Fountain Park 1-CS 93121512×15×9~ 19: 28
DATE:
TO:
FROM:
COPPELL PUBLIC WORKS
RE:
MEMORANDUM
Dec :tuber 15, 1993
Lany Davis, Construction Inspector
Hov~ard L. Pafford, Utilities Superintendent
Wa1:r/Sanitnry Sewer Wal.k-Tl~rough ~ Foul~tain Park
Utilities pm'sonn¢l pcrforr
and £ound the lbilowing il
Flow problem - ¥
subdivision is fi.ow
:led a walk-through on the above referenced project this moJ'ning
ems to be. deficient:
~'hen you fi.ow one fire hydrant partially open, the rest of the
ing inadequately. Flow problmn should be corrected.
8" water line tic in to 16" nenats to be cut off mid plugged at T inside subdivi.~ion.
Also, the abandoned pipe needs to be plugg~tl at. both ends to prevent dirt from
entering the pipe and caus~ng surface failure.
Screening walls m~d a final grade in the right-of-ways and easements must be set
and/or completed.
Please ensure these items have bt.~n corrected prior to tl~e final acceptance of this project.
HLP/dm