Loading...
DCT Fellowship- LR160404 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 53 REPORT DATE: 04-04-16 REG PROJECT NO. 20922 TECHNICIAN: A. Chavez PAGE: 1 of 1 CONTRACTOR: FCL Builders Texas Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 5 D-698 Dark brown & reddish brown clay 17.4 106.3 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 283 03-23-16 Water Line 1: STA 10+75 2.0 101.8 20.8 5 95.8 284 Water Line 1: STA 10+75 1.0 103.9 17.9 5 97.7 285 Water Line 1: STA 10+75 0.0 104.0 17.6 5 97.8 286 Water Line 1: STA 12+25 2.0 102.5 19.9 5 96.4 287 Water Line 1: STA 12+25 1.0 104.2 17.6 5 98.0 288 Water Line 1: STA 12+25 0.0 103.8 20.0 5 97.6 289 Water Line 1: STA 13+75 2.0 102.9 17.8 5 96.8 290 Water Line 1: STA 13+75 1.0 101.0 18.8 5 95.0 291 Water Line 1: STA 13+75 0.0 103.3 17.9 5 97.2 Comments: Where tested, materials were in compliance with project specifications. E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Ethan McIntosh Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/sp