Loading...
Duke Freeport- LR160524 (2)May 24, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 48 05/20/2016 Storm BF, Headwall Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerMAY 24 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 48 Tohatsu Friday 05/20/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 4.33 The undersigned arrived on site, as requested, to observe: 1. The compaction of soils for Storm Line, ST-3. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density and moisture content above OMC as obtained in our laboratory using the Standard Proctor Method (ASTM D698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. The placement of 10 cubic yards of 4000 psi concrete for Headwall at Storm Line, ST-1, STA 0+00 The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 79°/ Sunny 55.00 3.25 0.25 0.00 01:30P 04:45P Storm BF, Headwall Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 0.83Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Samson Belay AyalewBy 1800 1081715 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 05/20/16 Duke Realty Duke Realty Samson Belay Ayalew 28770 Troxler 3440 1973 617 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-1 Fat CLAY with Sand, Dark Brown Standard Proctor Method (ASTM D-698)103.90 18.90 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 6 ST-3, STA 0+20 SG-5'5.00 105.93 18.05 124.1 102.4 21.2 96.7 PD4S-1 2 DT 6 ST-3, STA 0+70 SG-5'5.00 105.93 18.05 123.4 101.7 21.3 96.0 PD4S-1 3 DT 6 ST-3, STA 0+20 SG-4. 5' 5.00 105.93 18.05 125.4 104.3 20.2 98.5 PD4S-1 4 DT 6 ST-3, STA 0+70 SG-4. 5' 0.00 103.90 18.90 122.7 102.5 19.7 98.7 PD4S-1 5 DT 6 ST-3, STA 0+20 SG-4'5.00 105.93 18.05 121.8 101.3 20.2 95.6 PD4S-1 6 DT 6 ST-3, STA 0+70 SG-4'5.00 105.93 18.05 123.0 104.0 18.3 98.2 PD4S-1 Test Mode: DT = Direct Transmission BS = Back Scatter WO:62204 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 05/20/2016 Duke Realty Sunny / 79 Duke Realty Redi-Mix Concrete Mix Designation:10L11524 Mix Strength:4000 psi Design Strength:4000 psi B to P min. 1 0000 25313973 10.0 10.0 02:30 03:00 03:40 *3.25 3.60(P)9170 * Location:By:Samson Belay AyalewHeadwall, ST-1, STA 0+00 ECS Texas, LLP WO:62204 * B to P - Batch to Placement time in minutes 2000.1.1.0