Duke Freeport- LR160506May 6, 2016
Duke Realty
South/West Region
14241 North Dallas Parkway, Suite 1000
ATTN:Mr. Sean Jeanes, P.E. LEED AP
Tohatsu
Location:
Permits:
Dallas, TX 75254
19:6710-A
NEC Bethel Road and Freeport Parkway
Coppell, TX
RE:
ECS Job #
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
ECS Texas, LLP
LETTER OF TRANSMITTAL
Texas Registered Engineering Firm # F-8461
CC:Duke Realty - Todd Henry
Duke Realty - Glen Stevenson
Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP
City of Coppell - Matt Mabry
Weir Bros., Inc. - Mike Weir
ENCL:
We are enclosing:
Materials Engineering Division Reports
For your use
As requested
X
X
X
Field Report # 33 05/04/2016 Footings, Plumbing
Timothy TarbuttonMark R. Zortman, P.E.
Principal Engineer Project ManagerMAY 6 2016
1000.1
This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS.
ECS Texas, LLP
19:6710-A
33
Tohatsu Wednesday 05/04/2016
Project No.
Report No.
Day & DateProject
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
FIELD REPORT
6.92
The undersigned arrived on site, as requested, to observe:
1. The compaction of soils for plumbing backfill.
Utilizing the nuclear test method to check the compaction of soils; test results indicated that the
compacted material, at the areas and elevations tested, met or exceeded the project
requirements of 95% of the maximum dry density as obtained in our laboratory using the
ASTM D 698-12 Method A Standard.
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
2. The bearing capacity of soil of Footings C2, D2, E2, F2, G2, H2, J2, and K2.
Utilizing a Dynamic Cone Penetrometer (ASTM STP-399) to check the bearing capacity of soil
at the aforementioned locations, test results indicated that soils, at the areas and elevations
tested, should be capable of supporting a foundation designed for a net allowable bearing
capacity 3000 psf.
3. The placement of 18 cubic yards of 3000 psi concrete for Footings at C2, D2, E2, F2, G2,
H2, J2 and K2.
The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %,
batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees
Fahrenheit.
80°/ Sunny
55.00
5.25
0.67
1.00
11:15A 04:30P
Footings, Plumbing
Location
Contractor
On-Site Time
Lab Time
Client
Coppell, TX
Arrival Departure
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.
Duke Realty - Sean Jeanes, P.E. LEED AP
Duke Realty - Sean Jeanes, P.E. LEED AP
Trip Charges*
Remarks
Chargeable Items
Weather
Mileage*
1.00Travel Time*
Total
Time of
Re Obs.Time
* Travel time and mileage will be billed in accordance with the contract.
Tolls/Parking*
Milton E. Perez, — Field TechnicianBy 1705
1080090
ECS Texas, LLP
19:6710-A
33
Tohatsu Wednesday 05/04/2016
Project No.
Report No.
Day & DateProject
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
FIELD REPORT
Concrete observed on this date appeared to be placed in compliance with project specifications
with regard to temperature, slump, air content, and batch to placement time.
One set of five laboratory cured concrete cylinders were cast for compressive strength testing in
our laboratory.
Milton E. Perez, — Field Technician
2Page
By 1705
1080090
ECS TEXAS, LLP
Test Method ASTM Nuclear
Project No:
Contractor:
Project Name:Date:
Client:
Page 1
Technician:
Nuclear Gauge No.
Make
Model
Ser. No.
Density Std
Moisture Std
6710-A Tohatsu 05/04/16
Duke Realty
Duke Realty
Milton E. Perez
3718
Humbolt
5001-EZ
5001EZ
1781
443
Field Compaction Summary, ASTM Nuclear
Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No.
D4S-1 Fat CLAY with Sand, Dark Brown ASTM D 698-12 Method A Standard 103.90 18.90
D4S-7B RECYCLE CONCRETE, ROCK CORRECTED Standard Proctor Method (ASTM D-698)120.50 13.30
D4S-8 Fat CLAY With Sand, Dark Brown ASTM D 698-12 Method A Standard 95.10 22.80
Test Data
Test
No.
Test
Mode
Station /
Location
Probe
Depth
(in.)
Lift /
Elev
Corrected
Maximum
Dry
Density
(pcf)
Corrected
Optimum
Moisture
Content
(%)
%
Oversize
Wet
Density
(pcf)
Dry
Density
(pcf)
Moisture
Content
(%)
Percent
Comp.
(%)CommentsP / F
Sample No.
