Loading...
Park West Crossing- CS160404 (2) H ff tes,Inc. ■•• HALFF 1201 North serRoad ��� North Bowser Road Richardson,Texas 75081 (214)346-6200 April 4, 2016 Fax(214)739-0095 City of Coppell Engineering Department Coppell, Texas Attn: George Marshall RE: Park West Crossing Phase II, City 2nd Review Half Associates has prepared the resubmittal package to address the applicable City comment dated March 18,2016. We have referenced the original city comments below in black and have our corresponding response directly below each in red italics. General 1. Remove XXX from cover page Revised 2. Provide a copy of the proposed plat in the engineering plans Noted. The plat is currently being revised to exclude 2 sections of a private water line and 3 sections of a public line where previous detector checks were. The plat at the time of this submittal is attached. 3. Remove Landscape from Civil Plan Review Noted. We request that the "for construction set"include landscape and irrigation for contractor purposes. 4. It appears in several areas that the sidewalk goes outside the ROW. Provide easements to cover this sidewalk 3 sidewalk easements are currently being added to the plat 5. Why is the sidewalk not extended further east? I believe the city has a future plan for a trail down Grapevine Creek area which may provide an access point We would recommend the sidewalk stop where it currently shows. When the trail is installed, the sidewalk connection could be part of the trail contract. A sidewalk right now that dead ends into the Creek is a potential safety hazard. There is no sidewalk on the south side of the bridge. 6. Remove Sheet C0.06 from this set.The engineering department does not review this type of plan.We request to keep this in the plan set for contractor purposes. We have added a note to the drawing bottom right that it was not reviewed by the City 7. Drainage area divide lines became hard to see in this submittal. Possibly change line type and thickness. Revised 8. Place the headwalls in the creek on piers.We have many failures of headwalls in the creeks. See revised plans 9. Tie fire line connections to stubs previously provided-4 out of 5 tapping sleeves and valves. We have tied into the existing Lot 1 stubout. 1 other tap will be utilitized for a public hydrant. 10. C3.06-label crossings These are labeled above the profile with the Station call outs Please let me know if there is anything else you need for your review and approval. Sincerely, HALFF ASSOCIATES, INC. Hunter Starkey, P.E.