Fountain Park 1-CS 931220DATE: Dec TO: Lar FROM: Hox RE: Wa~ Utilities personnel perfor~ following items to be def COPPELL PUBLIC WORKS ,,mber 20, 1993 / / Davis, Construction Inspector ~ard L. Pafford, Utilities Superintendent er/Sanitary Sewer Walk-Through @ Fountain Park ned a walk-through on the above referenced project and found the ~cient: 8" water line tie ipto 16" needs to be cut off and plugged at T inside subdivision. Also, the abandon~xl pipe needs to be plugged at both ends to prevent dirt from entering the pipe ~d causing surface failure. Screening walls and a final grade in the right-of-ways and easements must be set and/or completed. Please ensure these items[ have been corrected prior to the final acceptance of this project. HLP/dm WALKTHRU. HLP.FOI4NTAIN.HLP