Fountain Park 1-CS 931220DATE: Dec
TO: Lar
FROM: Hox
RE: Wa~
Utilities personnel perfor~
following items to be def
COPPELL PUBLIC WORKS
,,mber 20, 1993 /
/
Davis, Construction Inspector
~ard L. Pafford, Utilities Superintendent
er/Sanitary Sewer Walk-Through @ Fountain Park
ned a walk-through on the above referenced project and found the
~cient:
8" water line tie ipto 16" needs to be cut off and plugged at T inside subdivision.
Also, the abandon~xl pipe needs to be plugged at both ends to prevent dirt from
entering the pipe ~d causing surface failure.
Screening walls and a final grade in the right-of-ways and easements must be set
and/or completed.
Please ensure these items[ have been corrected prior to the final acceptance of this project.
HLP/dm
WALKTHRU. HLP.FOI4NTAIN.HLP