Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Duke Freeport- LR160523
May 23, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 46 05/18/2016 Floor Flatness Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 23 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 46 Tohatsu Wednesday 05/18/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 12.17 The undersigned arrived on-site, as requested, to perform floor flatness and levelness testing for the Slab on Grade, Pour 3. Please see attached sketch and graphs. The testing was performed in accordance with ASTM E 1155 using a D-meter®. The project specifications identify the test surface as having Minimum Overall Requirements of FF 35 and FL 25 and Minimum Local Requirements of FF 25 and FL 17. Based on the results of our testing, the areas tested met or exceeded both the minimum local and overall values (FF = 67.4, FL = 43.6). 63°/ Rain 55.00 11.00 0.25 0.00 01:00P 12:00A Floor Flatness Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 0.92Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Shree Ram BhattaraiBy 1800 1081441 20-May-16 OAFF OAFL MLFF MLFL Proj Area 35 25 25 17 108000 A-3 to L-4 (Pour 2)13-May-16 27000 66.7 46.6 27000 8147 7884 66.7 46.6 81000 28.4 20.4 A-2 to L-3 (Pour 3)18-May-16 27000 67.4 43.6 54000 16416 14970 67.0 45.1 54000 18.2 13.7 27000 67.4 43.6 54000 16416 14970 67.0 45.1 54000 18.2 13.7 Required FF Required FL LATEST RESULTS : Total Area In-Place Unequal FF Area Unequal FL Area Overall FF Overall FL Area (972) 392-3222 First Level slab DAILY RESULTS COMPLETED WORK REMAINING WORK Slab ID Date Placed Slab Area Measured FF Measured FL ECS-Texas, LLP DAILY F-NUMBER REPORT Tohatsu Build to Suit 3033 Kellway Drive, Suite 110 Freeport pky and Bethal rd Carrollton, Texas 75006 © 2007 Allen Face & Company LLC Coppell, Tx Tohatsu, Coppell, TX Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3 Tohatsu, Coppell, Texas Pour 3