Loading...
Duke Freeport- LR160613LETTER OF TRANSMITTAL TO: ATTN: JOB NO.: DATE: RE: PERMIT #: LOCATION: We are enclosing: Attached Materials Engineering Division Concrete Reports:As Requested CC: By: For Your Use 06/13/2016 Tohatsu NEC Bethel Road and Freeport Parkway, Coppell, TX 006710A Mr. Sean Jeanes, P.E. LEED AP Duke Realty South/W est Region 14241 North Dallas Parkway, Suite 1000 Dallas, TX 75254 Duke Realty - Todd Henry Duke Realty - Glen Stevenson Mark R. Zortman, P.E. Principal Engineer Pacheco Koch Consulting Engineers - Clayton J. Strolle, City of Coppell - Matt Mabry Weir Bros., Inc. - Mike W eir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz Timothy Tarbutton Project Manager 22 CONCRETE, GROUT, AND MORTAR TESTS3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] X X X X Dallas County JUN 13 2016 ECS Texas, LLP Texas Registered Engineering Firm # F-8461 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 3000 psi Project: Location: Report No.: Design Strength: Cast Date: Tohatsu NEC Bethel Road and Freeport Parkway,22 06/06/2016 6710-AProject : 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] Concrete Cylinders Strength Report Set Designation:A ECS Texas, LLP Owner: Struc. Eng.: Client: Gen. Contr.: Conc. Contr.: Placement Location: Concrete Supplier:Truck No: Mix Designation: Ticket No: Mix Strength:Batch Time: Arch.: Duke Realty - Sean Jeanes, P.E. LEED Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz Duke Realty - Glen Stevenson Continuous Footings at Grind lines A-E/1 LMC 0000 00000000 5150 3000 psi 02:30PM 0Added W ater: 90º F Air Content:Temperature - Air:Concrete: Time Sampled:Slump: Sample No Test Date Test Age Type Cure Breaking Load,lbs Compr. Str.,psi Brk Typ Review by FIELD TEST DATA:Milton E. Perez 03:03PM 5.00 in. 2.40 % (P) Tested by: 89º F Average Measured Diameter in. Avg. Measured Cross-Sectional Area in.-sq 29903776013514806/13/2016 7 Lab 4.01 12.62 3 TT02 135149 07/04/2016 28 Lab 135150 07/04/2016 28 Lab 135151 07/04/2016 28 Lab 135152 08/01/2016 56 Lab FIELD CURING CONDITIONS: Curing Box Insulated Heated Cooled Caps Remarks: Final Review By: X X Sampling in accordance with (iaw) ASTM C172, except that samples may have been taken from the beginning of the load after a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit weight iaw ASTM C138. Cylinders are tested using unbonded caps iaw ASTM C1231 or bonded caps iaw C617. Break Types are classified as: Type 1, 2, 3, 4, 5, or 6 iaw C39. No Curing Box Ice Other Print Date:06/13/2016 TT02 BR01