Fellowship-CS010517 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: S-1186 POTTER CONCRETE P & Z HEARING DATE: May 17,2001 C.C. HEARING DATE: June 12, 2001 LOCATION: Along the west side of Creekview Drive, approximately 900 feet south of Royal Lane. SIZE OF AREA: Approximately 1.16 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: LI-S.U.P. (Light Industrial, Special Use Permit) for a temporary concrete batch plant. APPLICANT: John P. Harris Potter Concrete 4820 Gretna Dallas, TX 75207 (214) 630-2191 FAX: (214) 689-1066 HISTORY: Them has been no platting history on the subject site. TRANSPORTATION: Royal Lane is a C4D/6 four-lane divided collector built to standard in a 100'-wide fight-of-way capable of accommodating a 6-lane divided thoroughfare. Creekview Drive is a C2U two-lane undivided collector built to standard within a 60'-wide fight-of-way. SURROUNDING LAND USE & ZONING: North- vacant; '%I" Light Industrial South -vacant; "LF' Light Industrial East - office/warehouse; "LI" Light Industrial West - vacant; "LI" Light Industrial Item # 6 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for Light Industrial and showroom uses. DISCUSSION: The applicant is requesting special use permit approval to allow the operation of a temporary concrete batch plant located at the west end of Creekview Drive. According to the Zoning, Ordinance, temporary concrete batch plants are permitted for a period not to exceed 90 days. If additional time is needed beyond the permitted 90-days, a special use permit is required. The applicant has indicated to staff that typically the 90-day allowance for the batch plant would provide adequate time to serve one site; however, in this instance, the applicant will be serving four large off- site locations from this batch plant. The applicant will serve the following locations: · Freeport VII-Lot 2, Block A, Freeport North (611 Royal Lane) · Tradepoint Industrial Park (Champion Partners) NE comer of Royal & Bethel · Freeport IX (Duke-Weeks Realty Corp.) North side of Bethel Road, at Freeport Parkway Extension · Koll -Coppell Commerce Center (Koll Development) NE comer of Freeport Parkway & Burns The temporary concrete batch plant is located on Fellowship Church property. A letter was provided to the City that indicates the approval by the Fellowship Church Facilities Manager for the placement of the batch plant on the property. As noted in the letter, the applicant will be required to return the property to its original condition subsequent to the operations of the concrete batch plant. To ensure that the site is restored to its original state, staff has included a recommendation to this effect. Additionally, at the request of staff, the applicant has provided a fire lane, providing emergency access to the batch plant. In order to protect and preserve the vacant Fellowship Church property, the applicant has constructed a silt fence surrounding the entire area of activity related to the operations of the batch plant. The applicant has also secured the necessary permits through the Texas Natural Resource Conservation Commission. It is staff's understanding that the permit through TNRCC is also of a temporary nature, for a period not to exceed 6 months, allowing for 90-day extensions up to one full year. Staff requests that the applicant maintains a current TNRCC permit and provide a copy for our records. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the special use permit, subject to the following conditions: Item# 6 1) The applicant shall be permitted to remain operational on the subject site for a period not to exceed one year, while maintaining the required permits through the Texas Natural Resources Conservation Commission. 