Loading...
Duke Freeport- LR160506May 6, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 33 05/04/2016 Footings, Plumbing Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 6 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 33 Tohatsu Wednesday 05/04/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 6.92 The undersigned arrived on site, as requested, to observe: 1. The compaction of soils for plumbing backfill. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the ASTM D 698-12 Method A Standard. Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. The bearing capacity of soil of Footings C2, D2, E2, F2, G2, H2, J2, and K2. Utilizing a Dynamic Cone Penetrometer (ASTM STP-399) to check the bearing capacity of soil at the aforementioned locations, test results indicated that soils, at the areas and elevations tested, should be capable of supporting a foundation designed for a net allowable bearing capacity 3000 psf. 3. The placement of 18 cubic yards of 3000 psi concrete for Footings at C2, D2, E2, F2, G2, H2, J2 and K2. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. 80°/ Sunny 55.00 5.25 0.67 1.00 11:15A 04:30P Footings, Plumbing Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1705 1080090 ECS Texas, LLP 19:6710-A 33 Tohatsu Wednesday 05/04/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. Milton E. Perez, — Field Technician 2Page By 1705 1080090 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 05/04/16 Duke Realty Duke Realty Milton E. Perez 3718 Humbolt 5001-EZ 5001EZ 1781 443 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-1 Fat CLAY with Sand, Dark Brown ASTM D 698-12 Method A Standard 103.90 18.90 D4S-7B RECYCLE CONCRETE, ROCK CORRECTED Standard Proctor Method (ASTM D-698)120.50 13.30 D4S-8 Fat CLAY With Sand, Dark Brown ASTM D 698-12 Method A Standard 95.10 22.80 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 6 Plumbing (B,2.7) to (B,1.1)SG-2'6 " 0.00 95.10 22.80 120.1 95.5 25.8 100 PD4S-8 2 DT 6 Plumbing (B,2.7) to (B,1.1)SG-2'0.00 103.90 18.90 121.9 101.6 20.0 97.8 PD4S-1 3 DT 6 Plumbing (B,2.7) to (B,1.1)SG-1'6 " 0.00 103.90 18.90 123.0 98.8 24.4 95.1 PD4S-1 4 DT 6 Plumbing (B,2.7) to (B,1.1)SG-1'0.00 120.50 13.30 132.4 115.7 14.4 96.0 PD4S-7B 5 DT 6 Plumbing (B,2.7) to (B,1.1)SG-6"0.00 120.50 13.30 131.7 114.5 15.0 95.0 PD4S-7B 6 DT 6 Plumbing (B,2.7) to (B,1.1)SG 0.00 120.50 13.30 131.0 114.9 14.0 95.4 PD4S-7B 7 DT 6 Plumbing (E,1.1) to (E,1.9)SG-6"0.00 120.50 13.30 132.0 115.1 14.6 95.5 P Retest of test 8 from 4/28/16. D4S-7B 8 DT 6 Plumbing (E,1.1) to (E,1.9)SG 0.00 120.50 13.30 130.4 114.6 13.7 95.1 P Retest of test 9 from 4/28/16. D4S-7B Test Mode: DT = Direct Transmission BS = Back Scatter WO:61671 Report of Spread Footing - Foundation Observations Project: Location: Contractor: Project No. Day/Date: LocationFooting Number Size (W x H x L) Design Actual Footing Bottom Elevation Depth of Undercut (in) Description of Steel Placed Description of Subgrade Material # of Blows / increment Design Bearing Pressure Design Required Blow Counts Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell - Dallas County - TX - 75019- Duke Realty 05/04/16 6' x 2'6" x 6'C2 6' x 2'6" x 6'97.5 2.5 .1 7 #5 CLAYEY Sand 8 8.3 3000 6' x 2'6" x 6'D2 6' x 2'6" x 6'97.5 2.5 .2 7 #5 CLAYEY Sand 8 9.0 3000 6' x 2'6" x 6'E2 6' x 2'6" x 6'97.5 2.5 .3 7 #5 CLAYEY Sand 8 9.0 3000 6' x 2'6" x 6'F2 6' x 2'6" x 6'97.5 2.5 .4 7 #5 CLAYEY Sand 8 10.0 3000 6' x 2'6" x 6'G2 6' x 2'6" x 6'97.5 2.5 .5 7 #5 CLAYEY Sand 8 11.0 3000 6' x 2'6" x 6'H2 6' x 2'6" x 6'97.5 2.5 .6 7 #5 CLAYEY Sand 8 8.4 3000 6' x 2'6" x 6'J2 6' x 2'6" x 6'97.5 2.5 .7 7 #5 CLAYEY Sand 8 11.8 3000 7' x 2'6" x 7'K2 7' x 2'6" x 7'97.5 2.5 .8 8 #5 CLAYEY Sand 5 9.2 3000 ECS Texas, LLP By:Milton E. Perez WO:61671 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/04/2016 Duke Realty Sunny / 80 Duke Realty LMC Mix Designation:5150 Mix Strength:3000 psi Design Strength:3000 psi B to P min. 1 1420 63101258 9.0 9.0 01:44 02:10 02:38 *3.50 1.90(P)7854 2 5034 62996191 9.0 18.0 02:39 03:30 04:01 4.5082 * Location:By:Milton E. PerezC2, D2, E2, F2, G2, H2, J2 & K2 ECS Texas, LLP WO:61671 * B to P - Batch to Placement time in minutes 2000.1.1.0