DCT Fellowship- LR160224 (3)
2 4 2 4 S T U T Z D R . S U I T E 4 0 0 D A L L A S , T X 7 5 2 3 5 T E L [2 1 4 ] 3 5 0 5 6 0 0 F AX [2 1 4 ] 3 5 0 0 0 1 9
REPORT OF FLOOR FLATNESS
DCT Freeport West
Bethel Road and Creekview Drive
Coppell, Texas
REPORTED TO: DCT Industrial Trust
5430 LBJ Freeway, Suite 1030
Dallas, Texas 75240
ATTN: Mr. Joe W illiams
REPORT NO. 20
REPORT DATE: 02-24-16
REG PROJECT NO. 20922
TECHNICIAN: J. Newkirk
PAGE: 1 of 2
CONTRACTOR: FCL Builders Texas
Pour Number: 1 Area Measured: 22,950 Sq. ft.
Pour Location: Lines A to K form 1 to 2
No. of Fl Samples: 37 No. of Runs: 22
Sampling Method: Point elevations were measured at regular 12-inch intervals along
straight lines up to 46 feet in length. The elevation differences between
all adjacent reading points, the arithmetic differences between all
adjacent 12-inch elevation differences, and the elevation differences
between all points separated 10 feet were then calculated. Estimates of
the floor’s flatness and levelness F-Numbers (Ff & Fl) were obtained
through a statistical analysis of these calculated profile values.
Date
Measured
Date
Placed
Measured Value
(Ff/Fl)
Specified Minimum
Local Value (Ff/Fl)
Specified Minimum Overall
Value (Ff/Fl)
02-19-16 02-18-16 70.11/56.54 25/17.5 50/35
Ff
70.11 ( 67.98 – 72.23 )
Fl
56.54 ( 54.60 – 58.48 )
Based upon the number of samples taken, there is a 90% certainty that the actual F-Numbers of the surfaces surveyed will fall
within the ranges, which follow the respective estimated Flatness and Levelness F-Numbers.
The area measured complies with project specifications.
E-Mail
Distribution: (1) DCT Industrial Trust/
Mr. Joe W illiams
(1) DCT Industrial Trust/
Mr. Sophia Montemayor
(1) FCL Builders Texas/Mr. Drew Hanlon
(1) Pross Design Group/Mr. Bobby Pross
(1) City of Coppell/Mr. Marcus Marion
(1) Pacheco Koch/Mr. Clayton Strolle
(1) McHale Engineering/Mr. Matt Skaggs
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Bill W oolwine
Sr. Manager, CMT
BW /sp