Loading...
Re 2627-9_Modifications to North Lake Dam and Spillway_2015_12_30_Roland CastanedaHi Keith, If I understand Roland's report, we are once more in compliance. Thanks for your help getting this done. James Are Sent from my LG G3, an AT&T 4G LTE smartphone ------ Original message------ From: Storm Water Date: Wed, Dec 30, 2015 4:26 PM To: kmarvin@coppelltx.gov;howe1835@msn.com; Subject:2627-9_Modifications to North Lake Dam and Spillway_2015_12_30_Roland Castaneda This site is under Enforcement Action. Please review the attached copy of your inspection report. If you are unable to open the attached report – or you are, in any way, unclear as to the nature of the inspection report -- please call, or email the Stormwater Enforcement Supervisor as soon as possible for assistance. If the report has not already been signed by your on-site representative, please sign and return a copy of this report to the Stormwater Department, acknowledging your receipt of this report and the information contained within. This can be e-mailed, faxed or mailed to address shown below. In the absence of your signed copy of this report, the automated notice of delivery and/or review will serve as acknowledgement that you have reviewed and fully understand the contents of this report. FREE Construction Permit Rules & Regs Workshops Offered by City of Dallas Stormwater Management To learn more, click Construction Workshops Flyer <http://wheredoesitgo.com/media/pdf/ConstructionWorkshop.pdf> E-mail: stormwater@dallascityhall.com <mailto:stormwater@dallascityhall.com> Fax: 214-948-4076 Mail: ATTN: Enforcement Supervisor Trinity Watershed Management: Stormwater Management 320 E. Jefferson Blvd. Room 108 Dallas TX 75203 Phone: 214-948-4022