Loading...
ST0502B- LR16042119LLIfY'ICE GEOTECFN'IICRL Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444-8889 Fax: (972) 444-8893 Acct ID: 1770 File No: C15-0812 Date Sampled: 04/15/2016 Report Date: 04/21/2016 Sampled By: Omar Kannah Project: Freeport Parkway North By Order Of: Walter Location: Reinforcing Steel Inspection Order Number: 1770 Client: City of Coppell _ REPORT: Reinforcing Steel Inspection LAB NO: 208218 TEST RESULTS Report No: 208218 Page 1 of 1 We visually inspected the reinforcing steel for box culvert. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. Other: Box culvert wing wall and anchorage curb • Drawing Date: 1/23/2015 • Details Referenced: Sheet 104 of 128 and Sheet 62 of 128 Orig: City of Coppell (Coppell, TX) Attn: Mr. Rick O'Dell (1 -cc copy) Respectfully Submitted, Alliance Geotechnical Group &1-:4 <.— Perry C. Kakara, SET, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION