Loading...
Fountain Park 1-CS 93121512×15×9~ 19: 28 DATE: TO: FROM: COPPELL PUBLIC WORKS RE: MEMORANDUM Dec :tuber 15, 1993 Lany Davis, Construction Inspector Hov~ard L. Pafford, Utilities Superintendent Wa1:r/Sanitnry Sewer Wal.k-Tl~rough ~ Foul~tain Park Utilities pm'sonn¢l pcrforr and £ound the lbilowing il Flow problem - ¥ subdivision is fi.ow :led a walk-through on the above referenced project this moJ'ning ems to be. deficient: ~'hen you fi.ow one fire hydrant partially open, the rest of the ing inadequately. Flow problmn should be corrected. 8" water line tic in to 16" nenats to be cut off mid plugged at T inside subdivi.~ion. Also, the abandoned pipe needs to be plugg~tl at. both ends to prevent dirt from entering the pipe and caus~ng surface failure. Screening walls m~d a final grade in the right-of-ways and easements must be set and/or completed. Please ensure these items have bt.~n corrected prior to tl~e final acceptance of this project. HLP/dm WALKTH RU. H LP. FOUNTA IN .Iql .P