Loading...
Duke Freeport- LR160516 (2)May 16, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 41 05/13/2016 Pour 2, Grout obs Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 16 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 41 Tohatsu Friday 05/13/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 11.50 The undersigned arrived on site, as requested, to observe: 1. The placement of 468 cubic yards of 3500 psi concrete for Slab on Grade at Building Pad, Pour 2. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. Six sets of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 2. Visual observation of high strength non-shrink grout for Column B-2 base plate. 87°/ Sunny 55.00 9.25 1.25 0.00 06:15A 03:30P Pour 2, Grout obs Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1800 1080643 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 1 1408 64406587 9.0 9.0 06:29 07:03 07:26 *5.25 1.30(P)7157 2 7044 64406591 9.0 18.0 06:38 07:15 07:47 5.0069 3 1373 64406588 9.0 27.0 06:32 07:15 07:47 75 4 1374 64406589 9.0 36.0 06:33 07:20 07:56 5.5083 5 9113 64406590 9.0 45.0 06:38 07:25 07:59 2081 6 9168 64406592 9.0 54.0 06:34 07:30 08:01 87 7 5030 63101697 9.0 63.0 07:15 07:40 08:09 54 8 7060 63101699 9.0 72.0 07:31 07:57 08:23 52 9 0002 62996721 9.0 81.0 07:28 07:58 08:24 5.2556 10 0000 00000000 9.0 90.0 07:35 08:04 08:28 53 11 0006 62996722 9.0 99.0 07:35 08:11 08:34 59 12 0001 62996723 9.0 108.0 07:38 08:20 08:50 72 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 2 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 13 0004 62996724 9.0 117.0 07:24 08:23 08:47 *5.25 1.60(P)7783 14 0005 62996726 9.0 126.0 07:56 08:25 09:05 69 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 3 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 15 0003 62996725 9.0 135.0 07:52 08:27 08:56 4.7564 16 5030 63101704 9.0 144.0 08:14 08:35 08:58 44 17 1373 64406606 9.0 153.0 08:07 08:50 09:10 63 18 9140 62996730 9.0 162.0 08:17 08:51 09:13 5.2556 19 7017 64406607 9.0 171.0 08:13 08:52 09:14 *5.50 2.10(P)7761 20 7067 62996732 9.0 180.0 08:27 09:05 09:36 5.0069 21 3035 62996731 9.0 189.0 08:22 09:05 09:39 1077 22 9168 64406608 9.0 198.0 08:20 09:06 09:44 5.25 1084 23 1407 62996733 9.0 207.0 08:32 09:18 09:31 359 24 7058 64406617 9.0 216.0 09:00 09:30 09:48 48 25 7006 64406618 9.0 225.0 09:06 09:44 10:01 5.2555 26 9150 64406622 9.0 234.0 09:20 09:52 10:13 53 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 4 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 27 0001 62996741 9.0 243.0 09:19 09:52 10:24 365 28 5013 64406615 9.0 252.0 09:07 10:00 10:25 78 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 5 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 29 1421 64406616 9.0 261.0 09:14 10:00 10:36 4.7582 30 1416 64406623 9.0 270.0 09:28 10:13 10:30 5.0062 31 0006 62996742 9.0 279.0 09:24 10:14 10:35 *4.50 1.70(P)7671 32 0002 62996743 9.0 288.0 09:32 10:18 10:35 63 33 3030 64406629 9.0 297.0 09:46 10:33 10:58 72 34 0004 62996744 9.0 306.0 09:40 10:34 10:52 5.2572 35 0003 62996748 9.0 315.0 10:00 10:44 11:01 4.7561 36 9140 62996749 9.0 324.0 10:13 10:47 11:24 71 37 7060 63101717 9.0 333.0 10:39 11:11 11:38 5.5059 38 6036 62996751 9.0 342.0 10:43 11:22 11:46 5.2563 39 0005 62996752 9.0 351.0 10:50 11:32 11:53 63 40 1407 62996754 9.0 360.0 11:02 11:59 12:21 79 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 6 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 41 5034 62996756 9.0 369.0 11:13 12:00 12:27 74 42 7006 63101720 9.0 378.0 11:30 12:16 12:57 87 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 7 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/13/2016 Duke Realty Sunny / 87 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 43 6037 62996757 9.0 387.0 11:17 12:17 12:39 *4.75 8882 44 5030 62996759 9.0 396.0 11:37 12:17 12:51 574 45 1416 63101722 9.0 405.0 11:51 12:17 01:04 4.5073 46 9131 62996761 9.0 414.0 11:48 12:21 12:49 5.25 1061 47 9150 64406645 9.0 423.0 12:08 12:39 01:03 55 48 7060 63101725 9.0 432.0 12:18 12:44 01:19 5.25 561 49 1410 64406647 9.0 441.0 12:19 12:49 01:19 360 50 1425 64406649 9.0 450.0 12:20 12:53 01:28 5.50 1068 51 9126 64406650 9.0 459.0 12:40 01:14 01:46 66 52 3014 62996771 9.0 468.0 12:53 01:28 01:58 *5.25 1.30(P)7865 * Location:By:Milton E. PerezBuilding Pad, Pour 2 ECS Texas, LLP WO:62017 * B to P - Batch to Placement time in minutes 2000.1.1.0