1 DT 6 Plumbing (B,2.7) to (B,1.1)SG-2'6
"
0.00 95.10 22.80 120.1 95.5 25.8 100 PD4S-8
2 DT 6 Plumbing (B,2.7) to (B,1.1)SG-2'0.00 103.90 18.90 121.9 101.6 20.0 97.8 PD4S-1
3 DT 6 Plumbing (B,2.7) to (B,1.1)SG-1'6
"
0.00 103.90 18.90 123.0 98.8 24.4 95.1 PD4S-1
4 DT 6 Plumbing (B,2.7) to (B,1.1)SG-1'0.00 120.50 13.30 132.4 115.7 14.4 96.0 PD4S-7B
5 DT 6 Plumbing (B,2.7) to (B,1.1)SG-6"0.00 120.50 13.30 131.7 114.5 15.0 95.0 PD4S-7B
6 DT 6 Plumbing (B,2.7) to (B,1.1)SG 0.00 120.50 13.30 131.0 114.9 14.0 95.4 PD4S-7B
7 DT 6 Plumbing (E,1.1) to (E,1.9)SG-6"0.00 120.50 13.30 132.0 115.1 14.6 95.5 P Retest of test 8
from 4/28/16.
D4S-7B
8 DT 6 Plumbing (E,1.1) to (E,1.9)SG 0.00 120.50 13.30 130.4 114.6 13.7 95.1 P Retest of test 9
from 4/28/16.
D4S-7B
Test Mode: DT = Direct Transmission BS = Back Scatter WO:61671
Report of Spread Footing - Foundation Observations
Project:
Location:
Contractor:
Project No.
Day/Date:
LocationFooting
Number
Size (W x H x L)
Design Actual
Footing Bottom Elevation
Depth of
Undercut (in)
Description of
Steel Placed
Description of
Subgrade
Material
# of Blows / increment
Design
Bearing
Pressure
Design
Required Blow Counts
Tohatsu 6710-A
NEC Bethel Road and Freeport Parkway
Coppell - Dallas County - TX - 75019-
Duke Realty
05/04/16
6' x 2'6" x 6'C2 6' x 2'6" x 6'97.5 2.5 .1 7 #5 CLAYEY Sand 8
8.3 3000
6' x 2'6" x 6'D2 6' x 2'6" x 6'97.5 2.5 .2 7 #5 CLAYEY Sand 8
9.0 3000
6' x 2'6" x 6'E2 6' x 2'6" x 6'97.5 2.5 .3 7 #5 CLAYEY Sand 8
9.0 3000
6' x 2'6" x 6'F2 6' x 2'6" x 6'97.5 2.5 .4 7 #5 CLAYEY Sand 8
10.0 3000
6' x 2'6" x 6'G2 6' x 2'6" x 6'97.5 2.5 .5 7 #5 CLAYEY Sand 8
11.0 3000
6' x 2'6" x 6'H2 6' x 2'6" x 6'97.5 2.5 .6 7 #5 CLAYEY Sand 8
8.4 3000
6' x 2'6" x 6'J2 6' x 2'6" x 6'97.5 2.5 .7 7 #5 CLAYEY Sand 8
11.8 3000
7' x 2'6" x 7'K2 7' x 2'6" x 7'97.5 2.5 .8 8 #5 CLAYEY Sand 5
9.2 3000
ECS Texas, LLP
By:Milton E. Perez
WO:61671
Concrete Summary Report
Project:
Location:
Contractor :
Supplier:
Project No.
Day/Date:
Client:
Weather / Temp:
Page 1
No.Ticket
No.
Truck
No.
CY Concrete
Truck Cum
Batch
Time
Truck Time
Arrive Finish Slump % Air Concrete
Temp.
Water
Added Location and Remarks
Tohatsu 6710-A
NEC Bethel Road and Freeport Parkway
Coppell, - Dallas County - TX 75019-
05/04/2016
Duke Realty
Sunny / 80
Duke Realty
LMC
Mix Designation:5150 Mix Strength:3000 psi Design Strength:3000 psi
B to P
min.
1 1420 63101258 9.0 9.0 01:44 02:10 02:38 *3.50 1.90(P)7854
2 5034 62996191 9.0 18.0 02:39 03:30 04:01 4.5082
* Location:By:Milton E. PerezC2, D2, E2, F2, G2, H2, J2 & K2
ECS Texas, LLP
WO:61671
* B to P - Batch to Placement time in minutes
2000.1.1.0