7 3/12/16 BCR 311 3.0 28 4/2/16 BCR 312 28 4/2/16 BCR 313 H H Test Methods Utilized Fracture Regular Cylinders Made By: HP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Truck number is not available ** Marked test result did not meet the project specifications cc: Mr. Rick Odell - City of Coppell via E-mail: Rodellacoppellm.yov Mr. Michelle Matunas - City of Coppell via Email: minatunas0dconvellmizov Mr. George Marshall - City of Coppell via Email: Marshall(ibcoRpellix.agy Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@,tiseopaviniz.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 9 GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants,. Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 UIFlI I 1,11 11 11 11rffff-"k iil ''is 1 Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"xI2" Cylinders Client: City of'Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 69 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: E. Bound, Bethel Rd. Paviniz, E. of S. Coppell Rd. MATERIALS Source SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 MACH\H Time Sample Batched: 2:10 PM Cement: 6 Sack Time Sampled: 3:10 PM Fly Ash: Sample Location: E. Bound of Bethel Rd., 80' E. of 3 3/8/16 S. Coppell Rd. Coarse Aggregate: Truck / Ticket No: */4223 Intermediate Aggregate: Temperature: 3/12/16 Fine Aggregate: Ambient Range: 80 OF BCR 316 Concrete Range: 87 OF Admixtures: Slump Range (inches): 5.5 1 Weather Conditions: Clear 2 Time Started: 8:00 AM Time Completed: 4:45 PM Added Water: 0 Gal Sample Air Content (%): 3.4 Total Cubic Yards Placed: 320.0 Test Methods Utilized Rproi;rPri Rtri-noth (I he Icn in 1- 11 AAA Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 314 3 3/8/16 80,440** 2,850 BCR 315 7 3/12/16 BCR 316 5.5 28 4/2/16 BCR 317 28 4/2/16 BCR 318 H H Test Methods Utilized Fracture Regular Cylinders Made By: HP I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Truck number is not available ** Marked test result did not meet the project specifications cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@copt)elltx.gov Mr. Michelle Matunas - City of Coppell via Email: mrnatunas(&,coppelItx,gov Mr, George Marshall - City of Coppell via Email: gmarshall@coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tise2paving.com Inc. Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING E * ENVIRONMENTAL CONSULTING GEE Consultants, 'n/'c. E I* CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive « Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 L will 11 ,• I,, I I to • Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"x12" Cylinders Client: City Of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 70 Contractor: Tiseo Paving Project No,: 215-140 Concrete Supplier and Plant: Tisec, Paving Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at E. Side MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Date Tested Mix Number: 2596 MACH\H Time Sample Batched: 8:39 AM Cement: 6 Sack Time Sampled: 9:45 AM Fly Ash: Sample Location: E. Bound, 75' W. of Hearthstone Coarse Aggregate: 3/11/16 Truck / Ticket No: Ln. */4187 Intermediate Aggregate: BCR 301 Temperature: 28 Fine Aggregate: Ambient Range: 66 OF Admixtures: Concrete Range: 68 OF Slump Range (inches): 2.25 H Weather Conditions: Clear 2 Time Started: 8:00 AM Added Water: 1) Gal Time Completed: 4:45 PM Sample Air Content (%): 3.6 Total Cubic Yards Placed: 32.0 D --,--A Q+ ---I, i'l t- I— A AAA Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 299 3 3/8/16 122,000 4,320 BCR 300 6 3/11/16 132,780 4,700 BCR 301 2.25 28 4/2/16 BCR 302 28 4/2/16 BCR 303 H H Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: HP Remarks and/or Distribution: * Truck number is not available cc: Mr. Rick Odell - City of Coppell via E-mail: Roden ,coppelltx.aov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(-a),covMlftx.gov Mr. George Marshall - City of Coppell via Email: AmarshalIgcovpelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantifies of apparently identical or similar products. INICAL ENGINEERING VIRONMENTAL CONSULTING 9 CONSTRUCTION MATERIALS TESTING C�3 10046 Monroe Drive • Dallas, Texas 75229 • REPORT OF CONCRETE MIX OBSERVATION Consultants, Inc. .14) 352-5433 9 Fax (214) 352-6972 Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6NI2' Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 71 Contractor, Tiseo Paving 4,020 Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving 6 3/11/16 Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at E. Side MATERIALS Source / SSD Batch Wts. Description (Lbs/CuYd) OBSERVATION DATA Mix Number: 2596 MACH\H Time Sample Batched: 10:17 AM Cement: 6 Sack Time Sampled: 11:25 AM Fly Ash: BCR 308 Sample Location: E. Bound of Bethel Rd., 200'-225' Coarse Aggregate: Truck / Ticket No: W. of Hearthstone Ln. */4198 Intermediate Aggregate: Fracture Regular Temperature: ASTM C-31, C-39, C-143 Fine Aggregate: Cylinders