Loading...
North Lake-PT160429 (2) T N E • C I Y Y • o COPPELL ; s CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Tom Holland Date Submitted 4/29/16 Address of Applicant 1722 Routh Street,Suite 770,Dallas,TX 75201 Phone Number 214-270-0986 Fax Number Location of Construction (address, if available): Wrangler/Belt Line Intersection Subdivision Northlake/Cypress WatE Section # Block# Lot # OR Survey/Abstract # Acreage Location description (attach vicinity map): 1. Type of proposed construction or development: C Residential C Alteration of a natural waterway drainage course (' Non-Residential C Other (describe & attach drawing or sketch) C Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: ❑ Paving ❑ Median or Landscape ❑ Box Culvert ❑X Sidewalk ❑ Water Main ❑ Rip Rap ❑ Drive Approach ❑ R.C.P. ❑ Fill Area ❑x Excavation ❑ Sanitary Sewer Main ❑ Drainage Channel Excavation ❑ Fire Lane ❑ Flume ❑ Slope Protection/Retaining Wall ❑ Bridge 0 Inlet ❑ Parking Lot Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. I 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or 4 contract for the purpose of permit fee calculation verification. I U CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $17626 .48 Date Paid: 4/29/16 NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. >Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE:Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >A pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: Signature of Applicant Contact Number Signature of Inspector Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C Yes C� No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C' Yes C: No Are other federal, state, or local permits required? C Yes C' No C: PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED ity Appro Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T H R * C I T Y • !!► ir' Page COPPELL 4410 'ct INSPECTION FEE CALCULATION SHEET Project Name 'Wrangler/Belt Line Traffic Signal Date 4/29/16 As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: PUBLIC IMPROVEMENTS U PRIVATE IMPROVEMENTS a CONTRACT AMOUNT X 4/o= CONTRACT AMOUNT X 2/o= Paving 440,662 17,626.48 Water Sanitary Sewer Storm Sewer Alleys Sidewalks Other Total Grand Total (total of 17,626.48 both colored fields) Submit by E-mail Print Form George Marshall From: Tom Holland <tholland@Billingsleyco.com> Sent: Friday, April 22, 2016 12:31 PM To: George Marshall Subject: FW: Airline Drive and Belt Line Road Traffic Signal Attachments: Belt Line Road at Wrangler Drive Improvements - Revised 4-18-2016.pdf George The email below should have been addressed to you. Sorry, must have been multi-tasking. I'm going to get the check cut and sent over so we are ready to set up the precon as soon as we are cleared. Tom Holland Vice President, Development Billingsley Company I Direct 214-270-0986 www.billingsleyco.com<http://www.billingsleyco.com> Original Message From:Tom Holland Sent:Tuesday,April 19, 2016 1:03 PM To: 'George Marshall' <GMarshall@coppelltx.gov>; brad.moss@kimley-horn.com; Steve Jones <SJones@Billingsleyco.com>; Fieseler,Travis<tfieseler@lhlacy.com>; Ben Drake (bdrake@lhlacy.com) <bdrake@lhlacy.com> Cc: Michael Garza <MGarza@coppelltx.gov> Subject: RE: Airline Drive and Belt Line Road Traffic Signal Richard Attached is the updated cost schedule based on our discussion. Based on below I would calculate the inspection fee for the intersection improvements at$17,626.48. Please let me know if you agree and I will have the check cut and delivered to the city. Original Message • From: George Marshall [mailto:GMarshall@coppelltx.gov] Sent: Tuesday, April 12, 2016 4:38 PM To: Tom Holland <tholland@Billingsleyco.com>; brad.moss@kimley-horn.com; Steve Jones<SJones@Billingsleyco.com>; Fieseler,Travis<tfieseler@lhlacy.com>; Ben Drake (bdrake@lhlacy.com) <bdrake@lhlacy.com> Cc: Michael Garza <MGarza@coppelltx.gov> • Subject: RE: Airline Drive and Belt