Loading...
ST0502B- LR160406PILLIf ICE GEOTMMICAL GROUP Acct ID: 1770 Report Date: 04/06/2016 Project: Freeport Parkway North Location: Reinforcing Steel Inspection Client: City of Coppell REPORT: Reinforcing Steel Inspection Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444-8889 Fax: (972) 444-8893 File No: C15-0812 Date Sampled: 04/04/2016 Sampled By: Rodney Corbin By Order Of: Walter Order Number: 1770 LAB NO: 207047 TEST RESULTS Report No: 207047 Page 1 of 1 We visually inspected the reinforcing steel for sidewalks. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. Sidewalks: South sidewalk from west to east at Station 15+00 to 11+50 • Details Referenced: City of Coppell Standard Specification Reference Plan Page 2170 • Remarks: Reinforcing Steel appears to be in compliance with the project specifications. Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, SET, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION