Coppell Ind 2- LR151015 Utility & Environmental Services, Inc.
J Inspectioli ' '( actor (Y anirig encl1 ‘Safetv
41/4d. P.O. Box 542015 1965 California Crossing Dallas, Texas 75354
972-556-2913 Fax 972-556-1614
Project Name: TRADEPOINT BUSINESS PARK - ULINE
EXPANSION
Date: 10/15/2015 9:51:00 AM Asset ID: LINE A
Location: 809 W. BETHEL RD Upstream MH Number: 12+87 (MH
Length Surveyed: 425 Downstream MH Number: 8+71 (MH
Run Number: 1 Direction Of Survey: Downstream
Pipe Size: 8" Pipe Material: Polyvinyl Chloride
' ID Number: 12+87 (MH
(6.0) SI - Start Inspection
(425.0) El - End Inspection
Total Distance: 425 0 ID Number: 8+71 (MH
Created with the 'rte. report generator Back
Q
.rrr■IM
Utility & Environmental Services, Inc.
TV. Inspection ' '("actor Cteaning lienc r Safety
P.O. Box 542015 1965 California Crossing Dallas, Texas 75354
972-556-2913 Fax 97 2-5 56-1614
Project
TRADEPOINT
Project Name BUSINESS PARK- Location 809 W. BETHEL RD
ULINE EXPANSION
Date 10/15/2015 09:51 Direction Of Survey Downstream
City COPPELL ,TEXAS PO Number
Run Number 1 Purpose Pre-Acceptance
Operator Name HURTADO Completed Yes
Comments
Pipe
Asset ID LINE A Pipe Size 8"
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 425 Year Laid
Year Renewed Sewer Use Sanitary
Manhole
Upstream MH Number 12+87 (MH Upstream MH Depth
UpstreamMH Location Upstream MH Notes
Downstream MH 8+71 (MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow NONE Signs Of Surcharge No
Other
Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19
MAVERICK
Contractor Name CONSTRUCTION Weather Dry
VCR Start Index VCR End Index
Created with the r report generator Back I
•
ZoiUtility & Environmental Services, Inc.
1:'( ". Inspectziin965'i)iictor (Yearling 'r encfl Safety
P.O. Box 542015 1California Crossing Dallas, Texas 75354
972-556-2913 Fax 972-556-1614
Project Name: TRADEPOINT BUSINESS PARK - ULINE
EXPANSION
Date: 10/15/2015 10:43:00 AM Asset ID: LINE A
Location: 809 W. BETHEL RD Upstream MH Number: 8+71 (MH
Length Surveyed: 172.2 Downstream MH Number: 7+02 (MH
Run Number: 2 Direction Of Survey: Downstream
Pipe Size: 8" Pipe Material: Polyvinyl Chloride
0 ID Number: 8+71 (MH
(6.0) SI - Start Inspection
(172.2) El - End Inspection
Total Distance: 172.2 ;•. ID Number: 7+02 (MH
Created with they. report generator Back
rINO ,rrrr�.
Utility & Environmental Services, Inc.
r. ,( ). Inspection Vactor Cleaning errc/ Safety
• Z P.Q. Box 542015 1965 California Crossing Dallas, Texas 75354
972-556-2913 Fax 972-556-1614
Project
TRADEPOINT
Project Name BUSINESS PARK- Location 809 W. BETHEL RD
ULINE EXPANSION
Date 10/15/2015 10:43 Direction Of Survey Downstream
City COPPELL ,TEXAS PO Number
Run Number 2 Purpose Pre-Acceptance
Operator Name HURTADO Completed Yes
Comments
Pipe
Asset ID LINE A Pipe Size 8"
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 172.2 Year Laid
Year Renewed Sewer Use Sanitary
Manhole
•Upstream MH Number 8+71 (MH Upstream MH Depth
UpstreamMH Location Upstream MH Notes
Downstream MH 7+02 (MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow NONE Signs Of Surcharge No
Other
Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19
Contractor Name MAVERICK Weather Dry
CONSTRUCTION
VCR Start Index VCR End Index
Created with the �'' report generator Back 1
4
44Utility & Environmental Services, Inc.
.1-. ( . Inspection " '( ' 7ctorCfealliiig1"'1?cl7 Safay
P.O. Box 542015 1965 California Crossing Dallas, Texas 75354
912-556-2913 Fax 972-556-1614
Project Name: TRADEPOINT BUSINESS PARK - ULINE
EXPANSION
Date: 10/15/2015 11:21:00 AM Asset ID: LINE A
Location: 809 W. BETHEL RD Upstream MH Number: 7+02 (MH
Length Surveyed: 381.6 Downstream MH Number: 3+26 (MH
Run Number: 3 Direction Of Survey: Downstream
Pipe Size: 8" Pipe Material: Polyvinyl Chloride
r �
' ' ID Number: 7+02 (MH
(381.6) El - End Inspection
I Total Distance: 381.6 0 ID Number: 3+26 (MH
Created with the 47w report generator Back
yam. _ �d■s, �r �r■iF �rrrrr�
Utility & Environmental Services, Inc.
