Loading...
Fellowship-LR 990224IN-PLACE DENSITY TESTING 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/17/1999 Report No.: 9905305 Report Date 02/24/1999 Client No.: 47677000 Project No.: 94991026 Client: Julian P. Barry General Contractors Project: Fellowship of Las Colinas Arm: Harold Luedke Phase III - Expansion 6616 Forest Park Road Dallas TX 75235 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: Julian P. Barry Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Tan & bm silty clay w/gravel 18.5 109.0 -1/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Drainage Channel Backfill 35 5th Lift, 75' west of Storm Sewer, Line A 1 21.2 105.0 96 36 5th Lift, 450' west of Storm Sewer, Line A 1 21.5 105.8 97 37 1 st Lift, 620' west of Storm Sewer, Line A 1 20.1 105.7 97 38 2nd Lift, 625' west of Storm Sewer, Line A 1 21.5 104.9 96 Test results on this report meet project specilication. Technician: Roy Montgomery ~ Eng~nc. Report Distribution: (1) Juhan P Ban'y General ('ontractors (1) Urban Architeclurc Eugel~Harbour (t) City of Grapevine Vice President ~1 t City of Coppell This report is exclusively for the use oflhe client indicated above and shall not be reproduced except m full without the written approval of ItBC Engineering, Inc. 07TMP Page I of 1