Re 2627-9_Modifications to North Lake Dam and Spillway_2015_12_30_Roland CastanedaHi Keith, If I understand Roland's report, we are once more in
compliance.
Thanks for your help getting this done.
James
Are
Sent from my LG G3, an AT&T 4G LTE smartphone
------ Original message------
From: Storm Water
Date: Wed, Dec 30, 2015 4:26 PM
To: kmarvin@coppelltx.gov;howe1835@msn.com;
Subject:2627-9_Modifications to North Lake Dam and
Spillway_2015_12_30_Roland Castaneda
This site is under Enforcement Action. Please review the attached copy
of your inspection report. If you are unable to open the attached
report – or you are, in any way, unclear as to the nature of the
inspection report -- please call, or email the Stormwater Enforcement
Supervisor as soon as possible for assistance.
If the report has not already been signed by your on-site
representative, please sign and return a copy of this report to the
Stormwater Department, acknowledging your receipt of this report and the
information contained within. This can be e-mailed, faxed or mailed to
address shown below. In the absence of your signed copy of this
report, the automated notice of delivery and/or review will serve as
acknowledgement that you have reviewed and fully understand the contents
of this report.
FREE Construction Permit Rules & Regs Workshops
Offered by City of Dallas Stormwater Management
To learn more, click Construction Workshops Flyer
<http://wheredoesitgo.com/media/pdf/ConstructionWorkshop.pdf>
E-mail: stormwater@dallascityhall.com
<mailto:stormwater@dallascityhall.com>
Fax: 214-948-4076
Mail: ATTN: Enforcement Supervisor
Trinity Watershed Management: Stormwater Management
320 E. Jefferson Blvd. Room 108
Dallas TX 75203
Phone: 214-948-4022