Loading...
DCT Fellowship- LR160323 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 46 REG PROJECT NO. 20922 SAMPLE DATE: 03-23-16 TECHNICIAN: C. Hammonds PAGE: 1 of 1 CONTRACTOR: FCL Builders Texas Location of Sample Set Number Location Quantity Represented (c.y.) 1 Pier cap: K-5 9.5/9.5 Design Information Source of Concrete Mix Identification Specified Strength (psi) LMC 5150 3000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 6336 03-30-16 7 37290 2970 6336 04-20-16 28 6336 04-20-16 28 6336 04-20-16 28 6336 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 6336 4.0 11:15 AM 70 74 1.3 149.1 63099663 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Ethan McIntosh Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn