Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST0301C- LR151120
l Underground Utility Service & Supply TV Camera Inspection Systems Manhole Company The Underground Utility Specialist DATE: 11/20/15 Project Number JOB NAME: Bethel Rd. & Coppell Rd. CITY: Coppell TEXAS CONTRACT NO. St 03-01C FILE NO. CITY INSPECTOR: Rick Odell CONTRACTOR: Four Star ADDRESS: 6825 levelland Rd. CITY: Dallas STATE: Texas INSPECTION FIRM: Magnum Manhole Company ADDRESS: P.O. Box 462427 CITY: Garland STATE: Texas OPERATOR: David D. P.O.Box 462427 Garland,TX 75046 972 276-2048 Fax: 972 276-5318 Project Name: Bethel Rd. and Coppell Rd. Project Name: Bethel Rd. and Coppell Rd. Line ID: "SS-1" Date: 11/19/2015 12:57:00 PM Upstream MH Station #: 9+89 Location: Coppell Rd. Downstream MH Station #: 7+40 City: Coppell,Tx. Pipe Size: 8" Contractor: Four Star Pipe Type: PVC Operator: D.Daniel Grade: 0.33% Contract#: ST 03-01C Direction: DOWNSTREAM Inspector: Rick Odell Page: 2 Distance Fault Observation 4.0 Start Inspection Remarks: Manhole 9+89 4.7 Lateral Connection Position: 10 69.6 Lateral Connection Position: 10 255.9 End Inspection Remarks: Manhole 7+40 ligCreated with the .1' ('�,1d report generator Back 1 Project Name: Bethel Rd. and Coppell Rd. Project Name: Bethel Rd. and Coppell Rd. Line ID: "SS-1" Date: 11/19/2015 1:41:00 PM Upstream MH Station #: 7+40 Location: Coppell Rd. Downstream MH Station #: 4+31 City: Coppell,Tx. Pipe Size: 8" Contractor: Four Star Pipe Type: PVC Operator: D.Daniel Grade: 0.80% Contract#: ST 03-01C Direction: DOWNSTREAM Inspector: Rick Odell Page: 3 Distance Fault Observation 4.0 Start Inspection Remarks: Manhole 7+40 116.8 Lateral Connection Position: 11 175.2 Lateral Connection Position: 11 295.1 Lateral Connection Position: 1 306.1 End Inspection Remarks: Manhole 4+31 Created with the n OSIV .--IF report generator Back ammib Project Name: Bethel Rd. and Coppell Rd. Project Name: Bethel Rd. and Coppell Rd. Line ID: "SS-1" Date: 11/19/2015 1:56:00 PM Upstream MH Station #: 4+31 Location: Coppell Rd. Downstream MH Station #: 2+05 City: Coppell,Tx. Pipe Size: 8" Contractor: Four Star Pipe Type: PVC Operator: D.Daniel Grade: 1.63% Contract#: ST 03-01C Direction: DOWNSTREAM Inspector: Rick Odell Page: 4 Distance Fault Observation 4.0 Start Inspection Remarks: Manhole 4+31 121.6 Lateral Connection Position: 1 167.0 Lateral Connection Position: 11 240.7 End Inspection Remarks: Manhole 2+05 Created with the Zi report generator Back Project Name: Bethel Rd. and Coppell Rd. Project Name: Bethel Rd. and Coppell Rd. Line ID: "SS-1" Date: 11/20/2015 8:59:00 AM Upstream MH Station #: 2+05 Location: Coppell Rd. Downstream MH Station #: 1+00 City: Coppell,Tx. Pipe Size: 8" Contractor: Four Star Pipe Type: PVC Operator: D.Daniel Grade: 0.95% Contract#: ST 03-01C Direction: DOWNSTREAM Inspector: Rick Odell Page: 5 Distance Fault Observation 4.0 Start Inspection Remarks: 2+05 62 2 Lateral Connection Position: 11 98 9 Abandoned Lateral Connection Position: 12 107.5 End Inspection Remarks: 1+00 Created with the ' S ' i report generator Back)