ST0301C- LR160323G1 * GEOTECHNICAL ENGINEERING
E I* ENVIRONMENTAL CONSULTING
CONSTRUCTION MATERIALS TESTW5
G t, t- ts, Inc
EE 'onsuftan "t
10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 •Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: March 23, 2016
Client: City of Coppell
Project Bethel and Coppell Rd,
Identification Reinforcing Steel Observation
Test Date: March 18, 2016
General Report No.: 42
Project No.: 215-0140
Method of Test Visual Observation
Page I of I
6�
On March 18'. 2016 reinforcing steel was observed at the following locations:
1) Paving at Bethel Rd,, 40'S. from Cross Section of Bethel Rd. and Hearthstone Ln., 15'E, from Building 413
There were no discrepancies.
Technician: YS
cc: Mr. Rick Odell -City of Coppell via E-mail: godell0a co22elitx.1.0—v
---
Mr. Michelle Matuna:s - City of Coppell via Email: mrnatunas0�covpelltx- off
Mr. George Marshall - City of Coppell via Email: gmarsh tl!g_co
2pelltx,gov_
Mr. Robert Caudill - Tiseo Paving via Email: reaudill 'tPjjseopaving.com
GEE Consultants, Inc. TBPE Firm: F-3212
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.
GEOTECHNICAL ENGINEERING
E I* ENVIRONMENTAL CONSULTING
A # CONSTRUCTION MATERIALS TESTING
GEE Consultan"t, Inc,
C5f
10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax {2141352-6=372
REINFORCING STEEL PLACEMENT
Report Date: March 23, 2016
Client: City of Coppell
Project Bethel and Coppell Rd.
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: March 21, 2016
General Report No.: 43
Project No.: 215-0140
Page I of I
MW
On March 21, 2016 reinforcing steel was observed at the following locations:
1) Driveway at Bethel Rd., 30' South from Building 417 and 80'E. from Intersection of Bethel Rd. and S. Coppell Rd.
There were no discrepancies.
CC: Mr. Rick Odell - City or Coppell via E-mail: Rodell2coppelltx.gov
Mr, Michelle Matunas - City of Coppell via Email: mmatunasLacopVelItx.gov
Mr. George Marshall - City of Coppell via Email: gmarshallgcoppelitx.gov
Mr. Robert Caudill - Tiseo Paving via Email: rcaudillra,,fiseopLying.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ofapparently
identical or similar products,