Line Road Traffic Signal Mr. Holland, Our construction inspection fees are 2%for private infrastructure and 4%for public infrastructure of the construction cost. This would exclude the engineering design costs. Thank You, George George Marshall, P.E. Traffic Engineer Engineering Department City of Coppell, TX 1 www.coppelltx.gov<http://www.coppelltx.gov> 972-304-3562 (office) 469-964-4731 (cell) Original Message From: Tom Holland [mailto:tholland@Billingsleyco.com) Sent: Tuesday, April 12, 2016 3:13 PM To: George Marshall <GMarshall@coppelltx.gov>; brad.moss@kimley-horn.com; Steve Jones <SJones@Billingsleyco.com>; Fieseler,Travis<tfieseler@lhlacy.com>; Ben Drake (bdrake@lhlacy.com) <bdrake@lhlacy.com> Cc: Michael Garza <MGarza@coppelltx.gov> Subject: Re: Airline Drive and Belt Line Road Traffic Signal George Do you all have a fee calculation for the intersection improvements based on the info below? Tom Holland Vice President, Development Billingsley Company I Direct 214-270-0986 www.billingsleyco.conn<http://www.billingsleyco.com<http://www.billingsleyco.conn<http://www.billingsleyco.com» On Mar 29, 2016, at 11:12 AM,Tom Holland <tholland@Billingsleyco.com<mailto:tholland@billingsleyco.com»wrote: George Attached is the cost breakdown for the approved Beltline Intersection ($380,182.11) and Wrangler Improvements ($106,058.88). Upon review, please provide us with the fee calculation for payment. For the development agreement for the wrangler improvements, below is what I would recommend to allow for the cost allowance. Let me know of your thoughts. Thanks WRANGLER IMPROVEMENTS: Soft Costs * KHA: $19,000 Hard Costs * Lacy: $106,058.88 * City of Coppell Fees: Assumed Waived for this portion of the work. * Alpha (Material Testing): $7500 (allowance-reimburse actual costs incurred) * Franchise Utilities: $10,000(allowance-reimburse actual costs Incurred) * Contingency: $10,000 (reimburse actual costs incurred) Total Estimated Costs: $152,559 2 Tom Holland Vice President, Development Billingsley Company I Direct 214-270-0986 www.billingsleyco.com<http://www.billingsleyco.com<http://www.billingsleyco.com<http://www.billingsleyco.com» BILLINGSLEY COMPANY temporary office location Temporary Office and Delivery Address: 1722 Routh Street, Suite 200, Dallas,TX 75201 New Permanent Mailing Address: 1722 Routh Street, Suite 770, Dallas,TX 75201 *Please note all phone numbers and e-mail addresses will remain the same. From: George Marshall [mailto:GMarshall@coppelltx.gov] Sent: Wednesday, October 28, 2015 7:13 AM To: brad.moss@kimley-horn.com<mailto:brad.moss@kimley-horn.com> Cc: Michael Garza <MGarza@coppelltx.gov<mailto:MGarza@coppelltx.gov»; Tom Holland <tholland@Billingsleyco.com<mailto:tholland@billingsleyco.com>> Subject: Re: Airline Drive and Belt Line Road Traffic Signal 2 copies sent to engineering. Sent from my iPhone George Marshall, PE 469-964-4731 On Oct 27, 2015, at 11:15 PM, "brad.moss@kimley-horn.com<mailto:brad.moss@kimley-horn.com>" <brad.moss@kimley-horn.com<mailto:brad.moss@kimley-horn.com»wrote: Michael/George- We have our traffic signal plans ready for City review at the subject intersection. Please let me know what format we need to submit our plans. Thanks. [http://www.kimley- horn.com/communication/signature/KimleyHorn_LG_LOGO_RGB_PRIMARY_96dpi.jpg]<http://www.kimley-horn.com/> Bradley Moss, P.E. (TX, OK, NC), LEED AP Kimley-Horn I 12750 Merit Drive, Suite 1000, Dallas,Texas 75251 Direct: 972.770.1316 I Main: 972.770.1300 I Mobile: 469.525.7272 Connect with us: Twitter<https://twitter.com/kimleyhorn>I Linkedln<http://www.linkedin.com/company/kimley-horn-and-associates- inc.> I Facebook<https://www.facebook.com/KimleyHorn> YouTube<http://www.youtube.com/user/KimleyHornAssociates> Proud to be one of FORTUNE magazine's 100 Best Companies to Work For ■ <Belt Line Road at Wrangler Drive Improvements- Revised 3-11-2016.pdf><CWPH3R-KHA-Olympus Addendum 2.pdf> 3