Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Duke Freeport- LR160609
June 9, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 57 06/07/2016 Pour 4 Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUN 9 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 57 Tohatsu Tuesday 06/07/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 11.25 The undersigned arrived on site, as requested, to observe the placement of 414 cubic yards of 3500 psi concrete for slab on grade, Pour 4. Please see attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time, with some exceptions, please see attached summary. Five sets of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. During initial curing, the curing box was moved by a subcontractor and six of the cylinders were tipped over. The cylinders were set upright to finish initial curing. 92°/ Sunny 55.00 8.75 1.00 0.00 06:30A 03:15P Pour 4 Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.50Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1800 1083129 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 1 5022 63102278 9.0 9.0 06:27 06:53 07:17 *5.50 1.40(P)8050 2 1420 63102280 9.0 18.0 06:38 07:06 07:31 53 3 0006 62997547 9.0 27.0 06:59 07:18 07:38 39 4 1416 64408054 9.0 36.0 06:55 07:42 08:03 5.2568 5 0003 62997548 9.0 45.0 07:03 07:52 08:06 563 6 0001 62997555 9.0 54.0 07:48 08:25 08:41 5.75 553 7 0004 62997553 9.0 63.0 07:53 08:25 08:40 5.7547 8 0005 62997554 9.0 72.0 07:41 08:30 08:47 66 9 7067 62997558 9.0 81.0 08:04 08:43 08:59 *8.00 1.00(P)82 555 10 7025 62997557 9.0 90.0 07:59 08:48 09:02 63 11 5023 62997559 9.0 99.0 08:10 08:52 09:23 73 12 6037 62997560 9.0 108.0 08:14 09:00 09:21 6.0067 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 2 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 13 9142 62997562 9.0 117.0 08:27 09:09 09:33 6.25 1066 14 1417 62997561 9.0 126.0 08:23 09:10 09:39 76 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 3 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 15 3035 62997563 9.0 135.0 08:31 09:20 09:44 73 16 0003 62997566 9.0 144.0 08:53 09:32 09:51 5.7558 17 0007 62997567 9.0 153.0 08:58 09:35 10:04 66 18 7060 63102297 9.0 162.0 09:16 09:44 10:10 1054 19 5030 62997568 9.0 171.0 09:13 09:45 10:06 6.0053 20 0004 62997569 9.0 180.0 09:17 10:05 10:27 70 21 1420 63102300 9.0 189.0 09:47 10:11 10:37 *5.50 1.40(P)8650 22 0001 62997572 9.0 198.0 09:37 10:13 10:46 5.2569 23 5022 63102301 9.0 207.0 09:53 10:18 10:46 553 24 0000 00000000 9.0 216.0 09:43 10:20 10:41 58 25 7025 62997571 9.0 225.0 09:31 10:25 10:47 76 26 6037 62997575 9.0 234.0 09:52 10:30 10:51 5.0059 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 4 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 27 0005 62997574 9.0 243.0 09:46 10:30 10:51 5.2565 28 9142 62997577 9.0 252.0 10:03 10:36 10:54 5.50 1051 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 5 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 29 7067 62997578 9.0 261.0 10:08 10:38 10:59 51 30 5034 62997576 9.0 270.0 09:59 10:45 11:04 565 31 1417 62997579 9.0 279.0 10:13 10:46 11:10 *5.00 2.30(P)8757 32 3035 62997580 9.0 288.0 10:20 10:52 11:23 63 33 6036 62997581 9.0 297.0 10:26 11:15 11:33 4.7567 34 0007 62997582 9.0 306.0 10:37 11:16 11:56 79 35 7060 63102309 9.0 315.0 10:54 11:20 11:41 747 36 0001 62997584 9.0 324.0 11:08 11:50 12:21 73 37 5030 63102312 9.0 333.0 11:25 11:50 12:26 5.2561 38 0004 62997585 9.0 342.0 11:13 12:02 12:28 5.0075 39 0003 62997587 9.0 351.0 11:24 12:07 12:36 5.2572 40 9142 62997591 9.0 360.0 11:51 12:26 12:51 1060 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 6 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 41 6037 62997590 9.0 369.0 11:44 12:30 12:52 68 42 1417 62997594 9.0 378.0 12:10 12:43 01:16 *4.75 1.90(P)8866 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 7 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/07/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:1418 Mix Strength:3500 psi Design Strength:3500 psi B to P min. 43 7060 63102318 9.0 387.0 12:45 01:11 01:35 50 44 9141 62997597 9.0 396.0 12:57 01:35 01:58 61 45 5030 63102324 9.0 405.0 01:27 01:50 02:14 47 46 0007 62997600 9.0 414.0 01:37 02:00 02:30 53 * Location:By:Milton E. PerezSlab on grade, Pour 4 ECS Texas, LLP WO:62593 * B to P - Batch to Placement time in minutes 2000.1.1.0