1:.(). inspection `factor (Ii'aning Trencfi Safety
P.O. Box 542015 1965 California Crossing Dallas, Texas 75354
972-556-2913 Fax 972-556-1614
Project
TRADEPOINT
Project Name BUSINESS PARK- Location 809 W. BETHEL RD
ULINE EXPANSION
Date 10/15/2015 11:21 Direction Of Survey Downstream
City COPPELL ,TEXAS PO Number
Run Number 3 Purpose Pre-Acceptance
Operator Name HURTADO Completed Yes
Comments
Pipe
Asset ID LINE A Pipe Size 8"
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed 381.6 Year Laid
Year Renewed Sewer Use Sani
Manhole
r Upstream MH Number 7+02 (MH Upstream MH Depth
UpstreamMH Location Upstream MH Notes
Downstream MH 3+26 (MH Downstream MH
Number Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow NONE Signs Of Surcharge No
Other 1
Media Number DVD#1 (ORIGINAL) Truck Number UES TV TRUCK#19
Contractor Name MAVERICK Weather Dry
CONSTRUCTION
VCR Start Index VCR End Index
Created with the 1111 report generator Back 1
•
air
Utility & Environmental Services, Inc.
,�:,�> Inspection ' •actor' Cleaning 'Irencfi Saii'tl,
• P.O. Box 542015 1965 California Crossing Dallas, Texas 75354
912-556-2913 Fax 972-556-1614
Project Name: TRADEPOINT BUSINESS PARK - ULINE
EXPANSION
Date: 10/15/2015 12:31:00 PM Asset ID: LINE A
Location: 809 W. BETHEL RD Upstream MH Number: 3+26 (MH
Length Surveyed: 0 Downstream MH Number: 1+00 ( EXIST
CONNECTION
Run Number: 4 Direction Of Survey: Downstream
Pipe Size: 8" Pipe Material: Polyvinyl Chloride
Q4:10.) ID Number: 3+26 (MH
li
(6.0) SI - Start Inspection
F
k230.6) El - End Inspection a(1. CONNECTION
Total Distance: 0 0 ID Number: 1+00 ( EXIST CONNECTION
Created with the tr4. report generator Back
le
Utility & Environmental Services, Inc.
Tk�1 '. Inspection '��actor� C ,anirrg ' Trencl Safety
•
CP.O. Box 542015 1965 California Crossing Dallas, Texas 75354
II4
972-556-2913 Fax 972-556-1614
Project
TRADEPOINT
Project Name BUSINESS PARK- Location 809 W. BETHEL RD
ULINE EXPANSION
Date 10/15/2015 12:31 Direction Of Survey Downstream
City COPPELL ,TEXAS PO Number
Run Number 4 Purpose Pre-Acceptance
Operator Name HURTADO Completed No
Comments
Pipe
Asset ID LINE A Pipe Size 8"
Pipe Material Polyvinyl Chloride Pipe Shape Circular
Lining Method Total Length
Length Surveyed Year Laid
Year Renewed Sewer Use Sanitary
Manhole
1 C Upstream MH Number 3+26 (MH Upstream MH Depth
UpstreamMH Location Upstream MH Notes
Downstream MH 1+00 (EXIST Downstream MH
Number CONNECTION Depth
Downstream MH Downstream MH
Location Notes
Amount of Flow NONE Signs Of Surcharge No
iiiiiiimmimimi,th. ir
ir 1111P
Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19
Contractor Name MAVERICK Weather Dry
CONSTRUCTION
VCR Start Index VCR End Index
Created with the ' report generator Back i
0
Utility & Environmental Services, Inc
I IMF Low Pressure Air Test for Gravity Sanitary Sewer
Test Procedure:
Each section of sewer shall be tested between successive manholes.
Air shall be introduced into the pipeline until a 4.0 Psi gauge pressure has been reached.
At that time, the flow of air shall be reduced and the internal air pressure shall be maintained between
3.5 and 4.5 Psi gauge for at least two (2) minutes to allow the air temperature to come to
equilibrium with the temperature of the pipe walls. Pressure in the pipe shall be constantly
monitored by a gauge and hose arrangement separate from the hose used to introduce air
into the line. Pressure in the pipe shall not be allowed to exceed 5 Psi.
After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure
shall be used to determine the time lapse required for the air pressure to drop to 2.5 Psi gauge.
If the time lapse required for the air pressure to decrease from 3.5 to 2.5 Psi exceeds that shown in the
following table, the pipe shall be presumed to be within acceptable limits for leakage.
If the time lapsed is less than that shown in the table, the contractor shall make corrections
to reduce the leakage to acceptable limits.
Line Information Test Results Air Test Mandrel
Line Station to Station Pipe Size Psi L.F. Tested Time Passed? Passed?
A 12+87 8+71 8 4 416 8:52 Yes Yes
A 8+71 7+02 8 4 169 7:33 Yes Yes
A 7+02 3+26 8 4 376 8:52 Yes Yes
A 3+26 1+00 8 4 226 7:33 Yes Yes
Owner: Maverick Utility Construction Date: 8/25/15
Project: Tradepoint Business Park, Uline Expansion Job #:
Location:
�• Tested by: Jason Lawrence of Utility & Environmental Services, Inc.
Inspector: City of: Coppell