Loading...
Duke Freeport- LR160523 (2)May 23, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 44 05/17/2016 Utility BF, Reinforc Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 23 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 44 Tohatsu Tuesday 05/17/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 3.75 The undersigned arrived on site, as requested, to observe the compaction of soils for utility backfill. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density and moisture content above OMC as obtained in our laboratory using the ASTM D 698-12 Method A Standard. Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. Reinforcing Steel observation for Slab on Grade, Pour 3. After reviewing the applicable structural drawings, reinforcing steel and accessories appeared to be properly installed. 3. Visual observation of high strength non-shrink grout for Column B-2 base plate. 80°/ Sunny 55.00 2.25 0.50 1.00 01:30P 03:45P Utility BF, Reinforc Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1800 1081281 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 05/17/16 Duke Realty Duke Realty Milton E. Perez 66373 Nuclear 3430 3430 1998 630 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-3 Clayey SAND, Light Brown ASTM D 698-12 Method A Standard 117.40 12.00 D4S-5 Clayey SAND, Light Brown ASTM D 698-12 Method A Standard 116.70 11.40 D4S-6 Sandy Fat CLAY, Light Gray ASTM D 698-12 Method A Standard 105.70 18.10 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 6 Electrical Line SG 0.00 116.70 11.40 131.9 114.3 15.3 97.9 PD4S-5 2 DT 6 Electrical Line SG 0.00 116.70 11.40 133.2 113.4 17.4 97.2 PD4S-5 3 DT 6 Electrical Line SG-1'6 " 0.00 117.40 12.00 136.7 117.2 16.6 99.8 PD4S-3 4 DT 6 Electrical Line SG-1'6 " 0.00 117.40 12.00 136.0 116.0 17.2 98.8 PD4S-3 5 DT 6 Electrical Line SG-1'0.00 117.40 12.00 136.4 116.6 16.9 99.3 PD4S-3 6 DT 6 Electrical Line SG-1'0.00 117.40 12.00 135.0 115.8 16.5 98.6 PD4S-3 7 DT 6 Electrical Line SG-6"0.00 117.40 12.00 132.8 112.8 17.7 96.1 PD4S-3 8 DT 6 Electrical Line SG-6"0.00 117.40 12.00 130.4 111.5 16.9 95.0 PD4S-3 9 DT 6 Electrical Line SG 0.00 117.40 12.00 131.6 113.5 15.9 96.7 PD4S-3 10 DT 6 Electrical Line SG 0.00 117.40 12.00 136.1 116.6 16.7 99.3 PD4S-3 11 DT 6 Electrical Line SG-1'8 " 0.00 105.70 18.10 124.9 102.2 22.3 96.7 P Re-test of test 3 taken on 5/6/16 D4S-6 Test Mode: DT = Direct Transmission BS = Back Scatter WO:62113