Coppell Ind 2- LR151015 Utility & Environmental Services, Inc. J Inspectioli ' '( actor (Y anirig encl1 ‘Safetv 41/4d. P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project Name: TRADEPOINT BUSINESS PARK - ULINE EXPANSION Date: 10/15/2015 9:51:00 AM Asset ID: LINE A Location: 809 W. BETHEL RD Upstream MH Number: 12+87 (MH Length Surveyed: 425 Downstream MH Number: 8+71 (MH Run Number: 1 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ' ID Number: 12+87 (MH (6.0) SI - Start Inspection (425.0) El - End Inspection Total Distance: 425 0 ID Number: 8+71 (MH Created with the 'rte. report generator Back Q .rrr■IM Utility & Environmental Services, Inc. TV. Inspection ' '("actor Cteaning lienc r Safety P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 97 2-5 56-1614 Project TRADEPOINT Project Name BUSINESS PARK- Location 809 W. BETHEL RD ULINE EXPANSION Date 10/15/2015 09:51 Direction Of Survey Downstream City COPPELL ,TEXAS PO Number Run Number 1 Purpose Pre-Acceptance Operator Name HURTADO Completed Yes Comments Pipe Asset ID LINE A Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 425 Year Laid Year Renewed Sewer Use Sanitary Manhole Upstream MH Number 12+87 (MH Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 8+71 (MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No Other Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19 MAVERICK Contractor Name CONSTRUCTION Weather Dry VCR Start Index VCR End Index Created with the r report generator Back I • ZoiUtility & Environmental Services, Inc. 1:'( ". Inspectziin965'i)iictor (Yearling 'r encfl Safety P.O. Box 542015 1California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project Name: TRADEPOINT BUSINESS PARK - ULINE EXPANSION Date: 10/15/2015 10:43:00 AM Asset ID: LINE A Location: 809 W. BETHEL RD Upstream MH Number: 8+71 (MH Length Surveyed: 172.2 Downstream MH Number: 7+02 (MH Run Number: 2 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride 0 ID Number: 8+71 (MH (6.0) SI - Start Inspection (172.2) El - End Inspection Total Distance: 172.2 ;•. ID Number: 7+02 (MH Created with they. report generator Back rINO ,rrrr�. Utility & Environmental Services, Inc. r. ,( ). Inspection Vactor Cleaning errc/ Safety • Z P.Q. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project TRADEPOINT Project Name BUSINESS PARK- Location 809 W. BETHEL RD ULINE EXPANSION Date 10/15/2015 10:43 Direction Of Survey Downstream City COPPELL ,TEXAS PO Number Run Number 2 Purpose Pre-Acceptance Operator Name HURTADO Completed Yes Comments Pipe Asset ID LINE A Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 172.2 Year Laid Year Renewed Sewer Use Sanitary Manhole •Upstream MH Number 8+71 (MH Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 7+02 (MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No Other Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19 Contractor Name MAVERICK Weather Dry CONSTRUCTION VCR Start Index VCR End Index Created with the �'' report generator Back 1 4 44Utility & Environmental Services, Inc. .1-. ( . Inspection " '( ' 7ctorCfealliiig1"'1?cl7 Safay P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 912-556-2913 Fax 972-556-1614 Project Name: TRADEPOINT BUSINESS PARK - ULINE EXPANSION Date: 10/15/2015 11:21:00 AM Asset ID: LINE A Location: 809 W. BETHEL RD Upstream MH Number: 7+02 (MH Length Surveyed: 381.6 Downstream MH Number: 3+26 (MH Run Number: 3 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride r � ' ' ID Number: 7+02 (MH (381.6) El - End Inspection I Total Distance: 381.6 0 ID Number: 3+26 (MH Created with the 47w report generator Back yam. _ �d■s, �r �r■iF �rrrrr� Utility & Environmental Services, Inc. 1:.(). inspection `factor (Ii'aning Trencfi Safety P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project TRADEPOINT Project Name BUSINESS PARK- Location 809 W. BETHEL RD ULINE EXPANSION Date 10/15/2015 11:21 Direction Of Survey Downstream City COPPELL ,TEXAS PO Number Run Number 3 Purpose Pre-Acceptance Operator Name HURTADO Completed Yes Comments Pipe Asset ID LINE A Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 381.6 Year Laid Year Renewed Sewer Use Sani Manhole r Upstream MH Number 7+02 (MH Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 3+26 (MH Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No Other 1 Media Number DVD#1 (ORIGINAL) Truck Number UES TV TRUCK#19 Contractor Name MAVERICK Weather Dry CONSTRUCTION VCR Start Index VCR End Index Created with the 1111 report generator Back 1 • air Utility & Environmental Services, Inc. ,�:,�> Inspection ' •actor' Cleaning 'Irencfi Saii'tl, • P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 912-556-2913 Fax 972-556-1614 Project Name: TRADEPOINT BUSINESS PARK - ULINE EXPANSION Date: 10/15/2015 12:31:00 PM Asset ID: LINE A Location: 809 W. BETHEL RD Upstream MH Number: 3+26 (MH Length Surveyed: 0 Downstream MH Number: 1+00 ( EXIST CONNECTION Run Number: 4 Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride Q4:10.) ID Number: 3+26 (MH li (6.0) SI - Start Inspection F k230.6) El - End Inspection a(1. CONNECTION Total Distance: 0 0 ID Number: 1+00 ( EXIST CONNECTION Created with the tr4. report generator Back le Utility & Environmental Services, Inc. Tk�1 '. Inspection '��actor� C ,anirrg ' Trencl Safety • CP.O. Box 542015 1965 California Crossing Dallas, Texas 75354 II4 972-556-2913 Fax 972-556-1614 Project TRADEPOINT Project Name BUSINESS PARK- Location 809 W. BETHEL RD ULINE EXPANSION Date 10/15/2015 12:31 Direction Of Survey Downstream City COPPELL ,TEXAS PO Number Run Number 4 Purpose Pre-Acceptance Operator Name HURTADO Completed No Comments Pipe Asset ID LINE A Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed Year Laid Year Renewed Sewer Use Sanitary Manhole 1 C Upstream MH Number 3+26 (MH Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 1+00 (EXIST Downstream MH Number CONNECTION Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No iiiiiiimmimimi,th. ir ir 1111P Media Number DVD#1 (ORIGINAL ) Truck Number UES TV TRUCK#19 Contractor Name MAVERICK Weather Dry CONSTRUCTION VCR Start Index VCR End Index Created with the ' report generator Back i 0 Utility & Environmental Services, Inc I IMF Low Pressure Air Test for Gravity Sanitary Sewer Test Procedure: Each section of sewer shall be tested between successive manholes. Air shall be introduced into the pipeline until a 4.0 Psi gauge pressure has been reached. At that time, the flow of air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 Psi gauge for at least two (2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pressure in the pipe shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 Psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine the time lapse required for the air pressure to drop to 2.5 Psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 Psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Pipe Size Psi L.F. Tested Time Passed? Passed? A 12+87 8+71 8 4 416 8:52 Yes Yes A 8+71 7+02 8 4 169 7:33 Yes Yes A 7+02 3+26 8 4 376 8:52 Yes Yes A 3+26 1+00 8 4 226 7:33 Yes Yes Owner: Maverick Utility Construction Date: 8/25/15 Project: Tradepoint Business Park, Uline Expansion Job #: Location: �• Tested by: Jason Lawrence of Utility & Environmental Services, Inc. Inspector: City of: Coppell