Fountain Park 1-CS 931011KADI,ECK &
ASSOCIATES
5336 ALPHA RD., SUITE 5
D~, TX 75240
214-702-0771
October 11, 1993
Mr. Ken Griffin, P.E.
Engineering Department
255 Parkway Blvd.
P.O. Box 478
Coppel 1 75019
Re ppel
1, Texas
Dear Ken:
Attached is a copy of a letter from Reed Engineering Group
regarding the subgrade stabilization for the above project.
Mr. Reed originally recommended two percent cement to be used
in the stabilization process, however it is my understanding
that the City desires at least four percent.
I asked Mr. Reed to indicate the application rate to achieve
four percent and as his letter indicates, this will require
18 pounds per square yard.
Please accept this letter as a recommended change from lime
treated subgrade to cement treated subgrade with four percent
cement. A change order has been issued to the contractor and
this change shall be reflected on the as built paving plans.
Please respond to
this change. If you have any questions
m e
copy: Mr. T~m House
Matthews Southwes~%%%~
me in written with the City's approval of
or comments, contact
reed engineering
'I
QEOTECHNIC~L GON~JLTAN'T~
October 8, xgg3
Pro,eot No. 1Z32.6
Matthews Investments Southwest
5220 spring valley Road, Suite 500
Dallas, Texas 75240
ATTN: Mr. Tim House
Soil Stabilization
Fountain Park Addition
Sandy Lake Road
Coppell, Texas
Oentlemenl
As you are aware, we recommended a minimum of two percent cement
used in order to.stabilize the paving subgrade. We understand Ge
City of Coppell is requiring that four .percent cement bt added.
Therefore, an application rate of 18 pouuds per square Yard is
rscom=ended in order to satisfy City requirements.
We trust this is the information you need. If any questions arise,
do not hesitate to call.
copies submitted: (2) Matthews Investments Southwest/Mr. Tim House
(1) Kadleck & Associates/Mr. Lynn Kadlec~, P.E.
(1) City of Coppell/Mr. Larry Davis