Loading...
Duke Freeport- LR160815May 18, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 42 05/13/2016 Floor Flatness Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 18 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 42 Tohatsu Friday 05/13/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 6.25 The undersigned arrived on-site, as requested, to perform floor flatness and levelness testing for the Slab on Grade, Pour 2. Please see attached sketch and graphs. The testing was performed in accordance with ASTM E 1155 using a D-meter®. The project specifications identify the test surface as having Minimum Overall Requirements of FF 35 and FL 25 and Minimum Local Requirements of FF 25 and FL 17. Based on the results of our testing, the areas tested met or exceeded both the minimum local and overall values (FF = 66.7, FL = 46.6). 85°/ Sunny 55.00 5.00 0.25 0.00 01:30P 06:30P Floor Flatness Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Shree Ram BhattaraiBy 1800 1080843 16 - M a y - 1 6 OA F F O A F L ML F F M L F L Pr o j A r e a 35 2 5 25 1 7 10 8 5 4 0 Po u r 2 1 3 - M a y - 1 6 2 7 0 0 0 6 6 . 7 4 6 . 6 27 0 0 0 8 1 4 7 7 8 8 4 6 6 . 7 4 6 . 6 81 5 4 0 2 8 . 4 2 0 . 5 27 0 0 0 6 6 . 7 4 6 . 6 2 7 0 0 0 8 1 4 7 7 8 8 4 66 . 7 4 6 . 6 81 5 4 0 2 8 . 4 2 0 . 5 Ca r r o l l t o n , T e x a s 7 5 0 0 6 © 2 0 0 7 A l l e n F a c e & C o m p a n y L L C Co p p e l l , T e x a s (9 7 2 ) 3 9 2 - 3 2 2 2 Po u r 2 S O G EC S - T e x a s , L L P DA I L Y F - N U M B E R R E P O R T 30 3 3 K e l l w a y D r i v e , S u i t e 1 1 0 NE C F r e e p o r t a n d B e t h e l DA I L Y R E S U L T S CO M P L E T E D W O R K RE M A I N I N G W O R K Sl a b I D D a t e P l a c e d S l a b A r e a Me a s u r e d FF Me a s u r e d FL To t a l A r e a In - P l a c e Un e q u a l F F Ar e a Required FF Required FL LA T E S T R E S U L T S : Un e q u a l F L Ar e a Ov e r a l l FF Ov e r a l l FL Ar e a Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2 Tohatsu, Coppell, Texas Pour 2