ST0502B- LR16042119LLIfY'ICE
GEOTECFN'IICRL
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444-8889 Fax: (972) 444-8893
Acct ID:
1770 File No: C15-0812
Date Sampled:
04/15/2016
Report Date: 04/21/2016
Sampled By:
Omar Kannah
Project:
Freeport Parkway North
By Order Of:
Walter
Location:
Reinforcing Steel Inspection
Order Number:
1770
Client:
City of Coppell
_
REPORT:
Reinforcing Steel Inspection
LAB NO:
208218
TEST RESULTS Report No: 208218
Page 1 of 1
We visually inspected the reinforcing steel for box culvert. Our inspection included verifying the proper size of the
reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including
spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for
excessive rust deposits.
Other: Box culvert wing wall and anchorage curb
• Drawing Date: 1/23/2015
• Details Referenced: Sheet 104 of 128 and Sheet 62 of 128
Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy)
Respectfully Submitted,
Alliance Geotechnical Group
&1-:4 <.—
Perry C. Kakara, SET, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION