Loading...
Park West Crossing- CS160324 (2)T H E C 1 T Y O F CO I PPELL s > a 9 March 24, 2016 Hunter Starkey, P.E. Halff Associates, Inc. 1201 North Bowser Rd. Richardson, Tx 75081 RE: Parkwest Crossing Lots 2-5 Blk. A Fee Assessment Letter Dear Mr. Starkey, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make note of a credit for the Roadway Impact Fees to the City of Coppell in the amount of ($146,196.96). No payment necessary. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre -construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, George S. larshall, P.E., CFM Traffic Engineer cc: Jennifer Miller, Finance Director Rachel Evans, Administrative Technician, Building Inspections Michael Garza, P.E., Assistant Director of Public Works Tim Oates, Deputy Chief/Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV DEVELOPMENT FEE WORKSHEET PROJECT: Parkfvest Crossing Lots 2-5Blk. A DATE: 3123/2016 Water Impact Fee: Domestic Meter(s): 4 - 2 inch = 21.32 ESU's Irrigation Meter(s): 4 - 2 inch = 21.32 ESU's 0 = 0 ESU's Fireline Meter(s): 5 - 8 inch = 2.5 ESU's Total #: 45.14 ESU's @ $900.00 ea. $40,626.00 (Due prior to issuance of building permit) Per dev. Agreement 2008 Water Tap Inspection Fee: Total #: 13 Connections @ $50.00 ea. $650.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 4 Domestic Meter(s) @ $882.00 $3,528.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total #: 4 Irrigation Meter(s) @ $882.00 $3,528.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 5 Fireline Meter(s) @ n/a meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. $120.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 9 Meter(s) @ $30.00 ea. $270.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 21.32 (Due prior to issuance of building permit) @ $900.00 ea. $19,188.00 Per dev. Agreement 2008 Wastewater Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 4 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $200.00 $200.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): X Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot 0 Multi -family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Credit ($146,196.96) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $0.00 Information not Available Information not Available Information not Available DEVEL0PPAE1vvJ F EE TABLE Project: Parkwest Crossing Lots 2-5 Blk. A Date: 3/23/2016 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $40,626.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $650.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $3,528.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,528.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $120.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $270.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $19,188.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $200.00 (100% due at Issuance of Buildina Permit) Utility Final Inspection Fee $200.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) 11 Street Sign Fee Information not Available (100% due prior to Acceptance of Project) 11 Construction Inspection Fee Information not Available (100% due prior to Start of Construction) COTAL 11 $68,310.00 IF TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Parkwest Crossing Lots 2-5 BIL A DATE: 3/23/2016 ROADWAY IMPACT FEE: Service Area * 1 Category ** Light Industrial Land Use ** General Light Industrial Building Areas 304,577 Development Units ** 304.58 Vehicle Miles per Development Unit ** 3.2 Fee per Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $146,196.96 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) Per developers agreement 2010 Percent of Credit Toward Roadway Impact Fees 100% Total Credit $146,196.96 Step 1 Click on the icon to the right if you need a fee asessment letter Step 2 Click on the icon to the right to clear any existing data from the tables WATER IMPACT, WASTEWATER IMPACT AND PARK FEE DATA TABLE 11 Water and Wastewater Data 11 I Project Name (Name on Plat) Parkwest Crossing Lots 2-5 Blk. A Parkwest Crossing Lots 2-5 Blk. A Todays Date 3/23/2016 Step 1 Enter the Number of Domestic Meters 4 Step 2 Select the Size of Domestic Meters - 2 inch Step 3 Enter the Number of Irrigation Meters 4 Step 4 Select the Size of Irrigation Meters -2 inch Enter Building Area in Square Feet 0. f. .. ..... re O.Ze"­ Ste 5 ................. .................................. ............................ ........................... ............................ ...................................... 100% Step 7 Enter the Number of Fire Meters 5 Step 8 Select the Size of Fire Meters 8 inch Step 9 Select the Type of Development Non -Residential Step 10 Development Category (Residential Only) .... ...... .. . . ...3 . ............ . . . .................... Step 11 Number of Residential Lots/Apt. Units (Residential Only) mint unit . ................ . ....................................... Step 12 Select the Date the Preliminary Plat was Approved After October 26, 1993 lStep 13 lSelect the Relative Location of the Site (Residential Only) Go to "Development Fee Worksheet' for Results ROADWAY IMPACT FEE DATA TABLE Project Name (Name on Plat) Parkwest Crossing Lots 2-5 Blk. A Step 1 Service Area, use #1 revised 10/11/2005) 1 Step 2 Development Category Light Industrial Step 3 Land Use General Light Industrial ,Step 4 Enter Building Area in Square Feet 304,577 Ste 5 Select of Credit that Applies to this Project 100% ........ ..... Cast : Per: Service: Unit �O r96h,rnile) ................ ............ ............ ..... ... . ..... . .. ..... $ 1 :5 0.00. ....... .............. 0.4.,. 6.7..7 .. .... ........ .............. DeVeldphtU its ... . .... ...... .. . . ...3 . ............ . . . .................... ...... mint unit . ................ . ....................................... . ....... ....... .............. ..... ........ ..... . .. .