Loading...
Park West Crossing-PT160427 COFFELLTMK . C I T T • 0 F<44 44<te r 40* , CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Tim Geisler,ML Realty Date Submitted 4/27/16 Address of Applicant 1 Pierce Place Suite 450 Itasca, Illinois 60143 Phone Number 630-250-2903 Fax Number 630-250-2901 Location of Construction (address, if available): 401, 435, 501, 551 Southwestern Blvd Subdivision Park West Crossing Section# Block# A Lot# 2,3,4,5 OR Survey/Abstract# 1296 Acreage 24.059 Location description (attach vicinity map): Southestern Blvd and Coppell Road i 1. Type of proposed construction or development: Residential 0 Alteration of a natural waterway drainage course X+ Non-Residential C Other (describe& attach drawing or sketch) 0 Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: Paving a Median or Landscape ❑ Box Culvert • Sidewalk ►y Water Main ❑ Rip Rap ga Drive Approach rze R.C.P. ❑ Fill Area ❑ Excavation 1j Sanitary Sewer Main 0 Drainage Channel Excavation gl Fire Lane g' Flume 0 Slope Protection/Retaining Wall ❑ Bridge 0 Inlet ❑ Parking Lot Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $58,354.65 Date Paid:427/16 NOTE:A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the CYty Engineer. >Any work requiring closure of a lane of traffic,street,or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department©972.462-5150 Fire Department Q 972-3043512 Engineering Dept. 972-3043679 ➢Attach barricade plan/trench safety plan of a lane or street closure. (Required) >It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE:Street closures are allowed from 9:00 am,until3:30 p.m.ONLY unless otherwise approved by City Engineer. >A pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: :.� ea 30 Signature. of Applicant Contact Number Signature of Inspector Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C Yes C No If YES, a floodplain Development Permit is required before any construction can begin. Is additional information required? C Yes C No Are other federal,state, or local permits required? C Yes C No -C PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED ` Approval Date _... , Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. r is E , e I T Y . Q F Page 3 COPE L INSPECTION FEE CALCULATION SHEET Project Name A,ti?Y_IIJ t1,4c, 4tt\% Date Pa;-rte As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are f' due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: PUBLIC IMPROVEMENTS PRIVATE IMPROVEMENTS X 4% X 2%— CONTRACT AMOUNT CONTRACT AMOUNT Paving Zg ��� *)% t S'4� lb1 `-' . �c� %2,8\S • Water acl • i6s, g •\S sz-s$ •sg(]bS\60 'ZO. Sanitary Sewer e 4%7 gp • �� $�j ICo• Storm Sewer ©t•-%C, �� �j'19 ZC�� 1 \c,R-�•Q:c2) Alleys /A S 1 � 7�, Sidewalks ,�ZGc 5 $L .:c;1Co' ZX 1'z. \•4 �.2r! - I jl1 Other Total IOlc\ \' 41 :1,Sir Grand Total(total • (:)..Sboth colored fields)) Submit by E-mail Print Form MAVERICK UTILITY CONSTRUCTION-,INC. P.O.BOX 728 EULESS,TX 76039 OFFICE:(817)684-0858 FAX:(817)684-0360 --i----i----i----*----i----i----i----i----i----i----i----*-- E Robin, Please find the dollar amounts below for value of the private&public work at Park West Crossing Ph II Private Water -$258,009.87 Public Water -$129,628.87 Private Sanitary Sewer -$20,800 Public Sanitary Sewer -$44,500 Private Storm -$579,250 Public Storm -$0 ryan`Yg e VP of PreconsfrucEion 1 v Page 1 of 1 .• Park West Crossing City/Private site work breakout `" ' i Jared Ratjen „:" to: Robin.Povey@structuretone.com 01/15/2016 10:14 AM Cc: Denis Gee,Vincent Gallagher Hide Details From: Jared Ratjen<jratjen@potterconcrete.com> To: "Robin,Povey@structuretone.com" <Robin.Povey@structuretone.com>, Cc: Denis Gee<Denis.Gee@structuretone.com>,Vincent Gallagher <Vincent.Gallagher@structuretone.com> Robin, Here is a breakout for accounting purposes only that you can provide to the owner.Once again, I don't have city walks,but I called Vincent for a quantity and gave you something that you could use for the owner for breakout below. If you need anything else call my cell and I'll get it to you. I'm in and out of the office for the I rest of the day. 1 Public concrete site work: 1 Approaches-$28,960 City Walks-$66,907(not currently included in our scope) Total public-$95,867 Private concrete site work: Paving w/curb-$1,394,567 Sidewalks-$125,114 Total private-$1,519,681 Thanks, Jared Ratjen I Commercial Estimator 2400 East Pioneer Drive I Irving,TX 75061 Direct Office:972-887-5592 I Cell:214-552-6389 JRatjen@PotterConcrete.com s'TTER ONCRETE, LTD. VA a file:///C:/Users/robin.povey/AppData/Local/Temp/notesCFC342/web3066.htm 1/15/2016 I I �111rr.M �rr■�► Park West Crossing 24-hour Contact: Damon Renaud Job Superintendent with Structuretone Cell: 469-203-5420 gg r �.w„ m .«.,*.-� .w�n-""' lk . a i , a✓. 4 E. H r • y a i E t s ws ~, TzARG.ET LOCATION _ f Southwestern Bi t. 10. f ^z, ' s , •fia' °�' a 1 / a a - • ,Ift 'eat'-" � �i Avfi°�.• e3p# _ ty , '7, " yr, ''" ,,.1 * m Iib... _, 1 � 1, *-^1 /\''*41'A‘''Lt-v* '''I''' 4 -.''' 7' • ',,,", 0,.4,' :".a ''1,1!.'1,'°,/ 4,v".4 fir""44-'14 k ,,, , . . ,,, t,,,,,„k,v . .;. - .i.,t . , 4 t,'IN .."1, ,X,,,4 ,, , S.. iii e•trIfew:P1.1,,, € /, , 4.10 1 .11.W .),,,At , -,- -• , ,,,.. 14,* ; ea rt h .,...— 0 :.•,,,,,, .p, ,,,,43,,,,, . , 'it.1.,.%, 71 .. ,...,.,.. , , I 1