Loading...
Duke Freeport- LR160406April 6, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 25 04/05/2016 Granular Cap Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerAPR 5 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 25 Tohatsu Tuesday 04/05/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 3.75 The undersigned arrived on site, as requested, to observe the placement and compaction of granular cap for Building Pad. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the ASTM D 698-12 Method C Standard. Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 80°/ Sunny 55.00 2.50 0.25 0.75 12:00P 02:30P Granular Cap Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1800 1077396 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 04/05/16 Duke Realty Duke Realty Milton E. Perez 3953 Humbolt 5001-EZ 2882 452 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-7B Recycled Concrete, Rock Corrected Standard Proctor Method (ASTM D-698)120.50 13.30 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 BS 0 Building Pad SG 0.00 120.50 13.30 129.6 115.0 12.7 95.4 PD4S-7B 2 BS 0 Building Pad SG 0.00 120.50 13.30 129.9 115.9 12.0 96.2 PD4S-7B 3 BS 0 Building Pad SG 0.00 120.50 13.30 131.0 116.5 12.4 96.7 PD4S-7B 4 BS 0 Building Pad SG 0.00 120.50 13.30 129.6 115.9 11.8 96.2 PD4S-7B 5 BS 0 Building Pad SG 0.00 120.50 13.30 130.5 115.8 12.7 96.1 PD4S-7B 6 BS 0 Building Pad SG 0.00 120.50 13.30 130.0 115.9 12.2 96.2 PD4S-7B 7 BS 0 Building Pad SG 0.00 120.50 13.30 132.4 115.8 14.3 96.1 PD4S-7B 8 BS 0 Building Pad SG 0.00 120.50 13.30 131.2 114.8 14.3 95.3 PD4S-7B 9 BS 0 Building Pad SG 0.00 120.50 13.30 131.2 114.5 14.6 95.0 P Re-TestD4S-7B 10 BS 0 Building Pad SG 0.00 120.50 13.30 130.1 115.3 12.8 95.7 PD4S-7B 11 BS 0 Building Pad SG 0.00 120.50 13.30 130.2 115.4 12.8 95.8 PD4S-7B 12 BS 0 Building Pad SG 0.00 120.50 13.30 131.5 116.2 13.1 96.4 PD4S-7B 13 BS 0 Building Pad SG 0.00 120.50 13.30 130.3 114.9 13.4 95.4 PD4S-7B 14 BS 0 Building Pad SG 0.00 120.50 13.30 133.9 118.1 13.3 98.0 PD4S-7B 15 BS 0 Building Pad SG 0.00 120.50 13.30 131.2 114.5 14.6 95.0 PD4S-7B 16 BS 0 Building Pad SG 0.00 120.50 13.30 129.4 115.6 11.9 95.9 P Re-TestD4S-7B Test Mode: DT = Direct Transmission BS = Back Scatter WO:60826 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 2 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 04/05/16 Duke Realty Duke Realty Milton E. Perez 3953 Humbolt 5001-EZ 2882 452 Field Compaction Summary, ASTM Nuclear Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%) P / F Sample No. Comments 17 BS 0 Building Pad SG 0.00 120.50 13.30 134.9 119.2 13.2 98.9 PD4S-7B 18 BS 0 Building Pad SG 0.00 120.50 13.30 130.2 115.7 12.5 96.0 PD4S-7B 19 BS 0 Building Pad SG 0.00 120.50 13.30 130.4 116.1 12.3 96.3 PD4S-7B 20 BS 0 Building Pad SG 0.00 120.50 13.30 131.3 116.6 12.6 96.8 PD4S-7B 21 BS 0 Building Pad SG 0.00 120.50 13.30 132.9 117.9 12.7 97.8 PD4S-7B Test Mode: DT = Direct Transmission BS = Back Scatter WO:60826