Loading...
Fountain Park 1-CS 930923September 23, 1993 MATTHEWS SOUTHWEST 643 P02 Via Fax; SEP 23 '93 393-7648 Mr. Howard Pafford Utilities Superintendent City of Coppefl P.O. Box 478 Coppell, TX 75019 Re: Fountain Park Addition Sandy Lake Road Water Line Conneotion Dear Mr. Pafford: Th~ purpose of this letter is to verify the discussions and agreement between you and Lynn Kadleck, my engineer on the referenced project, regarding the water line cot nections between our subdivision and the line along Sandy Lake Road. As you know, our original plans called for two connections to this line in order to provide a looped system. At that time we were not certain that we would ..be able to acquire the 3.5 acre tract immediately east of Fountain Park. On August 31 we completed the acquisition of this 3.5 acre tract, and we are presently in t~e process of zoning and platting the property for development as the connecting piece between Fountain Park and our Water's Edge project located along MacArthur Blvd. This will enable a looped water system and eliminate the need for one of the connections to Sandy Lake Road. It is my understanding that you are in agreement that we can eliminate the western water line connection (located between Lots 4 and 5 of Block A) based upon our representation tha': we will provide a connection to the tract to the east. tt is also my understanding that yoL;.r agreement is contingent upon our initiating construction activity on the adjacent tract within six months of this letter. At such time, if we have not started construction or cannot prcvide evidence that such construction is imminent, we will be required to make the second connection to the Sandy Lake water line per the original plans. Th~nk you for your consideration and cooperation on this matter, Sincerely, Vice President · TH:jad