Made By: HP Ambient Range: 72 OF Admixtures: Concrete Range: 77 OF Slump Range (inches): 2.5 Weather Conditions: Clear 2 Time Started: 8:00 AM Added Water: 1) Gat Time Completed: 4:45 PM Sample Air Content 3.3 Total Cubic Yards Placed: 120.0 Rpn";Pd Qf­-..fh It 1— /on in I. A AAA Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 304 3 3/8/16 113,640 4,020 BCR 305 6 3/11/16 115,260 4,080 BCR 306 2.5 28 4/2/16 BCR 307 28 4/2/16 BCR 308 H H Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: HP Remarks and/or Distribution: * Truck number is not available cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasAcoppelftx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(i4corlvelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: reaudillAtisectnaving.com GEE Consultants, Inc. TBPE Firm: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING G • ENVIRONMENTAL CONSULTING GEE C011sult ms, Inc. E • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-3433 •Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION I Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 72 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: E. Bound, Bethel Rd. Paving, W. of Hearthstone Ln. and Bethel Rd. Intersection at W. Side MATERIALS Source SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 MACH\H Time Sample i3atched: 12:30 PM Cement: 6 Sack Time Samplet� 1:40 PM Fly Ash: Sample Loca o n: E. Bound of Bethel Rd., 170'E. of 3 3/8/16 S. Coppell Rd. Coarse Aggregate:Tru / Ti' ck kc No. */4213 Intermediate Aggregate: Temperature. 3/11/16 Fine Aggregate: Ambient Range: 79 OF BCR 311 C' nerete Range: 86 OF Admixtures: Slump Range �inches): 3.0 Weather Conditions: Clear 2 Time Started: S 8:00 AM Time C 0 1 ed: e 'd- 4:45 PM Added Water: 0 Gal ;p Sample Air C (0/o): 3.5 Total Cubicards Placed: 240.0 Test Methods Utilized Required StreP_th (Lbs./so.in.): 4.000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength i(Lbs./Sq.1n.) Remarks BCR 309 3 3/8/16 78,540** 2,780 BCR 310 6 3/11/16 98,540** 3,490 BCR 311 3.0 28 4/2/16 BCR 312 28 4/2/16 BCR 313 H H Test Methods Utilized Fracture Regular Cyinders Made By: HP i ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Truck number is not available ** Marked test result did not meet the project cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a),coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas&co2J2elltx.J12v Mr. George Marshall - City of Coppell via Email: gmarshallAcovalltx.gov Mr. Robert Caudill - Tiseo Paving via Email: reaudill(@tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviev All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced i our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not ne, 1, F 1 4 1 . I I the full approval of GEE Consultants, Inc, The use of our name must receive V indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING FG_ Measured Slump (in.) Age (Days) E • ENVIRONMENTAL CONSULTING GE Consultants, Inc. E o CONSTRUCTION MATERIALS TESTING BCR 314 10046 Monroe Drive « Dallas, Texas 75229 • 11 14) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION BCR 315 Report Date: March 11, 2016 Date Concrete Placed: March 5, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road 28 Concrete Report No.: 73 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving 4/2/16 Location of Placement: E. Bound Bethel Rd. Paving, E. of S. Coppell Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (LbsfCuYd) Fracture Regular Cy inders Made By: HP Mix Number: .2596 MACMH Time SampleBatched: 2:10 PM Cement: 6 Sack Time Sample : 3:10 PM Sample Locati n: E. Bound of Bethel Rd., 80'E. of Fly Ash: S. Coppell Rd. Coarse Aggregate: Truck / Ticket No: */4223 Intermediate Aggregate: Temperature:! Fine Aggregate: A bient Range: 80 OF C ncrete Range: 87 OF Admixtures: Slump Range inches): 5.5 f Weather Cond tions: Clear 2 Time Started: 8:00 AM Time Complet d: 4:45 PM Added Water: 0 Gal Sample Air t ntent on 3.4 Total Cubic rds Placed: 320.0 Required Stye eth (Lbs./so.in.): 4.000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Con pressive Strength (Lbs./Sq.1n.) Remarks BCR 314 3 3/8/16 80,440** 2,850 ** BCR 315 6 3/11/16 94,080** 3,330 ** BCR 316 5.5 28 4/2/16 BCR 317 28 4/2/16 BCR 318 H H Test Methods Utilized Fracture Regular Cy inders Made By: HP ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: * Truck number is not available ** Marked test result did not meet the project cc: Mr. Rick Odell - City of Coppell via E-mail: RodellAcoppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.gov Mr. George Marshall - City of Coppell via Email: g_marshall&n,coppelltx.s;ov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill&u iseopaving.com TBPE Firm: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced w thout the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not nec ssarily indicative of the quantities of apparently identical or similar products.