Loading...
Fellowship-LR 990208 (3)IN-PLACE DENSITY""'ESTING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/28/1999 Report No.: 9903410 Report Date 02/08/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Attn: Harold Luedke 6616 Forest Park Road Phase III - Expansion Dallas TX 75235 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Tan & brown clay w/gravel 18.5 109.0 -2/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Storm Sewer, Line A 1 1st lift, Station 0+75 1 19.3 104.8 96 2 1st lift, Station 2+50 1 17.5 109.0 100 Test results on this report meet project specification. Technician: Roy Montgomery ~ E~ng, Inc. Report Distribution: ( I ) Julian P, Barry General Contractors (I) Urban Architecture Paul D. Smith, P.E. { I ) City of Grapewne Senior Project Engineer ( I ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SS Page 1 of 1