Loading...
PA1501B- LR160331 WRIGHT CONSTRUCTION unmy 6 Env ronmental Sery ces,Inc. UTILITY&ENVIRONMENTAL SERVICES 1965 CALIFORNIA CROSSING 70.3 DALLAS,TX.75220 Tel:972-556-2913,Fax:972-556-1614 PROJ INFO PROJ NAME: PROJECT NUM: RESPONSIBLE: DATE: ANDREW BROWN COMMUNITY PAR WRIGHT 03/31/2016 CLIENT WRIGHT CONSTRUCTION RESPONSIBLE: LALO DEPARTMENT: FOREMAN PO BOX: STREET: CITY, ST ZIP: TELEPHONE: FAX: MOBILE: E-MAIL: PROJ MGR CITY OF COPPELL RESPONSIBLE: MARCUS DEPARTMENT: INSPECTOR PO BOX: STREET: CITY, ST ZIP: COPPELL,TEXAS TELEPHONE: FAX: MOBILE: E-MAIL: CONTRACTOR UTILITY & ENVIRONMENTAL SERVICES RESPONSIBLE: TONY CHAVEZ DEPARTMENT: TECHNICIAN PO BOX: STREET: 1965 CALIFORNIA CROSSING CITY, ST ZIP: DALLAS,TX.75220 ( TELEPHONE: 972-556-2913 FAX: 972-556-1614 MOBILE: 214-828-7597 E-MAIL: .11111+ WRIGHT CONSTRUCTION %utility s Enviror m nIar services.Ina UTILITY&ENVIRONMENTAL SERVICES 1965 CALIFORNIA CROSSING �r� ,:... ;.,:�,, ...M."., asm.T,....Af DALLAS,TX.75220 Tel:972-556-2913,Fax:972-556-1614 INSPECTION REPORT CDATE: WORK#: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 03/31/2016 sunny,dry TONY CHAVEZ 1 PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: Yes 0 STREET: LINE E MAP#1: MH: 0+00 CITY: COPPELL,TX MAP#2: MH: 5+90 LOCALE: TAPE#: DVD#1 TVD LGTH: 590.51 ft INSPECT REASON: new inspection PIPE SIZE: PVC 8"0.50% SECTION TYPE: SANITARY SEWER MATERIAL: JT LGTH: LINING: AREA: RSRVD: REMARK: 1:1325 POSITION OBSERVATION MPEG PH • 0+00 6.01 inspection begins at downstream manhole 0+00 C 5+90 590.51 inspection ends at upstream manhole 5+90 WRIGHT CONSTRUCTION util ty&Environmental Services.Inc. UTILITY&ENVIRONMENTAL SERVICES 1965 CALIFORNIA CROSSING „,.a ,1, ...« os,„..a: DALLAS,TX.75220 Tel:972-556-2913.Fax:972-556-1614 INSPECTION REPORT ink DATE: WORK#: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 03/31/2016 sunny,dry TONY CHAVEZ 2 PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: Yes 0 STREET: LINED MAP#1: MH: 0+76 CITY: COPPELL,TX MAP#2: MH: 5+28 LOCALE: TAPE#: DVD#1 TVD LGTH: 453.27 ft INSPECT REASON: new inspection PIPE SIZE: PVC 8"1.28% SECTION TYPE: SANITARY SEWER MATERIAL: JT LGTH: LINING: AREA: RSRVD: REMARK: 1:1025 POSITION OBSERVATION MPEG PH 0+76 6.01 inspection begins at downstream manhole 0+76 453.27 inspection ends at upstream manhole 5+28 WRIGHT CONSTRUCTION utilityE Environmental Services.Inc. UTILITY Et ENVIRONMENTAL SERVICES ` ` "' 1965 CALIFORNIA CROSSING v.„ C : C'E, DALLAS,TX75220 Tel:972-556-2913,Fax:972-556-1614 INSPECTION REPORT DATE: WORK It: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 03/31/2016 sunny,dry TONY CHAVEZ 3 PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: Yes 0 STREET: LINED MAP#1: MH: 0+76 CITY: COPPELL,TX MAP#2: MH: 0+00 LOCALE: TAPE#: DVD#1 TVD LGTH: 75.41 ft INSPECT REASON: new inspection PIPE SIZE: PVC 8"2.52% SECTION TYPE: SANITARY SEWER MATERIAL: JT LGTH: LINING: AREA: RSRVD: REMARK: 1:175 POSITION OBSERVATION MPEG PH 0+76 ' 6.01 inspection begins at upstream manhole 0+76 Cil‘ 0+00 75.41 inspection ends at downstream manhole 0+00 Utility & Environmental Services, Inc Low Pressure Air Test for Gravity Sanitary Sewer Test Procedure: Each section of sewer shall be tested between successive manholes. Air shall be introduced into the pipeline until a 4.0 Psi gauge pressure has been reached. At that time, the flow of air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 Psi gauge for at least two (2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pressure in the pipe shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 Psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine the time lapse required for the air pressure to drop to 2.5 Psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 Psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Pipe Size Psi L.F. Tested Time Passed? Passed? E 5+90 0+00 8 4 590 8:52 Yes Yes D 0+76 5+28 8 4 453 8:52 Yes Yes D 0+76 0+00 8 4 75 7:33 Yes Yes Owner: Wright Construction Date: 3/31/16 Project: Andrew Brown Community Park - West Job #: Location: Tested by: Tony Chavez of Utility & Environmental Services, Inc. Inspector: Marcus Marion City of: Coppell Utility & Environmental Services, Inc. I 1965 California Crossing P.O. Box 542015 Dallas, Tx 75220 Dallas, Tx 75354 Office (972) 556-2913 Fax (972) 556-1614 MANHOLE VACUUM TEST REPORT TEST PROCEDURE Plug all manhole entrances and exits other than the manhole top access using suitably sized pneumatic or mechanical pipeline plugs. Install the vacuum tester head assembly at the top access of manhole. Attach vacuum pump to test head and start pump. Open inlet/outlet ball valve and evacuate the manhole to 10"Hg. (approximately negative 5 Psig, 0.3 bar) Close vacuum inlet/outlet ball valve and monitor vacuum for specified test period. Manhole # HG. PSIG. Time Passed Failed 5+90 10 2:00 min Yes 5+28 10 2:00 min Yes 0+76 10 2:00 min Yes OWNER: Wright Construction DATE: 3/31/2016 PROJECT: Andrew Brown Community Park - West TESTED BY: Tony Chavez OF U.E.S. INC. INSPECTOR: Marcus Marion CITY OF: Coppell C