2) The applicant shall provide a copy of all TNRCC permits to the City. 3) Once operations of the concrete batch plant cease, the applicant shall restore the subject site to its original condition ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Letter to Fellowship Church 2) Letter from TNRCC (2 pages) 3) Overall Site Map 2) Site layout Item # 6 i RAYMOND CON~,T~UG't'I ON INO Fcbrum'y 14, 2001 Fellowship Chumh Attn: Ope~atior~ M~n~ger C~c~w D~v~ Prope~ Cop~, T~ D~ ~: Per yo~ ~nver~on wi~ B~cc H~ on Feb~ 9e~ ~ymo~d Co~tlon Comfy ~[ put ~ ~ conorctc b~ pI~t on ~e p~op~y o~ by Fe~ows~p Ch~h lo.ted at ~ee~ew ~ve ~ ~p~ll. We ~ not cut do~ ~y ~e~ ~d ~e ~~ ~ll be ct~ of~y debris ~en ~cjob ~ FellowsNp Churci 00 B7:~ ~,A~ ~-~ ~-.-x~ Date: Mar-30-01 01:18P City ~ Co~pell 972 ~q4 3514 P.03 - - - Robe~'J. H~ton; ~ai~' . . "'' ' 'R. · * - John M. Jeffrey TE S NATU RESOURCE CONSERVATION CO ISS]ON ~tect~g T~ by Reduc~g ~d ~t~g ~lluti~ March 2,2001 Mr. John P. Harris Portable Production Manager Potter Concrete, Incorporated 240 Singleton Boulevard Dallas, Texas 75212 Re: Portable Concrete Batch Plant No. I TNRCC Acct. No. 94-0323-F Coppell, Dallas County Dear Mr. Harris: This is to acknowledge receipt of the information required for review by this agency prior to movement of your Portable Concrete Batch Plant No. I to a new site. Your cooperation in this matter is appreci- ated. The information submitted in support of your request has been evaluated and determined to be substan- tially equivalent to that provided in the Application for Permit to Construct. Based on the evidence presented and information gathered by this office, it has been determined that authorization can be granted to construct and operate this permit unit at a site located at 1300 Creekview Drive, Coppell, Dallas County, Texas. This authorization is contingent upon continued compliance with the terms of the Permit No. 40323 which are legally enforceable. Sincerely, Tony L. Walker Air Section Manager Region 4 - Arlington TLW/amr REPLY ~'0: R£CtO~ 4 · 1101 E. ARKA~$~ LA~E · ARLINGTON, TEXAS 76010-~99 * 817/469-6750 * F~ 817~95-2519 P.O. Box 13087 · Amen, T~ 78711-3087 · 51~9-10~ * Interact address:~.~rcc.s~te.~.us ~mtd on rc~ ~r usm~ ~.~d i~ Mar-30-01 01:19P City om Cop_@~e_.ll 972 ~ 3514 P 05 · ',. .... ~" ;~ ' ' *~ s' , · r ........ ~ ',-~-~'~ ~ * ..... ~ · ?.~-'~ ~ ~* ~ .~.~ ~-~ ~ . i.~.; :l.;..l.. ;.: :l. ~..~:.:?.~: .: ~l; ~..~;: N~[~f~t[O~ O~ i,~[~. 1~ ~vi:' l-:- ;-~':i;:.'.:':i'~ .';;.,'t;'"t' ', i/, ' i : "';'~'.?-:i'l'i"~:~l ',-'~i" ~:'i i" i';- 7 --.. ~.-~ ? ~-- ~,, ~-~ -~ ~ ~-~ ......... ~..-~ .... ~.. ~.~.~,.~. _ ~ -,-~-.~.~,~.~.~ .... ~.~_._~ ; ~ . ' ~' ~ ": f .. Add~s~ "~'~b~. ~~'~ -~'.' ~'; '-~ ' ' ~ ? .~: ;. ~'~.','i -~' .~ 2. Type of facility: Pe~l.l(~ &=~~ 3. a. Account identification number: ~- o b. Permi[ Humber: 4. quan[i[y and type of air pol~u[Jon con[to1 equJp~n[: 4 o lJ~ ~ ~o K 5. Loca[ton p~an[ is ~o be ~ved fro= (city, courtly, exac[ description): ~o ~,~ / ~cp~l~~5 ~//~.s 6. Location plant is to be ~ved to (ciJ~,: county, exact location description): I~Od ~ffV,'~ ~~l,~ ~//~ 7. Area map showing location of new site: 8. Proposed date for start of construction: ~~ ~y~~/ 9. Proposed date for start of operation: ~~ ~a~ Joo / 10. Expected length of ti~ at new location: /~ Has a copy of this notification has been sent to the regional office of the Texas Air Contel Board having jurisdiction over the area to which this plant is to be ~ved? ~es ~ No It is hereby agreed that the facility identified herein will not be . constructed at the proposed site or any other site unttl authorization is received fro~ the Executive Director of the Texas' Air Control Board. DATE ~ ~-/J-~, Signature Name ~A Title ~~ city o f coppell SITES TO B SERVED BY POTTER CONCRP__. I  DUKE-WEEKS ___ (FREEPORT IX) BATCH PLANT FREEPORT VII TRADEPOINT (CHAMPION) .~ KOLL COPPELL ~