Duke Freeport- LR160601June 1, 2016
Duke Realty
South/West Region
14241 North Dallas Parkway, Suite 1000
ATTN:Mr. Sean Jeanes, P.E. LEED AP
Tohatsu
Location:
Permits:
Dallas, TX 75254
19:6710-A
NEC Bethel Road and Freeport Parkway
Coppell, TX
RE:
ECS Job #
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
ECS Texas, LLP
LETTER OF TRANSMITTAL
Texas Registered Engineering Firm # F-8461
CC:Duke Realty - Todd Henry
Duke Realty - Glen Stevenson
Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP
City of Coppell - Matt Mabry
Weir Bros., Inc. - Mike Weir
ENCL:
We are enclosing:
Materials Engineering Division Reports
For your use
As requested
X
X
X
Field Report # 53 05/24/2016 Compaction
Timothy TarbuttonMark R. Zortman, P.E.
Principal Engineer Project ManagerJUN 1 2016
1000.1
This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS.
ECS Texas, LLP
19:6710-A
53
Tohatsu Tuesday 05/24/2016
Project No.
Report No.
Day & DateProject
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
FIELD REPORT
5.08
The undersigned arrived on site, as requested, to observe the compaction of soils for Pavement
Subgrade, Water Line W-1, Storm Sewer Line ST-3, and Building Pad Pour 4 Subgrade.
Utilizing the nuclear test method to check the compaction of soils; test results indicated that the
compacted material, at the areas and elevations tested, met or exceeded the project
requirements of 95% of the maximum dry density and moisture content above OMC as
obtained in our laboratory using the ASTM D 698-12 Method A Standard.
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
66°/ Cloudy
55.00
2.50
0.58
0.00
08:00A 09:00A
Compaction
Location
Contractor
On-Site Time
Lab Time
01:30P 03:00P
Client
Coppell, TX
Arrival Departure
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.
Duke Realty - Sean Jeanes, P.E. LEED AP
Duke Realty - Sean Jeanes, P.E. LEED AP
Trip Charges*
Remarks
Chargeable Items
Weather
Mileage*
2.00Travel Time*
Total
Times of
Re Obs.Time
* Travel time and mileage will be billed in accordance with the contract.
Tolls/Parking*
Milton E. Perez, — Field TechnicianBy 1800
1082622
ECS TEXAS, LLP
Test Method ASTM Nuclear
Project No:
Contractor:
Project Name:Date:
Client:
Page 1
Technician:
Nuclear Gauge No.
Make
Model
Ser. No.
Density Std
Moisture Std
6710-A Tohatsu 05/24/16
Duke Realty
Duke Realty
Milton E. Perez
66373
Troxler
3430
3430
2003
575
Field Compaction Summary, ASTM Nuclear
Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No.
D4S-1 Fat CLAY with Sand, Dark Brown ASTM D 698-12 Method A Standard 103.90 18.90
D4S-5 Clayey SAND, Light Brown ASTM D 698-12 Method A Standard 116.70 11.40
D4S-6 Sandy Fat CLAY, Light Gray ASTM D 698-12 Method A Standard 105.70 18.10
D4S-7 Recycle Concrete, Rock Correction Standard Proctor Method (ASTM D-698)120.50 13.30
Test Data
Test
No.
Test
Mode
Station /
Location
Probe
Depth
(in.)
Lift /
Elev
Corrected
Maximum
Dry
Density
(pcf)
Corrected
Optimum
Moisture
Content
(%)
%
Oversize
Wet
Density
(pcf)
Dry
Density
(pcf)
Moisture
Content
(%)
Percent
Comp.
(%)CommentsP / F
Sample No.
1 DT 6 Pavement North Side of the Building Pad SG 0.00 116.70 11.40 129.9 111.8 16.1 95.8 PD4S-5
2 DT 6 Pavement North Side of the Building Pad SG 0.00 116.70 11.40 130.3 111.1 17.3 95.2 PD4S-5
3 DT 6 Pavement South Side of the Building Pad SG 0.00 105.70 18.10 125.7 105.1 19.6 99.4 PD4S-6
4 DT 6 Pavement South Side of the Building Pad SG 0.00 116.70 11.40 128.9 110.9 16.2 95.0 PD4S-5
5 DT 6 Water Line, W -1, Sta 15+70 SG 0.00 103.90 18.90 121.2 99.9 21.4 96.2 PD4S-1
6 DT 6 Water Line, W -1, STA 0+25 SG 0.00 103.90 18.90 123.0 100.7 22.1 96.9 PD4S-1
7 DT 6 Storm Sewer Line, ST-3, STA 0+20 SG-2'4
"
0.00 103.90 18.90 122.8 100.5 22.2 96.7 PD4S-1
8 DT 6 Storm Sewer Line, ST-3, STA 0+20 SG-1'6
"
0.00 105.70 18.10 125.8 103.5 21.5 97.9 PD4S-6
9 DT 6 Storm Sewer Line, ST-3, STA 0+20 SG-8"0.00 103.90 18.90 122.3 101.2 20.8 97.4 PD4S-1
10 DT 6 Storm Sewer Line, ST-3, STA 0+20 SG 0.00 103.90 18.90 123.6 102.0 21.2 98.2 PD4S-1
11 DT 2 Building Pad SG 0.00 120.50 13.30 133.7 116.9 14.3 97.0 PD4S-7
Test Mode: DT = Direct Transmission BS = Back Scatter WO:62425
ECS TEXAS, LLP
Test Method ASTM Nuclear
Project No:
Contractor:
Project Name:Date:
Client:
Page 2
Technician:
Nuclear Gauge No.
Make
Model
Ser. No.
Density Std
Moisture Std
6710-A Tohatsu 05/24/16
Duke Realty
Duke Realty
Milton E. Perez
66373
Troxler
3430
3430
2003
575
Field Compaction Summary, ASTM Nuclear
Test Data
Test
No.
Test
Mode
Station /
Location
Probe
Depth
(in.)
Lift /
Elev
Corrected
Maximum
Dry
Density
(pcf)
Corrected
Optimum
Moisture
Content
(%)
%
Oversize
Wet
Density
(pcf)
Dry
Density
(pcf)
Moisture
Content
(%)
Percent
Comp.
(%)
P / F
Sample No.
Comments
12 DT 2 Building Pad SG 0.00 120.50 13.30 131.6 115.4 14.0 95.8 PD4S-7
Test Mode: DT = Direct Transmission BS = Back Scatter WO:62425